Difference between revisions of "Neptun Deep Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 18: | Line 18: | ||
=== History === | === History === | ||
+ | * 2022 - Romgaz acquired Exxon's stake in the project | ||
* 2023 - Final investment decision | * 2023 - Final investment decision | ||
Line 24: | Line 25: | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2023/06/romgaz-successfully-completed.html Romgaz successfully completed the transaction with ExxonMobil] | ||
# [https://a-barrel-full.blogspot.com/2023/06/omv-petrom-and-romgaz-announce-decision.html OMV Petrom and Romgaz announce the decision to develop Neptun Deep, the largest natural gas project in the Romanian Black Sea] | # [https://a-barrel-full.blogspot.com/2023/06/omv-petrom-and-romgaz-announce-decision.html OMV Petrom and Romgaz announce the decision to develop Neptun Deep, the largest natural gas project in the Romanian Black Sea] | ||
Revision as of 12:27, 22 June 2023
Summary Information
- Operator: OMV Petrom
- Country: Romania
- Location: Offshore Black Sea
- Production start: 2027 (Scheduled)
- Partners: OMV Petrom 50%, Romgaz 50%
- Type: Gas
- Estimated Reserves:
- Production Volume: Plateau 8 BCM per annuam (expected)
Description
- The project involves the development of two natural gas fields, Domino and Pelican
- The infrastructure required for the development of the Domino and Pelican South offshore natural gas fields includes 10 wells, 3 subsea production systems and associated flow lines, an unmanned offshore platform, the main natural gas pipeline to Tuzla and a natural gas measurement station.
- The gas processing facilities are located onshore.
Contractors
- -
History
- 2022 - Romgaz acquired Exxon's stake in the project
- 2023 - Final investment decision