Difference between revisions of "Red Hawk Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Anadarko * Country: USA * Location: Garden Banks Block 876 * Production start: 2004 * Partners: * Type: Gas * Estimated Reserves: * Product...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Anadarko | * Operator: Anadarko | ||
* Country: USA | * Country: USA | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* This cell spar measures 64 feet in diameter and 480 feet in length. It is composed of seven tubes, each 20 feet in diameter, with a center tube surrounded by the other six tubes, all connected by structural steel. | * This cell spar measures 64 feet in diameter and 480 feet in length. It is composed of seven tubes, each 20 feet in diameter, with a center tube surrounded by the other six tubes, all connected by structural steel. | ||
* The deck is 110 feet by 132 feet. The synthetic mooring consists of high strength polyester fiber which provides a level of protection equivalent to or greater than that of steel wire rope systems, while reducing the vertical loads on the spar hull in deepwater projects. | * The deck is 110 feet by 132 feet. The synthetic mooring consists of high strength polyester fiber which provides a level of protection equivalent to or greater than that of steel wire rope systems, while reducing the vertical loads on the spar hull in deepwater projects. | ||
− | + | === Contractors === | |
* **Gulf Island Fabrication:** Red Hawk Cell Spar Construction | * **Gulf Island Fabrication:** Red Hawk Cell Spar Construction | ||
* **Heerema Marine Contractors:** Red Hawk Spar installation | * **Heerema Marine Contractors:** Red Hawk Spar installation | ||
− | + | === History === | |
* 2001 - Red Hawk Gas Field discovered | * 2001 - Red Hawk Gas Field discovered | ||
* 2003 - The Minerals Management Service approved the use of the world’s first cell spar | * 2003 - The Minerals Management Service approved the use of the world’s first cell spar | ||
* 2004 - Production starts | * 2004 - Production starts | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Gulf Of Mexico Permanent Deepwater Structures]] | # [[Gulf Of Mexico Permanent Deepwater Structures]] | ||
# [[Gulf Island Fabrication Platform References]] | # [[Gulf Island Fabrication Platform References]] | ||
+ | # [[Fiberbond North America Offshore Platform References]] | ||
# [[FoundOcean North And South America Subsea References]] | # [[FoundOcean North And South America Subsea References]] | ||
# [http://killajoules.wikidot.com/archive:mms-announces-first-approval-for-use-of-cell-spar-as MMS Announces First Approval For Use of Cell Spar as New Technology] | # [http://killajoules.wikidot.com/archive:mms-announces-first-approval-for-use-of-cell-spar-as MMS Announces First Approval For Use of Cell Spar as New Technology] | ||
# [http://killajoules.wikidot.com/archive:gulfterra-commences-operations-of-phoenix-gas-pipeli GulfTerra Commences Operations Of Phoenix Gas Pipeline In The Deepwater Gulf Of Mexico] | # [http://killajoules.wikidot.com/archive:gulfterra-commences-operations-of-phoenix-gas-pipeli GulfTerra Commences Operations Of Phoenix Gas Pipeline In The Deepwater Gulf Of Mexico] |
Revision as of 07:17, 18 July 2024
Summary Information
- Operator: Anadarko
- Country: USA
- Location: Garden Banks Block 876
- Production start: 2004
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- This cell spar measures 64 feet in diameter and 480 feet in length. It is composed of seven tubes, each 20 feet in diameter, with a center tube surrounded by the other six tubes, all connected by structural steel.
- The deck is 110 feet by 132 feet. The synthetic mooring consists of high strength polyester fiber which provides a level of protection equivalent to or greater than that of steel wire rope systems, while reducing the vertical loads on the spar hull in deepwater projects.
Contractors
- **Gulf Island Fabrication:** Red Hawk Cell Spar Construction
- **Heerema Marine Contractors:** Red Hawk Spar installation
History
- 2001 - Red Hawk Gas Field discovered
- 2003 - The Minerals Management Service approved the use of the world’s first cell spar
- 2004 - Production starts
Geology
Links
- Gulf Of Mexico Permanent Deepwater Structures
- Gulf Island Fabrication Platform References
- Fiberbond North America Offshore Platform References
- FoundOcean North And South America Subsea References
- MMS Announces First Approval For Use of Cell Spar as New Technology
- GulfTerra Commences Operations Of Phoenix Gas Pipeline In The Deepwater Gulf Of Mexico