Difference between revisions of "Red Hawk Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Anadarko * Country: USA * Location: Garden Banks Block 876 * Production start: 2004 * Partners: * Type: Gas * Estimated Reserves: * Product...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Anadarko  
 
* Operator: Anadarko  
 
* Country: USA  
 
* Country: USA  
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* This cell spar measures 64 feet in diameter and 480 feet in length. It is composed of seven tubes, each 20 feet in diameter, with a center tube surrounded by the other six tubes, all connected by structural steel.  
 
* This cell spar measures 64 feet in diameter and 480 feet in length. It is composed of seven tubes, each 20 feet in diameter, with a center tube surrounded by the other six tubes, all connected by structural steel.  
 
* The deck is 110 feet by 132 feet. The synthetic mooring consists of high strength polyester fiber which provides a level of protection equivalent to or greater than that of steel wire rope systems, while reducing the vertical loads on the spar hull in deepwater projects.
 
* The deck is 110 feet by 132 feet. The synthetic mooring consists of high strength polyester fiber which provides a level of protection equivalent to or greater than that of steel wire rope systems, while reducing the vertical loads on the spar hull in deepwater projects.
  
+++ Contractors
+
=== Contractors ===
 
* **Gulf Island Fabrication:** Red Hawk Cell Spar Construction
 
* **Gulf Island Fabrication:** Red Hawk Cell Spar Construction
 
* **Heerema Marine Contractors:** Red Hawk Spar installation
 
* **Heerema Marine Contractors:** Red Hawk Spar installation
  
  
+++ History
+
=== History ===
 
* 2001 - Red Hawk Gas Field discovered
 
* 2001 - Red Hawk Gas Field discovered
 
* 2003 - The Minerals Management Service approved the use of the world’s first cell spar
 
* 2003 - The Minerals Management Service approved the use of the world’s first cell spar
 
* 2004 - Production starts
 
* 2004 - Production starts
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[Gulf Of Mexico Permanent Deepwater Structures]]
 
# [[Gulf Of Mexico Permanent Deepwater Structures]]
 
# [[Gulf Island Fabrication Platform References]]
 
# [[Gulf Island Fabrication Platform References]]
 +
# [[Fiberbond North America Offshore Platform References]]
 
# [[FoundOcean North And South America Subsea References]]
 
# [[FoundOcean North And South America Subsea References]]
 
# [http://killajoules.wikidot.com/archive:mms-announces-first-approval-for-use-of-cell-spar-as MMS Announces First Approval For Use of Cell Spar as New Technology]
 
# [http://killajoules.wikidot.com/archive:mms-announces-first-approval-for-use-of-cell-spar-as MMS Announces First Approval For Use of Cell Spar as New Technology]
 
# [http://killajoules.wikidot.com/archive:gulfterra-commences-operations-of-phoenix-gas-pipeli GulfTerra Commences Operations Of Phoenix Gas Pipeline In The Deepwater Gulf Of Mexico]
 
# [http://killajoules.wikidot.com/archive:gulfterra-commences-operations-of-phoenix-gas-pipeli GulfTerra Commences Operations Of Phoenix Gas Pipeline In The Deepwater Gulf Of Mexico]

Revision as of 07:17, 18 July 2024

Summary Information

  • Operator: Anadarko
  • Country: USA
  • Location: Garden Banks Block 876
  • Production start: 2004
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • This cell spar measures 64 feet in diameter and 480 feet in length. It is composed of seven tubes, each 20 feet in diameter, with a center tube surrounded by the other six tubes, all connected by structural steel.
  • The deck is 110 feet by 132 feet. The synthetic mooring consists of high strength polyester fiber which provides a level of protection equivalent to or greater than that of steel wire rope systems, while reducing the vertical loads on the spar hull in deepwater projects.

Contractors

  • **Gulf Island Fabrication:** Red Hawk Cell Spar Construction
  • **Heerema Marine Contractors:** Red Hawk Spar installation


History

  • 2001 - Red Hawk Gas Field discovered
  • 2003 - The Minerals Management Service approved the use of the world’s first cell spar
  • 2004 - Production starts

Geology

Links

  1. Gulf Of Mexico Permanent Deepwater Structures
  2. Gulf Island Fabrication Platform References
  3. Fiberbond North America Offshore Platform References
  4. FoundOcean North And South America Subsea References
  5. MMS Announces First Approval For Use of Cell Spar as New Technology
  6. GulfTerra Commences Operations Of Phoenix Gas Pipeline In The Deepwater Gulf Of Mexico