Difference between revisions of "Baleine Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: ENI * Country: Ivory Coast * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...")
 
Line 2: Line 2:
 
* Operator: ENI
 
* Operator: ENI
 
* Country: Ivory Coast
 
* Country: Ivory Coast
* Location:  
+
* Location: blocks CI-101 and CI-802, offshore
* Production start:  
+
* Production start: Scheduled for 2024
* Partners:  
+
* Partners: PetroCi Holding
* Type: Oil / Gas
+
* Type: Oil & Gas
* Estimated Reserves:  
+
* Estimated Reserves: estimated oil in place of 2.5 billion barrels and 3.3 trillion cubic feet of associated gas
 
* Production Volume:  
 
* Production Volume:  
  
 
=== Description ===
 
=== Description ===
*  
+
* The Baleine field extends over blocks CI-101 and CI-802.
 +
* The FPSO Firenze, that will be renamed Baleine after its arrival in Cote d’Ivoire, has been refurbished and upgraded in order to allow it to treat up to 15,000 bbl/d of oil and around 25 Mcfd/d of associated gas.
 +
* The entire gas production will be delivered onshore via a newly built export pipeline.
  
 
=== Contractors ===
 
=== Contractors ===
Line 16: Line 18:
  
 
=== History ===
 
=== History ===
*  
+
* 2022 - Final investment decision taken
 +
* 2023 - The FPSO sets sail for the Baleine Oil and Gas Field
  
 
=== Geology ===
 
=== Geology ===
Line 22: Line 25:
  
 
=== Links ===
 
=== Links ===
#
+
# [https://a-barrel-full.blogspot.com/2023/04/eni-celebrates-sail-away-of-fpso.html Eni Celebrates Sail Away of FPSO Firenze to Baleine Field Offshore Côte d'Ivoire]
  
  

Revision as of 16:05, 10 April 2023

Summary Information

  • Operator: ENI
  • Country: Ivory Coast
  • Location: blocks CI-101 and CI-802, offshore
  • Production start: Scheduled for 2024
  • Partners: PetroCi Holding
  • Type: Oil & Gas
  • Estimated Reserves: estimated oil in place of 2.5 billion barrels and 3.3 trillion cubic feet of associated gas
  • Production Volume:

Description

  • The Baleine field extends over blocks CI-101 and CI-802.
  • The FPSO Firenze, that will be renamed Baleine after its arrival in Cote d’Ivoire, has been refurbished and upgraded in order to allow it to treat up to 15,000 bbl/d of oil and around 25 Mcfd/d of associated gas.
  • The entire gas production will be delivered onshore via a newly built export pipeline.

Contractors

  • -

History

  • 2022 - Final investment decision taken
  • 2023 - The FPSO sets sail for the Baleine Oil and Gas Field

Geology

Links

  1. Eni Celebrates Sail Away of FPSO Firenze to Baleine Field Offshore Côte d'Ivoire