Difference between revisions of "Gulf Run Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: Operating === Details === *...") |
Abarrelfull (talk | contribs) |
||
Line 17: | Line 17: | ||
=== History === | === History === | ||
− | * - | + | * 2022 - The pipeline enters commercial service |
=== Other Information === | === Other Information === | ||
Line 23: | Line 23: | ||
=== Links === | === Links === | ||
− | # [] | + | # [[EIA Natural Gas Pipeline Projects 2015-2022]] |
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:Country]] | [[category:Country]] | ||
[[category:Company]] | [[category:Company]] |
Revision as of 08:51, 27 September 2023
Summary Information
- Source:
- Destination:
- Ownership:
- Website:
- Length: kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- Gulf Run receives natural gas from Energy Transfer’s extensive intrastate and interstate pipeline network, including production directly from the Haynesville Shale.
- Volumes originating from all the major natural gas basins in the U.S. have access to the pipeline, including the Permian Basin, the Barnett Shale, the Marcellus and Utica shales, East Texas, the Arkoma and the Anadarko basins.
- The pipeline consists of two zones.
- Zone 1 connects the Carthage Hub to the Perryville markets. It has bi-directional flow capabilities, providing the ability to deliver significant volumes to Perryville as well as to the Golden Pass and Trunkline Gas Company Pipeline.
- Zone 2 extends south and connects to Golden Pass Pipeline and to Energy Transfer’s Trunkline system. The Zone 1 segment
History
- 2022 - The pipeline enters commercial service
Other Information
- -