Difference between revisions of "Ghasha and Hail Sour Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
Line 15: Line 15:
  
 
=== Contractors ===
 
=== Contractors ===
 +
* Hail & Ghasha
 +
** FEED: Bechtel
 
* Dalma
 
* Dalma
 +
** FEED: TechnipFMC
 
** Package A: EPC four offshore wellhead towers, pipelines and umbilicals in Hair Dalma, Satah, and Bu Haseer fields valued at $514 million (AED1.89 billion).  
 
** Package A: EPC four offshore wellhead towers, pipelines and umbilicals in Hair Dalma, Satah, and Bu Haseer fields valued at $514 million (AED1.89 billion).  
 
** Package B: Técnicas Reunidas \ Target Engineering JV - EPC of gas conditioning facilities for gas dehydration, compression and associated utilities valued at $950 million (AED3.49 billion)
 
** Package B: Técnicas Reunidas \ Target Engineering JV - EPC of gas conditioning facilities for gas dehydration, compression and associated utilities valued at $950 million (AED3.49 billion)
Line 22: Line 25:
 
=== History ===
 
=== History ===
 
* 2018 - Eni bought a 25 percent stake the project
 
* 2018 - Eni bought a 25 percent stake the project
* 2021 - engineering, procurement and construction (EPC) contracts awarded for Dalma
+
* 2018 - FEED Contracts awarded
 +
* 2021 - Engineering, procurement and construction (EPC) contracts awarded for Dalma
 
* 2022 - ADNOC Drilling awarded drilling contract
 
* 2022 - ADNOC Drilling awarded drilling contract
 
* 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works
 
* 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works
Line 30: Line 34:
  
 
=== Links ===
 
=== Links ===
 +
 
# [http://killajoules.wikidot.com/archive:eni-signs-ghasha-gas-concession-with-adnoc-strengthe Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates]
 
# [http://killajoules.wikidot.com/archive:eni-signs-ghasha-gas-concession-with-adnoc-strengthe Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates]
 +
# [https://abarrelfull.blogspot.com/2023/01/adnocs-sour-gas-hail-ghasha-and-dalma.html ADNOC’s Sour Gas Hail, Ghasha and Dalma Project Takes Critical Next Step]
 
# [https://abarrelfull.blogspot.com/2023/01/adnoc-awards-146-billion-epc-contracts.html ADNOC Awards $1.46 Billion EPC Contracts for the Dalma Gas Development Project]
 
# [https://abarrelfull.blogspot.com/2023/01/adnoc-awards-146-billion-epc-contracts.html ADNOC Awards $1.46 Billion EPC Contracts for the Dalma Gas Development Project]
 
# [https://abarrelfull.blogspot.com/2023/01/adnoc-drilling-confirms-2-billion.html ADNOC Drilling Confirms $2 Billion Contract Award to Enable Delivery of Ghasha Mega-Project]
 
# [https://abarrelfull.blogspot.com/2023/01/adnoc-drilling-confirms-2-billion.html ADNOC Drilling Confirms $2 Billion Contract Award to Enable Delivery of Ghasha Mega-Project]

Revision as of 10:19, 23 January 2023

Summary Information

  • Operator: ADNOC
  • Country: Abu Dhabi
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: Planned - 1.5 billion standard cubic feet (bscfd) of natural gas per day

Description

  • The Ghasha mega-project is the world’s largest offshore sour gas development
  • The concession is located offshore Abu Dhabi and consists of three major gas and condensate development projects Hail, Ghasha and Dalma as well as other offshore oil, gas and condensate fields including Nasr, SARB and Mubarraz.
    • Dalma: Gas conditioning facilities located on Arzanah Island located 80 kilometers from Abu Dhabi

Contractors

  • Hail & Ghasha
    • FEED: Bechtel
  • Dalma
    • FEED: TechnipFMC
    • Package A: EPC four offshore wellhead towers, pipelines and umbilicals in Hair Dalma, Satah, and Bu Haseer fields valued at $514 million (AED1.89 billion).
    • Package B: Técnicas Reunidas \ Target Engineering JV - EPC of gas conditioning facilities for gas dehydration, compression and associated utilities valued at $950 million (AED3.49 billion)
  • Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works

History

  • 2018 - Eni bought a 25 percent stake the project
  • 2018 - FEED Contracts awarded
  • 2021 - Engineering, procurement and construction (EPC) contracts awarded for Dalma
  • 2022 - ADNOC Drilling awarded drilling contract
  • 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works

Geology

Links

  1. Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates
  2. ADNOC’s Sour Gas Hail, Ghasha and Dalma Project Takes Critical Next Step
  3. ADNOC Awards $1.46 Billion EPC Contracts for the Dalma Gas Development Project
  4. ADNOC Drilling Confirms $2 Billion Contract Award to Enable Delivery of Ghasha Mega-Project
  5. A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi