Difference between revisions of "Ima Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | == Summary Information === | + | === Summary Information === |
* Operator: TotalEnergies | * Operator: TotalEnergies | ||
* Country: Nigeria | * Country: Nigeria | ||
| Line 10: | Line 10: | ||
=== Description === | === Description === | ||
| − | * | + | * The Ima gas field lies above the Ima oil field |
| + | * The gas will be supplied to the [[Nigeria LNG Terminal Expansion]] | ||
=== Contractors === | === Contractors === | ||
| Line 16: | Line 17: | ||
=== History === | === History === | ||
| + | * 2005 - Total entered into a Joint Venture Agreement with Amni by acquiring a 40% working interest in both OMLs 112 and 117 | ||
* 2026 - Final investment decision made | * 2026 - Final investment decision made | ||
Latest revision as of 10:25, 24 September 2026
Summary Information
- Operator: TotalEnergies
- Country: Nigeria
- Location: Close to Bonny Island
- Production start: Estimated 2028
- Partners: TotalEnergies 40%, AMNI 60%
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Ima gas field lies above the Ima oil field
- The gas will be supplied to the Nigeria LNG Terminal Expansion
Contractors
- -
History
- 2005 - Total entered into a Joint Venture Agreement with Amni by acquiring a 40% working interest in both OMLs 112 and 117
- 2026 - Final investment decision made