Difference between revisions of "Freeport LNG Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "=== Summary Information ===  * Ownership: Freeport LNG  * Dow, Zachry, Osaka Gas, * Website: http://www.freeportlng.com/ * Location: Quintana Island in Texas  * Capacity: 4.4...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 2: | Line 2: | ||
* Ownership: Freeport LNG  | * Ownership: Freeport LNG  | ||
| − | + | ** Dow, Zachry, Osaka Gas,  | |
* Website: http://www.freeportlng.com/  | * Website: http://www.freeportlng.com/  | ||
* Location: Quintana Island in Texas    | * Location: Quintana Island in Texas    | ||
| Line 8: | Line 8: | ||
* Status: Planned  | * Status: Planned  | ||
| − | + | === Brief Description ===  | |
* A three train liquifaction plant, it is to be built in stages  | * A three train liquifaction plant, it is to be built in stages  | ||
| − | * The project is a conversion of the   | + | * The project is a conversion of the [[Freeport LNG Import Terminal]], which was a regasification terminal  | 
| − | + | === Technical Details ===  | |
* Storage capacity:  | * Storage capacity:  | ||
* Constructor:  | * Constructor:  | ||
| − | + | ** **CB&I and Zachry:** Front-end engineering and design on the liquefaction terminal  | |
| − | + | ** **CB&I and Zachry:** Engineering and procurement services  | |
* **GE:** Supplying the main refrigeration compressors, variable-speed drive electric motors and other electrical equipment for two LNG liquefaction trains  | * **GE:** Supplying the main refrigeration compressors, variable-speed drive electric motors and other electrical equipment for two LNG liquefaction trains  | ||
| − | * Licensor: [[  | + | * Licensor: [[LNG Terminals Using Air Products Technology | Air Products]] for all three trains  | 
| − | + | === Ongoing Projects/Project Status ===  | |
* Commissioning is expected in [[[LNG Terminals to be Completed in 2018 | 2018]]]  | * Commissioning is expected in [[[LNG Terminals to be Completed in 2018 | 2018]]]  | ||
| − | + | === Suppliers / Customers ===  | |
| − | * Suppliers: Gas is   | + | * Suppliers: Gas is supplied by the [[Gulf South Gas Pipeline System]] & [[Tejas Gas Pipeline]]  | 
* Customers:    | * Customers:    | ||
| − | + | ** Osaka Gas and Chubu Electric, the Japanese utilities have acquired rights to the 4.4 mtpa production capacity of the first train at Freeport over an initial 20-year term  | |
| − | + | ** BP will supply gas to PTT  | |
| − | + | === History ===  | |
* 2011 -  The project received approval from DOE to export LNG to Free Trade Agreement countries  | * 2011 -  The project received approval from DOE to export LNG to Free Trade Agreement countries  | ||
* 2012 - Freeport LNG and Zachry/CB&I JV Sign FEED Contract  | * 2012 - Freeport LNG and Zachry/CB&I JV Sign FEED Contract  | ||
Revision as of 09:36, 14 January 2022
Contents
Summary Information
- Ownership: Freeport LNG
- Dow, Zachry, Osaka Gas,
 
 - Website: http://www.freeportlng.com/
 - Location: Quintana Island in Texas
 - Capacity: 4.4 million tons/annum per train (Total 3)
 - Status: Planned
 
Brief Description
- A three train liquifaction plant, it is to be built in stages
 - The project is a conversion of the Freeport LNG Import Terminal, which was a regasification terminal
 
Technical Details
- Storage capacity:
 - Constructor:
- **CB&I and Zachry:** Front-end engineering and design on the liquefaction terminal
 - **CB&I and Zachry:** Engineering and procurement services
 
 - **GE:** Supplying the main refrigeration compressors, variable-speed drive electric motors and other electrical equipment for two LNG liquefaction trains
 - Licensor: Air Products for all three trains
 
Ongoing Projects/Project Status
- Commissioning is expected in [[[LNG Terminals to be Completed in 2018 | 2018]]]
 
Suppliers / Customers
- Suppliers: Gas is supplied by the Gulf South Gas Pipeline System & Tejas Gas Pipeline
 - Customers:
- Osaka Gas and Chubu Electric, the Japanese utilities have acquired rights to the 4.4 mtpa production capacity of the first train at Freeport over an initial 20-year term
 - BP will supply gas to PTT
 
 
History
- 2011 - The project received approval from DOE to export LNG to Free Trade Agreement countries
 - 2012 - Freeport LNG and Zachry/CB&I JV Sign FEED Contract
 - 2012 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreements With Osaka Gas And Chubu Electric
 - 2013 - Energy Department Authorizes Export of LNG
 - 2013 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreements With SK And Toshiba
 - 2013 - EPC contract signed
 - 2014 - Draft EIA report published
 - 2014 - Final EIA report given by FERC
 - 2015 - Financing completed for the 3rd train
 
+++ Other Information
- -
 
Links
- Macquarie Energy and Freeport LNG Expansion, L.P. to Jointly Develop U.S. LNG Export Project
 - Freeport LNG’s Liquefaction and Export Project
 - Freeport LNG and Zachry/CB&I JV Sign FEED Contract for Development of Freeport Liquefaction Project
 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreements With Osaka Gas And Chubu Electric
 - Energy Department Authorizes Second Proposed Facility To Export Liquefied Natural Gas
 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreement With SK E&S LNG
 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreement With Toshiba Corporation
 - CB&I Awarded Contract for LNG Liquefaction Terminal
 - FERC Staff Issues Draft Environmental Impact Statement on Freeport LNG
 - FERC issues final Environmental Impact Statement on the Liquefaction and Phase II Modification
 - Freeport LNG Selects GE for Major North American LNG Export Project
 - Air Products’ LNG Technology and Equipment Selected for Freeport Terminal Facility
 - Freeport LNG Closes Financing And Commences Construction Of Initial Two Natural Gas Liquefaction Trains
 - Freeport LNG Closes Financing and Starts Construction of Third Liquefaction Train
 - Air Products’ LNG Technology and Equipment Picked Again for Freeport LNG Terminal Facility
 - BP and PTT sign LNG sale and purchase agreement