=== Description ===
 
=== Description ===
 
* Bergading, Bunga Dahlia, Teratai, Gajah, Melati, Kamelia, Zetung, Anggerik and Kesumba
 
* Bergading, Bunga Dahlia, Teratai, Gajah, Melati, Kamelia, Zetung, Anggerik and Kesumba
 +
* The NMB Phase 3 project includes the installation of the new Bergading-B Wellhead Platform that adds another 100 million cubic feet per day (MMscfd) of gas supply from Block PM302, bringing the total production to 400 MMscfd.
  
 
=== Contractors ===
 
=== Contractors ===
Line 17: Line 18:
 
=== History ===
 
=== History ===
 
* 2012 - Hess and Petronas sign agreement to develop the basin
 
* 2012 - Hess and Petronas sign agreement to develop the basin
 +
* 2019 - FID for Phase 3
 +
* 2022 - First oil from phase 3 development
 +
* 2023 - Chevron agreed to acquire Hess, becoming a partner
  
 
=== Geology ===
 
=== Geology ===
Line 23: Line 27:
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2023/10/hess-and-petronas-sign-partnership.html Hess and PETRONAS Sign Partnership Agreements to Develop North Malay Basin]
 
# [https://abarrelfull.blogspot.com/2023/10/hess-and-petronas-sign-partnership.html Hess and PETRONAS Sign Partnership Agreements to Develop North Malay Basin]
 
+
# [https://abarrelfull.blogspot.com/2023/10/north-malay-basin-phase-3-block-pm302.html North Malay Basin Phase 3 Block PM302 Achieves First Gas Production]
 +
# [https://a-barrel-full.blogspot.com/2023/10/chevron-announces-agreement-to-acquire.html Chevron announces agreement to acquire Hess]
  
 
[[category:Field]]
 
[[category:Field]]

Revision as of 16:39, 23 October 2023

Summary Information

  • Operator: Hess
  • Country: Malaysia
  • Location: PM302, PM325 and PM326B
  • Production start:
  • Partners: Petronas / Hess
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Bergading, Bunga Dahlia, Teratai, Gajah, Melati, Kamelia, Zetung, Anggerik and Kesumba
  • The NMB Phase 3 project includes the installation of the new Bergading-B Wellhead Platform that adds another 100 million cubic feet per day (MMscfd) of gas supply from Block PM302, bringing the total production to 400 MMscfd.

Contractors

  • -

History

  • 2012 - Hess and Petronas sign agreement to develop the basin
  • 2019 - FID for Phase 3
  • 2022 - First oil from phase 3 development
  • 2023 - Chevron agreed to acquire Hess, becoming a partner

Geology

Links

  1. Hess and PETRONAS Sign Partnership Agreements to Develop North Malay Basin
  2. North Malay Basin Phase 3 Block PM302 Achieves First Gas Production
  3. Chevron announces agreement to acquire Hess