Difference between revisions of "Goosander Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Centrica * Country: UK * Location: North Sea * Production start: 2006 * Partners: * Type: Oil * Estimated Reserves: * Production Volume: +...") |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
+++ Description | +++ Description | ||
− | * The Goosander development project, comprises a single production well which is tied back to the | + | * The Goosander development project, comprises a single production well which is tied back to the [[Kittiwake Oil Field | Kittiwake platform]] through a subsea bundle. Production will be supported by gas injection and water injection. |
* The field is located approximately 11 km north-west of the Kittiwake installation. | * The field is located approximately 11 km north-west of the Kittiwake installation. | ||
Latest revision as of 16:49, 2 September 2023
Summary Information
- Operator: Centrica
- Country: UK
- Location: North Sea
- Production start: 2006
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- The Goosander development project, comprises a single production well which is tied back to the Kittiwake platform through a subsea bundle. Production will be supported by gas injection and water injection.
- The field is located approximately 11 km north-west of the Kittiwake installation.
+++ Contractors
- **Petrofac:** Front End Engineering Design (FEED)
- **Subsea 7:** EPIC (engineering, procurement, installation and construction) of a 30" carrier pipe with an 8" flowline, 6" water injection line and a 4" gas lift line
+++ History
- 2005 - Subsea awarded EPIC contract
- 2006 - Project development approved by UK Government
- 2006 - Petrofac awarded FEED
- 2006 - Goosander Oil Field begins production
- 2009 - Centrica acquired Venture Production
- 2013 - EnQuest acquires 50% of the Greater Kittiwake Area
+++ Geology
+++ Links