* 2019 - MODEC awarded Front-End Engineering Design (FEED) for the FPSO
 
* 2019 - MODEC awarded Front-End Engineering Design (FEED) for the FPSO
 
* 2020 - MODEC awarded purchase contract
 
* 2020 - MODEC awarded purchase contract
 +
* 2024 - First oil produced
  
 
=== Other Information ===
 
=== Other Information ===
Line 36: Line 37:
 
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-contract-of-fpso-for-sne.html MODEC Awarded Contract of FPSO for SNE Field offshore Senegal]
 
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-contract-of-fpso-for-sne.html MODEC Awarded Contract of FPSO for SNE Field offshore Senegal]
 
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-fpso-purchase-contract.html MODEC Awarded FPSO Purchase Contract for Sangomar Field offshore Senegal]
 
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-fpso-purchase-contract.html MODEC Awarded FPSO Purchase Contract for Sangomar Field offshore Senegal]
 +
# [https://a-barrel-full.blogspot.com/2024/06/woodside-achieves-first-oil-at-sangomar.html Woodside Achieves First Oil at Sangomar In Senegal]
 +
 +
[[category:FPSO]]
 +
[[category:Senegal]]
 +
[[category:Woodside]]

Latest revision as of 10:54, 17 June 2024

Summary Information

  • Name: Léopold Sédar Senghor FPSO
  • Field: Sangomar Oil and Gas Field
  • Country: Senegal
  • Ownership:
  • Website:
  • Field Operated By: Woodside
  • Capacity: 100,000 bpd
  • Year of Completion:

Brief Description

  • The FPSO will be capable of processing 100,000 barrels of crude oil per day, 130 million standard cubic feet of gas per day, 145,000 barrels of water injection per day and will have minimum storage capacity of 1,300,000 barrels of crude oil.
  • The FPSO vessel will be permanently moored at a water depth of approximately 780 meters by an External Turret mooring system

Contractors

  • Modec:
    • Front End Engineering Design (FEED)
    • FPSO purchase contract
  • Sofec: External Turret mooring system

Status

  • In operation

History

  • 2019 - MODEC awarded Front-End Engineering Design (FEED) for the FPSO
  • 2020 - MODEC awarded purchase contract
  • 2024 - First oil produced

Other Information

  • -

Links

  1. MODEC Awarded Contract of FPSO for SNE Field offshore Senegal
  2. MODEC Awarded FPSO Purchase Contract for Sangomar Field offshore Senegal
  3. Woodside Achieves First Oil at Sangomar In Senegal