Difference between revisions of "Ca Rong Do Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Talisman * Country: Vietnam * Location: Block 07/03 * Production start: * Partners: * Type: Oil & Gas * Estimated Reserves: 67 million barr...") |
Abarrelfull (talk | contribs) |
||
Line 14: | Line 14: | ||
+++ Contractors | +++ Contractors | ||
* **Wood Group Kenny (WGK):** | * **Wood Group Kenny (WGK):** | ||
− | + | ** Top tensioned riser (TTR) FEED contract for design of the dry tree production/injection and drilling riser systems | |
− | + | ** Comprehensive flow assurance studies and full FEED engineering of the subsea system and structures, risers, flowlines, and power and control umbilicals | |
+++ History | +++ History |
Latest revision as of 12:10, 30 October 2023
Summary Information
- Operator: Talisman
- Country: Vietnam
- Location: Block 07/03
- Production start:
- Partners:
- Type: Oil & Gas
- Estimated Reserves: 67 million barrels of oil equivalent
- Production Volume:
+++ Description
+++ Contractors
- **Wood Group Kenny (WGK):**
- Top tensioned riser (TTR) FEED contract for design of the dry tree production/injection and drilling riser systems
- Comprehensive flow assurance studies and full FEED engineering of the subsea system and structures, risers, flowlines, and power and control umbilicals
+++ History
- 2009 - Ca Rong Do Oil And Gas Field discovered
- 2013 - Talisman acquired the block from Premier
- 2015 - Repsol acquired Talisman and became a partner
+++ Geology
+++ Links