* Location: Levantine basin | * Location: Levantine basin | ||
* Production start: | * Production start: | ||
| − | * Partners: | + | * Partners: Chevron Mediterranean Limited as operator (39.66%), NewMed Energy (45.34%), and Ratio Energies (15%). |
* Type: Gas | * Type: Gas | ||
* Estimated Reserves: recoverable gross mean resources of 18 trillion cubic feet | * Estimated Reserves: recoverable gross mean resources of 18 trillion cubic feet | ||
| Line 12: | Line 12: | ||
* The Leviathan Field is located in the Israeli EEZ, approximately 130 km off the shores of Haifa. Production is facilitated by 4 subsea wells that are connected, via a subsea manifold and two 120 km long pipelines, to an offshore platform, where all processing of gas takes place. From the platform the gas is piped to shore into the Israeli national grid. | * The Leviathan Field is located in the Israeli EEZ, approximately 130 km off the shores of Haifa. Production is facilitated by 4 subsea wells that are connected, via a subsea manifold and two 120 km long pipelines, to an offshore platform, where all processing of gas takes place. From the platform the gas is piped to shore into the Israeli national grid. | ||
* Gas is supplied to Jordan and Egypt as well as Israel | * Gas is supplied to Jordan and Egypt as well as Israel | ||
| + | * An expansion project is under way that includes drilling three additional offshore wells, adding additional subsea infrastructure, and enhancing the treatment facilities on the Leviathan production platform. This will increase capacity to deliver approximately 21 billion cubic meters (BCM) annually | ||
| + | |||
=== Contractors === | === Contractors === | ||
| Line 24: | Line 26: | ||
* 2019 - First gas produced | * 2019 - First gas produced | ||
* 2020 - Chevron acquires Noble Energy | * 2020 - Chevron acquires Noble Energy | ||
| + | * 2026 - FID for expansion project | ||
=== Geology === | === Geology === | ||
| Line 36: | Line 39: | ||
# [https://abarrelfull.blogspot.com/2023/03/chevron-announces-agreement-to-acquire.html Chevron Announces Agreement to Acquire Noble Energy] | # [https://abarrelfull.blogspot.com/2023/03/chevron-announces-agreement-to-acquire.html Chevron Announces Agreement to Acquire Noble Energy] | ||
# [https://abarrelfull.blogspot.com/2023/03/commencement-of-piping-of-natural-gas.html Commencement of the piping of natural gas from the Leviathan reservoir] | # [https://abarrelfull.blogspot.com/2023/03/commencement-of-piping-of-natural-gas.html Commencement of the piping of natural gas from the Leviathan reservoir] | ||
| + | # [https://a-barrel-full.blogspot.com/2026/01/chevron-takes-final-investment-decision.html Chevron takes Final Investment Decision on Leviathan gas expansion] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Israel]] | [[category:Israel]] | ||
[[category:Chevron]] | [[category:Chevron]] | ||
Revision as of 17:12, 23 January 2026
Summary Information
- Operator: Chevron
- Country: Israel
- Location: Levantine basin
- Production start:
- Partners: Chevron Mediterranean Limited as operator (39.66%), NewMed Energy (45.34%), and Ratio Energies (15%).
- Type: Gas
- Estimated Reserves: recoverable gross mean resources of 18 trillion cubic feet
- Production Volume:
Description
- The Leviathan Field is located in the Israeli EEZ, approximately 130 km off the shores of Haifa. Production is facilitated by 4 subsea wells that are connected, via a subsea manifold and two 120 km long pipelines, to an offshore platform, where all processing of gas takes place. From the platform the gas is piped to shore into the Israeli national grid.
- Gas is supplied to Jordan and Egypt as well as Israel
- An expansion project is under way that includes drilling three additional offshore wells, adding additional subsea infrastructure, and enhancing the treatment facilities on the Leviathan production platform. This will increase capacity to deliver approximately 21 billion cubic meters (BCM) annually
Contractors
- **CIT:** Project management and conceptual engineering
- **Aker Solutions:** Hydrate Inhibition FEED
History
- 2010 - Noble Energy Announces Significant Discovery at Leviathan
- 2013 - Noble Energy Announces Increase In Leviathan Resource Estimate to 18 trillion cubic feet
- 2017 - Final investment decision
- 2019 - First gas produced
- 2020 - Chevron acquires Noble Energy
- 2026 - FID for expansion project
Geology
- Noble encountered 220 feet (67 meters) of net natural gas pay in several subsalt Miocene intervals.
Links
- Aker Solutions Hydrate Inhibition References
- Noble Energy Announces Successful Leviathan Appraisal Results and Increases Resource Size
- Noble Energy Provides Update On Leviathan Deep
- Noble Energy Announces Significant Discovery at Leviathan Offshore Israel
- Noble Energy Announces Increase In Leviathan Resource Estimate
- Chevron Announces Agreement to Acquire Noble Energy
- Commencement of the piping of natural gas from the Leviathan reservoir
- Chevron takes Final Investment Decision on Leviathan gas expansion