Difference between revisions of "Vampire, Viscount and Valkyrie Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform | * The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform | ||
* The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform | * The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform | ||
− | * Valkyrie | + | * Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform |
* Gas is transported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]] to the Theddlethorpe Gas Processing Plant | * Gas is transported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]] to the Theddlethorpe Gas Processing Plant | ||
− | + | === Contractors === | |
* **Odebrecht:** T&I for Vampire platform | * **Odebrecht:** T&I for Vampire platform | ||
− | + | === History === | |
* 1998 - Vampire development approval granted | * 1998 - Vampire development approval granted | ||
* 2002 - Development approval for Viscount | * 2002 - Development approval for Viscount | ||
Line 25: | Line 25: | ||
* 2021 - Premier Oil and Chrysaor merge to create Harbour Energy | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[List Of Oil and Gas Production Platforms In The UK]] | # [[List Of Oil and Gas Production Platforms In The UK]] | ||
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] |
Latest revision as of 12:18, 29 June 2024
Summary Information
- Operator: Harbour Energy
- Country: UK
- Location: 049/16
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform
- The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform
- Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform
- Gas is transported via the Lincolnshire Offshore Gas Gathering System (Loggs) to the Theddlethorpe Gas Processing Plant
Contractors
- **Odebrecht:** T&I for Vampire platform
History
- 1998 - Vampire development approval granted
- 2002 - Development approval for Viscount
- 2004 - Valkyrie granted development approval
- 2019 - Chrysaor acquired Conocophillips's stake in the field
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy