Difference between revisions of "Sanaga Gas and Condensate Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 10: | Line 10: | ||
=== Description === | === Description === | ||
| + | * The field uses the Sanaga 01 Mobile Offshore Production Unit (MOPU) | ||
* The second phase of the project involves the [[Cameroon Hilli FLNG Terminal]] | * The second phase of the project involves the [[Cameroon Hilli FLNG Terminal]] | ||
=== Contractors === | === Contractors === | ||
| − | * | + | * '''Overdick:''' Engineering, design and installation of the Sanaga 1 MOPU |
=== History === | === History === | ||
Revision as of 13:54, 1 December 2023
Summary Information
- Operator: Perenco
- Country: Cameroon
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The field uses the Sanaga 01 Mobile Offshore Production Unit (MOPU)
- The second phase of the project involves the Cameroon Hilli FLNG Terminal
Contractors
- Overdick: Engineering, design and installation of the Sanaga 1 MOPU