Difference between revisions of "North Idku Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Energean |
* Country: Egypt | * Country: Egypt | ||
* Location: Nile Delta | * Location: Nile Delta | ||
− | * Production start: | + | * Production start: 2023 |
− | * Partners: | + | * Partners: |
* Type: Gas | * Type: Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * The gas | + | * The North El Amirya and North Idku fields were developed together, as satellite fields to the [[Abu Qir Gas Fields | Abu Qir gas-condensate offshore and onshore infrastructure]]. |
+ | * Multiple wells were completed and tied back to the North Abu Qir III platform. | ||
+ | * NEA contains two discovered and appraised gas fields (Yazzi and Python). NI – which is split into northern 21 and southern areas – contains four discovered gas fields, one of which is readied for development. | ||
+ | * Both areas contain additional mapped but undrilled prospects. | ||
=== Contractors === | === Contractors === | ||
Line 22: | Line 25: | ||
* 2008 - RWE announces field development | * 2008 - RWE announces field development | ||
* 2019 - Energean acquired a stake in the field from Edison | * 2019 - Energean acquired a stake in the field from Edison | ||
+ | * 2023 - First gas produced | ||
* 2024 - Carlyle International Energy Partners agreed to acquire Energean's stake | * 2024 - Carlyle International Energy Partners agreed to acquire Energean's stake | ||
Latest revision as of 15:32, 23 June 2024
Summary Information
- Operator: Energean
- Country: Egypt
- Location: Nile Delta
- Production start: 2023
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The North El Amirya and North Idku fields were developed together, as satellite fields to the Abu Qir gas-condensate offshore and onshore infrastructure.
- Multiple wells were completed and tied back to the North Abu Qir III platform.
- NEA contains two discovered and appraised gas fields (Yazzi and Python). NI – which is split into northern 21 and southern areas – contains four discovered gas fields, one of which is readied for development.
- Both areas contain additional mapped but undrilled prospects.
Contractors
- ENPPI: Engineering services for the platform structure and topside facilities
- KWSubsea:
- FEED of 10" x 7km infield and 16" x 33km export pipelines and tie-in spools including shore approach design
- Detailed analysis of lateral buckling and trawling response of exposed 16" gas export and 10" infield flowlines
History
- 1999 - North Idku Gas Field discovered
- 2008 - RWE announces field development
- 2019 - Energean acquired a stake in the field from Edison
- 2023 - First gas produced
- 2024 - Carlyle International Energy Partners agreed to acquire Energean's stake
Geology
Links
- ENPPI Offshore Platform References
- MOL achieves success in Egypt finding natural gas reserves
- RWE Dea starts offshore gas field development in North Idku
- Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.
- Strategic sale of Egypt, Italy and Croatia portfolio