Difference between revisions of "Moscow Refinery Euro V+ Project"

From A Barrel Full
Jump to navigation Jump to search
Line 48: Line 48:
  
 
# [http://killajoules.wikidot.com/archive:russian-produced-equipment-for-construction-of-a-eur/ Russian-Produced Equipment For Construction Of A Euro+ Refining Facility At Gazprom Neft’s Moscow Refinery Is Delivered To Moscow]
 
# [http://killajoules.wikidot.com/archive:russian-produced-equipment-for-construction-of-a-eur/ Russian-Produced Equipment For Construction Of A Euro+ Refining Facility At Gazprom Neft’s Moscow Refinery Is Delivered To Moscow]
 +
# [https://abarrelfull.blogspot.com/2022/01/president-of-russia-vladimir-putin.html President of Russia Vladimir Putin launches the new high-tech “Euro+” complex at the Gazprom Neft Moscow Refinery]

Revision as of 11:58, 11 January 2022

Summary Information

The Project

  • Project Type: Upgrade
  • Project Summary:
  • Main Contractors

Refining Units

  • Vacuum distillation unit
  • Fluidised catalytic cracker

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -


Products Produced

  • The project will result in more gasoline and less residual fuel oil

History

  • 2017 - The VDU was delivered to the site
  • 2020 - The project was completed

Other Information

  • -