Difference between revisions of "Sangomar Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 21: | Line 21: | ||
=== History === | === History === | ||
+ | * 2018 - Subsea Integration Alliance wins FEED Contract | ||
+ | * 2020 - Subsea Integration Alliance wins EPCI Contract | ||
* 2021 - Woodside increases its stake in the project to over 80% | * 2021 - Woodside increases its stake in the project to over 80% | ||
Revision as of 12:12, 15 December 2021
Summary Information
- Operator: Woodside
- Country: Senegal
- Location: Offshore, 100 kilometres south of Dakar
- Production start: 2023 (expected)
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Sangomar Field Development Phase 1 will comprise the Woodside Sangomar FPSO with a production capacity of approximately 100,000 barrels per day, 23 subsea wells and supporting subsea infrastructure.
Contractors
- Modec:
- Front End Engineering Design (FEED)for the FPSO
- FPSO purchase contract
- Sofec: External Turret mooring system
- Subsea 7: provision of 107 km of rigid flowlines, 28 km of flexible risers and jumpers, and 45 km of umbilicals.
- OneSubsea: Supply a portfolio of standard systems including 23 wellhead systems, 11 subsea production trees, 10 water injection trees, 2 gas injection trees, topside controls and intervention tools and life-of-field support
History
- 2018 - Subsea Integration Alliance wins FEED Contract
- 2020 - Subsea Integration Alliance wins EPCI Contract
- 2021 - Woodside increases its stake in the project to over 80%