Difference between revisions of "Snam Adriatic Floating LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 39: | Line 39: | ||
# [https://lng-news.blogspot.com/2023/09/corinth-pipeworks-was-awarded-contract.html Corinth Pipeworks was awarded contract for the Floating Storage and Regasification Unit (FSRU) pipeline in Italy] | # [https://lng-news.blogspot.com/2023/09/corinth-pipeworks-was-awarded-contract.html Corinth Pipeworks was awarded contract for the Floating Storage and Regasification Unit (FSRU) pipeline in Italy] | ||
# [https://lng-news.blogspot.com/2023/11/snam-and-municipality-of-ravenna-join.html Snam and the Municipality of Ravenna join forces to present projects on the territory and their economic and employment implications] | # [https://lng-news.blogspot.com/2023/11/snam-and-municipality-of-ravenna-join.html Snam and the Municipality of Ravenna join forces to present projects on the territory and their economic and employment implications] | ||
+ | # [https://lng-news.blogspot.com/2023/12/snam-finalises-purchase-of-5-billion.html Snam finalises the purchase of the 5 billion cubic metres floating regasification unit (FRSU) to be located in Ravenna from BW LNG] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Italy]] | [[category:Italy]] | ||
[[category:Snam]] | [[category:Snam]] |
Revision as of 10:51, 5 December 2023
Contents
Summary Information
- Ownership: Snam
- Website: https://www.snam.it/
- Location: Ravenna, Northern Italy
- Capacity: 5 BCM/annum
- Status: Under construction
Brief Description
- BW Singapore, built in 2015, has a maximum storage capacity of about 170,000 cubic metres of LNG (liquefied natural gas) and a nominal continuous regasification capacity of about 5 billion cubic metres per year.
Technical Details
- Storage capacity: 170,000 cubic metres
- Unloading capacity:
- Send out capacity: 5BCM/annum
- Constructor:
- Corinth Pipeworks: manufacture and supply approximately 13 km of longitudinally submerged arc-welded steel pipes
Ongoing Projects/Project Status
- The vessel is contracted until the second half of 2023, after which it will be transferred to Snam
- The project is scheduled for completion in early 2024
Suppliers / Customers
- Suppliers:
- Customers: The terminal will supply the Italian grid
History
- 2022 - Snam acquired the vessel from BW LNG
- 2023 - Snam and Ravenna municipality agree to locate FSRU in Ravenna
Other Information
-
Links
- Snam Purchases New Floating Regasification Unit From BW LNG To Contribute To Italy's Energy Security And Diversification
- Corinth Pipeworks was awarded contract for the Floating Storage and Regasification Unit (FSRU) pipeline in Italy
- Snam and the Municipality of Ravenna join forces to present projects on the territory and their economic and employment implications
- Snam finalises the purchase of the 5 billion cubic metres floating regasification unit (FRSU) to be located in Ravenna from BW LNG