Difference between revisions of "Algiers El Harrach Refinery Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Sonatrach Website: http://www.sonatrach-dz.com/ (French) Wiki Page: El Harrach Refinery Location: Algiers, Algeria Capacity: Before: 2.7 million...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
| − | Ownership: Sonatrach | + | * Ownership: Sonatrach |
| − | Website: http://www.sonatrach-dz.com/ (French) | + | * Website: http://www.sonatrach-dz.com/ (French) |
| − | Wiki Page: El Harrach Refinery | + | * Wiki Page: [[El Harrach Refinery]] |
| − | Location: Algiers, Algeria | + | * Location: Algiers, Algeria |
| − | Capacity: | + | * Capacity: |
| − | Before: 2.7 million tons/annum & 54,000 bbl/day | + | ** Before: 2.7 million tons/annum & 54,000 bbl/day |
| − | After: 3.6 million tons/annum & 72,000 bbl/day | + | ** After: 3.6 million tons/annum & 72,000 bbl/day |
| − | Nelson Complexity: | + | * Nelson Complexity: |
| − | Project Stage: | + | * Project Stage: Completed 2020 |
| − | + | * Budget: USD 908 million | |
| − | Budget: USD 908 million | + | === The Project |
| − | The Project | + | * Project Type: Upgrade and debottlenecking |
| − | Project Type: Upgrade and debottlenecking | + | * Project Summary: A refurbishment and revamping of the existing units plus the addition of gasoline specification units |
| − | Project Summary: A refurbishment and revamping of the existing units plus the addition of gasoline specification units | + | * Main Contractors |
| − | Main Contractors | + | ** Technip: Lump sum turnkey contract for the complete scope of works, including the design, supply of equipment and bulk material, construction and start-up |
| − | Technip: Lump sum turnkey contract for the complete scope of works, including the design, supply of equipment and bulk material, construction and start-up | + | === Refining Units === |
| − | Refining Units | + | * Topping and gas plant capacity increase. |
| − | Topping and gas plant capacity increase. | + | * New MS Block (NHT + Isom + CCR Reforming) |
| − | New MS Block (NHT + Isom + CCR Reforming) | + | * RFCC and Merox Units |
| − | RFCC and Merox Units | + | * Rehabilitation of Utility production and distribution facilities |
| − | Rehabilitation of Utility production and distribution facilities | + | * Moderniztion of the Instrumentation (implementation of DCS with a centralized control room) |
| − | Moderniztion of the Instrumentation (implementation of DCS with a centralized control room) | + | * Rehabilitation of electrical equipment, upgrading of electrical network, and setting up of a gas turbine, |
| − | Rehabilitation of electrical equipment, upgrading of electrical network, and setting up of a gas turbine, | + | * New Waste Water Treatment Unit (biological type) |
| − | New Waste Water Treatment Unit (biological type) | + | === Terminal Capacity === |
| − | Terminal Capacity | + | * Crude Oil: |
| − | Crude Oil: | + | * Refined Products: |
| − | Refined Products: | + | === Crude Supply === |
| − | Crude Supply | ||
- | - | ||
| − | Products Produced | + | === Products Produced === |
| − | Gasoline meeting Euro standards | + | * Gasoline meeting Euro standards |
| − | History | + | === History === |
| − | 2010 - Technip awarded LSTK contract for project | + | * 2010 - Technip awarded LSTK contract for project |
| − | 2013 - Emerson awarded valve supply contract | + | * 2013 - Emerson awarded valve supply contract |
| − | Other Information | + | * 2020 - Project completed |
| + | === Other Information | ||
- | - | ||
| − | + | === Links === | |
| − | Technip awarded major contract in Algeria | + | # [http://killajoules.wikidot.com/blog:223 Technip awarded major contract in Algeria] |
| − | Technip selects Emerson as main control valve supplier for Algiers Refinery upgrade project | + | # [http://killajoules.wikidot.com/archive:technip-selects-emerson-as-main-control-valve-suppli Technip selects Emerson as main control valve supplier for Algiers Refinery upgrade project] |
| − | Oil Refineries upgrading Program For the production of clean fuels In Algeria | + | # [http://www.oapecorg.org/ar/Bahrain%20Conference/Images/Bh%20Papers/First%20Day/SessionIII/Abdulkader-%20Djellout.pdf Oil Refineries upgrading Program For the production of clean fuels In Algeria] |
| + | # [http://killajoules.wikidot.com/archive:algiers-refinery:commissioning-of-production-units-a Algiers refinery: commissioning of production units (APS)] | ||
| + | |||
| + | [[category:Refinery]] | ||
| + | [[category:Algeria]] | ||
| + | [[category:Sonatrach]] | ||
Revision as of 13:01, 16 March 2020
Contents
Summary Information
- Ownership: Sonatrach
- Website: http://www.sonatrach-dz.com/ (French)
- Wiki Page: El Harrach Refinery
- Location: Algiers, Algeria
- Capacity:
- Before: 2.7 million tons/annum & 54,000 bbl/day
- After: 3.6 million tons/annum & 72,000 bbl/day
- Nelson Complexity:
- Project Stage: Completed 2020
- Budget: USD 908 million
=== The Project
- Project Type: Upgrade and debottlenecking
- Project Summary: A refurbishment and revamping of the existing units plus the addition of gasoline specification units
- Main Contractors
- Technip: Lump sum turnkey contract for the complete scope of works, including the design, supply of equipment and bulk material, construction and start-up
Refining Units
- Topping and gas plant capacity increase.
- New MS Block (NHT + Isom + CCR Reforming)
- RFCC and Merox Units
- Rehabilitation of Utility production and distribution facilities
- Moderniztion of the Instrumentation (implementation of DCS with a centralized control room)
- Rehabilitation of electrical equipment, upgrading of electrical network, and setting up of a gas turbine,
- New Waste Water Treatment Unit (biological type)
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- Gasoline meeting Euro standards
History
- 2010 - Technip awarded LSTK contract for project
- 2013 - Emerson awarded valve supply contract
- 2020 - Project completed
=== Other Information -