Abarrelfull (talk | contribs) (Created page with "References # Berantai FPSO #* Berantai Gas Field #* Malaysia #* Petrofac #* 2011 #* 15,000 bopd, 150mmscfd #* Gas Dehydration, Gas Compression, Riser Balcony / Turret...") |
Abarrelfull (talk | contribs) |
||
Line 28: | Line 28: | ||
# Unspecified 40,000 bopd 2009 | # Unspecified 40,000 bopd 2009 | ||
# [[Lewek EMAS FPSO]] | # [[Lewek EMAS FPSO]] | ||
− | #* [[Chim | + | #* [[Chim Sáo Oil Field]] |
#* Vietnam | #* Vietnam | ||
#* 2009 | #* 2009 |
Latest revision as of 10:03, 3 May 2024
References
- Berantai FPSO
- Berantai Gas Field
- Malaysia
- Petrofac
- 2011
- 15,000 bopd, 150mmscfd
- Gas Dehydration, Gas Compression, Riser Balcony / Turret, Flare Knock Out, Production Separation / PWT, Module Supply EPC, Module Yard Supervision, Module Detailed Design
- OSX 1 FPSO
- Waimea Oil Field
- Brazil
- Keppel
- 2010
- 40,000 bopd, 5 mmscfd
- Power Generation, Heating/Cooling Medium, Gas Compression, Production Separation / PWT, Module Yard Supervision, Detailed Design
- Cendor II FPSO
- Cendor Oil Field
- Petrofac
- 80,000 bopd
- Gas Compression, Flare Knock Out, Production Separation / PWT, FEED
- Armada D1 FPSO
- D1Field
- India
- ONGC
- 2010
- PMC
- Unspecified 40,000 bopd 2009
- Lewek EMAS FPSO
- Chim Sáo Oil Field
- Vietnam
- 2009
- 50,000 bopd & 45 mmscfd
- Power Generation, Heating/Cooling Medium, Water Injection, Flare Knock Out, Production Separation / PWT, Module Yard Supervision, Detailed Design, FEED
- Armada Perdana FPSO
- Oyo Oil Field
- Nigeria
- 2008
- 45,000 bopd & 60 mmscfd
- ESD / DCS System, Power Generation, Heating/Cooling Medium, Water Injection, Gas Dehydration, Gas Compression, Flare Knock Out, Production Separation / PWT, Detailed Design, FEED
- P 63 FPSO
- Papa Terra Oil Field
- Brazil
- 130,000 bopd & 25 mmscfd
- Flare Knock Out, Production Separation / PWT
- BW Pioneer FPSO
- Cascade Chinook Oil And Gas Field
- USA
- 2008
- 80,000 bopd & 16 mmscfd
- Flare Knock Out, Production Separation / PWT, Module Supply EPC, Module Yard Supervision, Detailed Design, FEED
- Ruby II FPSO
- Ruby Oil And Gas Field
- Vietnam
- 2008
- 39,000 bopd & 29 mmscfd
- ESD / DCS System, Power Generation, Heating/Cooling Medium, Gas Dehydration, Gas Compression, Riser Balcony / Turret, Flare Knock Out, Production Separation / PWT, Module Yard Supervision, Detailed Design, FEED
- East Fortune
- 2007
- 30,000 bopd & 35 mmscfd
- Generic
- 2005
- 25,000 bopd & 50 mmscfd
- Bunga Kertas FPSO
- 2004
- 30,000 bopd & 40 mmscfd
- ESD / DCS System, Power Generation, Heating/Cooling Medium, Gas Dehydration, Gas Compression, Flare Knock Out, Production Separation / PWT, Module Yard Supervision, Detailed Design, FEED