Difference between revisions of "West Sole Area Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 2: | Line 2: | ||
* Operator: Perenco | * Operator: Perenco | ||
* Country: UK | * Country: UK | ||
| − | * Location: | + | * Location: Southern North Sea |
* Production start: | * Production start: | ||
* Partners: | * Partners: | ||
| Line 10: | Line 10: | ||
=== Description === | === Description === | ||
| − | * | + | * The West Sole Alpha platform consists of steel legged platforms, which includes process facilities and accommodation and receives gas and fluids from all of the associated tie-backs. |
| + | * Processed gas and some fluids are routed to the onshore Dimlington Gas Terminal located on the Yorkshire coast via a 71.9 kilometre 16 inch diameter pipeline (PL28), through the West Sole Alpha platform through a 68 kilometre 24 inch diameter pipeline (PL145) and through the Amethyst A2D platform via a 47.7km 30 inch diameter pipeline (PL649). | ||
| + | * Hyde, Hoton and Amethyst are tied back to the West Sole Hub | ||
=== Contractors === | === Contractors === | ||
Revision as of 16:40, 29 June 2024
Summary Information
- Operator: Perenco
- Country: UK
- Location: Southern North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The West Sole Alpha platform consists of steel legged platforms, which includes process facilities and accommodation and receives gas and fluids from all of the associated tie-backs.
- Processed gas and some fluids are routed to the onshore Dimlington Gas Terminal located on the Yorkshire coast via a 71.9 kilometre 16 inch diameter pipeline (PL28), through the West Sole Alpha platform through a 68 kilometre 24 inch diameter pipeline (PL145) and through the Amethyst A2D platform via a 47.7km 30 inch diameter pipeline (PL649).
- Hyde, Hoton and Amethyst are tied back to the West Sole Hub
Contractors
- -
History
- 2001 - Approval granted for Hoton