Difference between revisions of "Alder Gas and Condensate Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Chevron * Country: UK * Location: North Sea * Production start: 2016 * Partners: Chevron - 70%, Conocophillips - 25%, GDF-Suez - 5% * Type: G...")
 
Line 1: Line 1:
 
Summary Information
 
Summary Information
* Operator: Chevron
+
* Operator: Ithaca
 
* Country: UK
 
* Country: UK
 
* Location: North Sea
 
* Location: North Sea
Line 25: Line 25:
 
* 2014 - Final investment decision
 
* 2014 - Final investment decision
 
* 2016 - First gas produced
 
* 2016 - First gas produced
 +
* 2019 - Ithaca energy acquired Chevron's stake
  
 
+++ Geology
 
+++ Geology
Line 34: Line 35:
 
# [http://killajoules.wikidot.com/blog:4881 Chevron Makes Final Investment Decision on Alder Field in the United Kingdom]
 
# [http://killajoules.wikidot.com/blog:4881 Chevron Makes Final Investment Decision on Alder Field in the United Kingdom]
 
# [http://killajoules.wikidot.com/archive:alder-field-achieves-first-gas Alder field achieves first gas]
 
# [http://killajoules.wikidot.com/archive:alder-field-achieves-first-gas Alder field achieves first gas]
 +
# [https://abarrelfull.blogspot.com/2023/05/acquisition-of-chevron-north-sea-limited.html Acquisition Of Chevron North Sea Limited]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:Ithaca]]

Revision as of 10:55, 8 May 2023

Summary Information

  • Operator: Ithaca
  • Country: UK
  • Location: North Sea
  • Production start: 2016
  • Partners: Chevron - 70%, Conocophillips - 25%, GDF-Suez - 5%
  • Type: Gas And Condensate
  • Estimated Reserves: 4,820 million scm of gas (recoverable)
  • Production Volume:

+++ Description

  • The field is to be developed as a subsea tieback to the [[[Britannia Gas Field]]]
  • The field development will consist of drilling of up to two production wells and the installation of subsea infrastructure, including a production manifold, a 27 kilometre (km) production flowline to transport reservoir fluids to the Britannia BLP and a control and chemical umbilical.
  • The Alder Field has a maximum estimated recovery of 4,820 million scm of gas over an estimated field life of 10 years.
  • The project has a planned design capacity of 110 million cubic feet of natural gas and 14,000 barrels of condensate per day

+++ Contractors

  • **Technip:** engineering, manufacturing and installation:
    • the detailed design and pipelay of a 28-kilometer 16” pipe-in-pipe system,
    • the installation of a 28-kilometer hybrid umbilical
    • various subsea works including the installation of a manifold structure including HIPPS, subsea isolation valve structure, valves and spoolpiece components.

+++ History

  • 2013 - Technip awarded subsea contract
  • 2014 - Final investment decision
  • 2016 - First gas produced
  • 2019 - Ithaca energy acquired Chevron's stake

+++ Geology

+++ Links

  1. Serimax Pipeline References
  2. Technip awarded subsea contract by Chevron North Sea
  3. Chevron Makes Final Investment Decision on Alder Field in the United Kingdom
  4. Alder field achieves first gas
  5. Acquisition Of Chevron North Sea Limited