Difference between revisions of "Dvalin Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: DEA * Country: Norway * Location: Norwegian Sea * Production start: First gas is expected in 2023 * Partners: DEA Norge AS (40%), Edis...")
 
Line 25: Line 25:
 
* 2012 - A second gas-bearing reservoir was discovered
 
* 2012 - A second gas-bearing reservoir was discovered
 
* 2016 - Contracts awarded for the development
 
* 2016 - Contracts awarded for the development
 +
* 2019 - First production wells drilled
 +
* 2021 - Project delayed due to high levels of mercury
  
 
=== Geology
 
=== Geology
Line 34: Line 36:
 
# [http://killajoules.wikidot.com/archive:aker-solutions-wins-subsea-contracts-for-dvalin-gas Aker Solutions Wins Subsea Contracts for Dvalin Gas Field]
 
# [http://killajoules.wikidot.com/archive:aker-solutions-wins-subsea-contracts-for-dvalin-gas Aker Solutions Wins Subsea Contracts for Dvalin Gas Field]
 
# [http://killajoules.wikidot.com/archive:technip-awarded-important-contract-for-dvalin-subsea Technip awarded important contract for Dvalin subsea development]
 
# [http://killajoules.wikidot.com/archive:technip-awarded-important-contract-for-dvalin-subsea Technip awarded important contract for Dvalin subsea development]
 +
# [https://abarrelfull.blogspot.com/2023/01/dvalin-commercial-production-delayed.html Dvalin commercial production delayed]

Revision as of 14:39, 5 January 2023

Summary Information

  • Operator: DEA
  • Country: Norway
  • Location: Norwegian Sea
  • Production start: First gas is expected in 2023
  • Partners: DEA Norge AS (40%), Edison (20%), Maersk Oil Norway AS (20%), OMV Norge (20%)
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Dvalin gas field was previously known as Zidane, consists of two separate structures: Dvalin East and Dvalin West. The water depth is 400 metres.
  • The field is located in Production Licence (PL) 435, approximately 15 kilometres northwest of the Heidrun field and 35 kilometres south of the Skarv field in the Norwegian Sea.
  • The development concept is a subsea template with four gas producers tied back to the Heidrun platform.
  • Gas from the field will be transported via Heidrun through the Polarled Gas Pipeline to the Nyhamna Gas Plant
  • Production was delayed when the level of mercury in the gas exceeded what was expected.


Contractors

  • **Technip**: EPCI contract for the subsea development
  • **Aker Solutions:** A production system encompassing a manifold, four subsea trees and a 15-kilometer long umbilical

History

  • 2010 - Dvalin Gas Field discovered
  • 2012 - A second gas-bearing reservoir was discovered
  • 2016 - Contracts awarded for the development
  • 2019 - First production wells drilled
  • 2021 - Project delayed due to high levels of mercury

=== Geology

  • Dvalin consists of two separate structures, Dvalin East and Dvalin West. Both discoveries contain gas in Middle Jurassic sandstones of the Garn and Ile Formations.

Links

  1. 6507/7-14 S DVALIN, NPD
  2. Dvalin, DEA
  3. Aker Solutions Wins Subsea Contracts for Dvalin Gas Field
  4. Technip awarded important contract for Dvalin subsea development
  5. Dvalin commercial production delayed