Difference between revisions of "Marine XII Floating LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 30: Line 30:
 
* 2022 - ENI orders a second vessel
 
* 2022 - ENI orders a second vessel
 
* 2023 - ENI officially launches the project
 
* 2023 - ENI officially launches the project
 +
* 2023 - The FLNG vessel was completed
  
 
=== Other Information ===
 
=== Other Information ===
Line 38: Line 39:
 
# [https://lng-news.blogspot.com/2022/12/eni-launches-second-flng-project-to.html Eni launches a second FLNG project to increase LNG production and export from the Republic of Congo]
 
# [https://lng-news.blogspot.com/2022/12/eni-launches-second-flng-project-to.html Eni launches a second FLNG project to increase LNG production and export from the Republic of Congo]
 
# [https://lng-news.blogspot.com/2023/04/eni-inaugurates-congo-lng-project-in.html Eni inaugurates Congo LNG project in the Republic of the Congo]
 
# [https://lng-news.blogspot.com/2023/04/eni-inaugurates-congo-lng-project-in.html Eni inaugurates Congo LNG project in the Republic of the Congo]
 +
# [https://lng-news.blogspot.com/2023/10/eni-celebrates-sail-away-of-tango-flng.html Eni celebrates sail away of the Tango FLNG and Excalibur FSU vessels to Congo}
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Congo]]
 
[[category:Congo]]
 
[[category:ENI]]
 
[[category:ENI]]

Revision as of 12:59, 22 October 2023

Summary Information

  • Ownership: ENI
  • Website: https://www.eni.com/
  • Location: Congo
  • Capacity: 3.0 million tons/annum
  • Status: Under Construction

Brief Description

  • The development will be made in a modular manner, using multiple floating facilities
  • The source of the gas is the Marine XII Oil and Gas Fields
  • The first stage will involve Tango FLNG, built in 2017, which has a treatment capacity of approximately 3 million standard cubic meters/day and an LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic meters/year)
  • A second vessel will add 2.4 MTPA (million tons per annum). This is expected to enter operation in 2025
  • When fully operational the two vessels will provide volumes in excess of 3 million tons/year (over 4.5 billion cubic meters/year)

Technical Details

  • Storage capacity:
  • Constructor: Wison Heavy Industry for the construction and installation of a Floating Liquefied Natural Gas (FLNG) unit
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2023

Suppliers / Customers

History

  • 2022 - ENI acquires Tango FLNG
  • 2022 - ENI orders a second vessel
  • 2023 - ENI officially launches the project
  • 2023 - The FLNG vessel was completed

Other Information

  • -

Links

  1. Eni acquires the Tango FLNG to produce and export LNG from the Republic of Congo
  2. Eni launches a second FLNG project to increase LNG production and export from the Republic of Congo
  3. Eni inaugurates Congo LNG project in the Republic of the Congo
  4. [https://lng-news.blogspot.com/2023/10/eni-celebrates-sail-away-of-tango-flng.html Eni celebrates sail away of the Tango FLNG and Excalibur FSU vessels to Congo}