Difference between revisions of "Cluster 2 Oil and Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
Line 34: Line 34:
 
# [https://abarrelfull.blogspot.com/2023/11/honble-prime-minister-dedicates-ongc-u.html Hon’ble Prime Minister dedicates ONGC U-field Onshore facilities of KG-DWN-98/2 Deep Water Block to the Nation]
 
# [https://abarrelfull.blogspot.com/2023/11/honble-prime-minister-dedicates-ongc-u.html Hon’ble Prime Minister dedicates ONGC U-field Onshore facilities of KG-DWN-98/2 Deep Water Block to the Nation]
 
# [https://abarrelfull.blogspot.com/2023/11/bhge-mcdermott-l-hydrocarbon.html BHGE, McDermott, L&T Hydrocarbon Engineering Win Largest Indian Subsea Project for ONGC’s Prestigious 98/2 Block]
 
# [https://abarrelfull.blogspot.com/2023/11/bhge-mcdermott-l-hydrocarbon.html BHGE, McDermott, L&T Hydrocarbon Engineering Win Largest Indian Subsea Project for ONGC’s Prestigious 98/2 Block]
 +
# [https://a-barrel-full.blogspot.com/2024/01/ongc-announces-first-oil-from-deep.html ONGC announces “First Oil” from the deep-water KG-DWN-98/2 Block]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:India]]
 
[[category:India]]
 
[[category:ONGC]]
 
[[category:ONGC]]

Revision as of 17:57, 8 January 2024

Summary Information

  • Operator: ONGC
  • Country: India
  • Location: Krishna Godavari basin
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Located in the KG-DWN-98/2 Deep Water Block at a water depth of between 984 feet (300 meters) and 10,500 feet (3,200 meters)
  • The development includes a Central processing Platform, the Armada Sterling V FPSO and 34 deepwater trees
  • Gas is processed at an onshore plant

Contractors

  • Baker Hughes:
    • Subsea hardware including trees, manifolds, controls, connection systems, SPS installation tools and services, as well as flexible risers and flowlines, umbilical and topside controls
  • McDermott:
    • Transportation and installation of a central processing platform (CPP) and living quarters
    • Transportation and installation of SURF and SPS facilities

Sembcorp Marine: Hull repairs and upgrading as well as fabrication of topside modules for the FPSO

History

  • 2018 - Contracts awarded for the development
  • 2022 - The U field came onstream
  • 2023 - Installation contract awarded

Geology

Links

  1. McDermott Awarded Transportation and Installation Contract by ONGC
  2. Hon’ble Prime Minister dedicates ONGC U-field Onshore facilities of KG-DWN-98/2 Deep Water Block to the Nation
  3. BHGE, McDermott, L&T Hydrocarbon Engineering Win Largest Indian Subsea Project for ONGC’s Prestigious 98/2 Block
  4. ONGC announces “First Oil” from the deep-water KG-DWN-98/2 Block