Difference between revisions of "North Malay Basin Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * Bergading, Bunga Dahlia, Teratai, Gajah, Melati, Kamelia, Zetung, Anggerik and Kesumba | + | * The initial development concept for NMB targeted nine stranded gas fields – Bergading, Bunga Dahlia, Teratai, Gajah, Melati, Kamelia, Zetung, Anggerik and Kesumba through the deployment of a floating production storage and offloading (FPSO) vessel. Later in 2018, a tenth field was identified, Bunga Kangsar. |
+ | * A 300-kilometers offshore pipeline connects production to the [[Terengganu Gas Terminal (TGAST)]] plant | ||
+ | * The early production system (EPS) included just the Kamelia field and used a wellhead platform and the leased floating production, storage and offloading vessel [[Perisai Kamelia FPSO]] | ||
+ | * Phase 1 of the Field Development Plan (FDP) included the Bergading central processing platform (CPP) that bridge-linked to Bergading A wellhead platform, and three additional wellhead platforms – the Bergading C, Bergading D and Kesumba platforms. | ||
+ | * Phase 2 of the Field Development Plan (FDP) developed the Zetung and Anggerik fields with nine production wells and the construction, transport and installation of two three-legged remote wellhead platforms, as well as the pipelines that serves them, with gas flowing to the CPP. | ||
* The NMB Phase 3 project includes the installation of the new Bergading-B Wellhead Platform that adds another 100 million cubic feet per day (MMscfd) of gas supply from Block PM302, bringing the total production to 400 MMscfd. | * The NMB Phase 3 project includes the installation of the new Bergading-B Wellhead Platform that adds another 100 million cubic feet per day (MMscfd) of gas supply from Block PM302, bringing the total production to 400 MMscfd. | ||
Line 18: | Line 22: | ||
=== History === | === History === | ||
* 2012 - Hess and Petronas sign agreement to develop the basin | * 2012 - Hess and Petronas sign agreement to develop the basin | ||
+ | * 2013 - First gas from the early production system (EPS) | ||
+ | * 2017 - First gas from phase 1 and TGAST completed | ||
+ | * 2019 - First gas from phase 2 | ||
* 2019 - FID for Phase 3 | * 2019 - FID for Phase 3 | ||
* 2022 - First oil from phase 3 development | * 2022 - First oil from phase 3 development |
Revision as of 05:59, 24 October 2023
Summary Information
- Operator: Hess
- Country: Malaysia
- Location: PM302, PM325 and PM326B
- Production start:
- Partners: Petronas / Hess
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The initial development concept for NMB targeted nine stranded gas fields – Bergading, Bunga Dahlia, Teratai, Gajah, Melati, Kamelia, Zetung, Anggerik and Kesumba through the deployment of a floating production storage and offloading (FPSO) vessel. Later in 2018, a tenth field was identified, Bunga Kangsar.
- A 300-kilometers offshore pipeline connects production to the Terengganu Gas Terminal (TGAST) plant
- The early production system (EPS) included just the Kamelia field and used a wellhead platform and the leased floating production, storage and offloading vessel Perisai Kamelia FPSO
- Phase 1 of the Field Development Plan (FDP) included the Bergading central processing platform (CPP) that bridge-linked to Bergading A wellhead platform, and three additional wellhead platforms – the Bergading C, Bergading D and Kesumba platforms.
- Phase 2 of the Field Development Plan (FDP) developed the Zetung and Anggerik fields with nine production wells and the construction, transport and installation of two three-legged remote wellhead platforms, as well as the pipelines that serves them, with gas flowing to the CPP.
- The NMB Phase 3 project includes the installation of the new Bergading-B Wellhead Platform that adds another 100 million cubic feet per day (MMscfd) of gas supply from Block PM302, bringing the total production to 400 MMscfd.
Contractors
- -
History
- 2012 - Hess and Petronas sign agreement to develop the basin
- 2013 - First gas from the early production system (EPS)
- 2017 - First gas from phase 1 and TGAST completed
- 2019 - First gas from phase 2
- 2019 - FID for Phase 3
- 2022 - First oil from phase 3 development
- 2023 - Chevron agreed to acquire Hess, becoming a partner