Difference between revisions of "NEXUS Gas Transmission (NGT) Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Ohio * Destination: Michigan * Ownership: DTE Energy, Enbridge and Spectra Energy * Websites: * http://www.dteenergy.com/ * http://www.enbr...") |
Abarrelfull (talk | contribs) |
||
Line 5: | Line 5: | ||
* Ownership: DTE Energy, Enbridge and Spectra Energy | * Ownership: DTE Energy, Enbridge and Spectra Energy | ||
* Websites: | * Websites: | ||
− | + | ** http://www.dteenergy.com/ | |
− | + | ** http://www.enbridge.com/ | |
− | + | ** http://www.spectraenergy.com/ | |
* Length: kilometres (250 miles) | * Length: kilometres (250 miles) | ||
* Capacity: one billion cubic feet per day | * Capacity: one billion cubic feet per day |
Revision as of 17:59, 18 September 2023
Summary Information
- Source: Ohio
- Destination: Michigan
- Ownership: DTE Energy, Enbridge and Spectra Energy
- Websites:
- Length: kilometres (250 miles)
- Capacity: one billion cubic feet per day
- Status: Planned
+++ Details
- The proposed NGT project will originate in northeastern Ohio, include approximately 250 miles of large diameter pipe, and be capable of transporting one billion cubic feet per day of natural gas. The line will follow existing utility corridors to an interconnect in Michigan and utilize the existing Vector Gas Pipeline system to reach the Ontario market
- It will include interconnects with Michigan Consolidated Gas Company, Consumers Energy and, through the Vector Pipeline, the Enbridge Tecumseh Gas Storage facility and Union Gas’ Dawn Natural Gas Hub, both in Ontario.
- Will carry gas from the Utica Shale Oil and Gas Field
+++ Contractors
- **Fluor:** Engineering, procurement and construction management services
+++ History
- 2012 - Pipeline project announced
- 2015 - Fluor awarded construction contract
- 2015 - Provincial Approval to Transport Natural Gas from Ohio to Ontario
+++ Other Information
- -
+++ Links