Difference between revisions of "Kodiak Oil Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| Line 1: | Line 1: | ||
| === Summary Information === | === Summary Information === | ||
| − | * Operator:   | + | * Operator: Kosmos | 
| − | * Country:   | + | * Country: USA | 
| − | * Location:   | + | * Location: Mississippi Canyon Blocks 727 and 771, in the Gulf of Mexico | 
| * Production start:   | * Production start:   | ||
| * Partners:   | * Partners:   | ||
| Line 10: | Line 10: | ||
| === Description === | === Description === | ||
| − | *   | + | * The project consists of a subsea tie-back to the [[Devils Tower Oil and Gas Field | Devils Tower Truss Spar]] located in Mississippi Canyon Block 773 | 
| + | * The Kodiak field is high temperature and pressure | ||
| === Contractors === | === Contractors === | ||
| − | * - | + | * Technip:  | 
| + | ** fabrication(2) and installation of more than 12 kilometers of reeled bi-metallic flowline and riser, | ||
| + | ** installation of an 11-kilometer umbilical, associated terminations and flying leads, | ||
| + | ** pre-commissioning and testing for the rigid line, | ||
| + | ** crossings preparation along with pre-lay and post-lay survey. | ||
| === History === | === History === | ||
| Line 26: | Line 31: | ||
| [[category:Field]] | [[category:Field]] | ||
| − | [[category: | + | [[category:USA]] | 
| − | [[category: | + | [[category:Kosmos]] | 
Revision as of 11:01, 17 July 2023
Summary Information
- Operator: Kosmos
- Country: USA
- Location: Mississippi Canyon Blocks 727 and 771, in the Gulf of Mexico
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The project consists of a subsea tie-back to the Devils Tower Truss Spar located in Mississippi Canyon Block 773
- The Kodiak field is high temperature and pressure
Contractors
- Technip:
- fabrication(2) and installation of more than 12 kilometers of reeled bi-metallic flowline and riser,
- installation of an 11-kilometer umbilical, associated terminations and flying leads,
- pre-commissioning and testing for the rigid line,
- crossings preparation along with pre-lay and post-lay survey.
 
History
- 2014 - Technip awarded subsea contract