Difference between revisions of "Mississippi Canyon Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Source: West Delta 143 Platform
 
* Source: West Delta 143 Platform
Line 9: Line 9:
 
* Status: Operating
 
* Status: Operating
  
+++ Details
+
=== Details ===
 
* Transports production gathered from the [[Mars Oil and Gas Field]], [[Mensa Offshore Gas Field]] and [[Ursa Oil and Gas Field]] in the Mississippi Canyon Area of the Gulf of Mexico Outer Continental Shelf and delivered to Mississippi Canyon Gas Pipeline at West Delta 143 Platform.  
 
* Transports production gathered from the [[Mars Oil and Gas Field]], [[Mensa Offshore Gas Field]] and [[Ursa Oil and Gas Field]] in the Mississippi Canyon Area of the Gulf of Mexico Outer Continental Shelf and delivered to Mississippi Canyon Gas Pipeline at West Delta 143 Platform.  
 
* Extends from West Delta Block 143 to interconnects with the Venice Gas Plant and 2 interstate pipelines onshore.
 
* Extends from West Delta Block 143 to interconnects with the Venice Gas Plant and 2 interstate pipelines onshore.
  
+++ History
+
=== History ===
 
* 1996 - Pipeline completed  
 
* 1996 - Pipeline completed  
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ Links
+
=== Links ===
 
# [[EIA Natural Gas Pipeline Projects]]
 
# [[EIA Natural Gas Pipeline Projects]]
 +
# [[Fiberbond North America Offshore Platform References]]

Latest revision as of 09:13, 16 July 2024

Summary Information

  • Source: West Delta 143 Platform
  • Destination:
  • Ownership: Enbridge
  • Website: http://www.enbridge.com/
  • Length: kilometres (43 miles)
  • Capacity: 800 (MMcf/d)
  • Status: Operating

Details

  • Transports production gathered from the Mars Oil and Gas Field, Mensa Offshore Gas Field and Ursa Oil and Gas Field in the Mississippi Canyon Area of the Gulf of Mexico Outer Continental Shelf and delivered to Mississippi Canyon Gas Pipeline at West Delta 143 Platform.
  • Extends from West Delta Block 143 to interconnects with the Venice Gas Plant and 2 interstate pipelines onshore.

History

  • 1996 - Pipeline completed

Other Information

  • -

Links

  1. EIA Natural Gas Pipeline Projects
  2. Fiberbond North America Offshore Platform References