Difference between revisions of "Cygnus Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 3: | Line 3: | ||
* Country: UK | * Country: UK | ||
* Location: Southern North Sea | * Location: Southern North Sea | ||
− | * Production start: | + | * Production start: 2016 |
* Partners: GDF SUEZ (38.75%), Centrica (48.75%) and Bayerngas (12.5%) | * Partners: GDF SUEZ (38.75%), Centrica (48.75%) and Bayerngas (12.5%) | ||
* Type: Gas | * Type: Gas | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
− | * Cygnus is the largest gas discovery in the Southern North Sea for | + | * Cygnus is the largest gas discovery in the Southern North Sea for 30 years is now the largest single producing gas field in the UK |
− | * | + | * Two drilling centres target ten wells. Cygnus Alpha consists of three bridge-linked platforms: a wellhead drilling centre, a processing/utilities unit and living quarters/central control room. |
+ | * Cygnus Bravo, an unmanned satellite platform, is approximately seven kilometres northwest of Cygnus Alpha. | ||
+ | * Gas is exported via a 55 km pipeline. Cygnus connects via the [[Esmond Transmission System (ETS) pipeline]] to the gas-treatment terminal at Bacton, Norfolk | ||
* It is planned that construction will start in April 2013 with first gas expected in 2015 | * It is planned that construction will start in April 2013 with first gas expected in 2015 | ||
* The Cygnus partnership plans to invest £1.4 billion to develop the project | * The Cygnus partnership plans to invest £1.4 billion to develop the project | ||
Line 19: | Line 21: | ||
* **Burntisland Fabrications:** Design, procurement and construction of four jackets, complete with piles | * **Burntisland Fabrications:** Design, procurement and construction of four jackets, complete with piles | ||
* **Heerema Fabrication:** fabrication and commissioning of four topsides | * **Heerema Fabrication:** fabrication and commissioning of four topsides | ||
− | * **Proserv:** Design, engineering and build of wellhead control panels and accompanying topside umbilical termination unit for the Alpha and Bravo platforms | + | * **Proserv:** Design, engineering and build of wellhead control panels and accompanying topside umbilical termination unit for the Alpha and Bravo platforms |
=== History === | === History === |
Revision as of 14:55, 20 September 2022
Summary Information
- Operator: GDF Suez E&P
- Country: UK
- Location: Southern North Sea
- Production start: 2016
- Partners: GDF SUEZ (38.75%), Centrica (48.75%) and Bayerngas (12.5%)
- Type: Gas
- Estimated Reserves: gross 2P reserves of approximately 18 billion cubic metres
- Production Volume:
Description
- Cygnus is the largest gas discovery in the Southern North Sea for 30 years is now the largest single producing gas field in the UK
- Two drilling centres target ten wells. Cygnus Alpha consists of three bridge-linked platforms: a wellhead drilling centre, a processing/utilities unit and living quarters/central control room.
- Cygnus Bravo, an unmanned satellite platform, is approximately seven kilometres northwest of Cygnus Alpha.
- Gas is exported via a 55 km pipeline. Cygnus connects via the Esmond Transmission System (ETS) pipeline to the gas-treatment terminal at Bacton, Norfolk
- It is planned that construction will start in April 2013 with first gas expected in 2015
- The Cygnus partnership plans to invest £1.4 billion to develop the project
+++ Contractors
- **AMEC:** Front End Engineering Design (FEED)
- **Burntisland Fabrications:** Design, procurement and construction of four jackets, complete with piles
- **Heerema Fabrication:** fabrication and commissioning of four topsides
- **Proserv:** Design, engineering and build of wellhead control panels and accompanying topside umbilical termination unit for the Alpha and Bravo platforms
History
- 2008 - Tullow sold its stake to Venture
- 2009 - Successful appraisal well drilled
- 2010 - Appraisal completed
- 2011 - AMEC awarded FEED contract
- 2012 - Project development approved by UK Government
- 2012 - Major contracts signed by GDF Suez
- 2012 - Construction starts on Cygnus Alpha Wellhead Platform
- 2018 - Neptune acquired Engie's stake
+++ Geology
Links
- Sale of 10 CMS Area blocks to Venture Production plc
- AMEC awarded FEED contract for GDF SUEZ E&P UK’s Cygnus field in Southern North Sea
- Successful Southern North Sea appraisal well
- EIS Report
- Second Western Area Well Success Completes Cygnus Field Appraisal
- Centrica welcomes shallow water gas field allowance
- Cygnus project brings 1,200 jobs to UK
- BiFab secures a £47m contract and creates 100 new jobs
- Cygnus project award for Heerema Fabrication Group's Hartlepool yard
- Proserv wins Cygnus topside controls contract
- Construction starts on Cygnus gas development
- Scottish Jobs Boost As Cygnus Jacket Fabrication Begins
- Neptune Energy completes the acquisition of ENGIE E&P International SA