Difference between revisions of "Ruwais LNG Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
  
 
* Ownership: ADNOC
 
* Ownership: ADNOC
 +
** Partners: ADNOC (60%), Shell (10%), bp (10%) TotalEnergies (10%) and Mitsui (10%).
 
* Website: https://www.adnoc.ae/
 
* Website: https://www.adnoc.ae/
 
* Wikipage: [[ADGAS Das Island LNG Terminal]]
 
* Wikipage: [[ADGAS Das Island LNG Terminal]]
 
* Location:  Al Ruwais Industrial City, Al Dhafrah, Abu Dhabi
 
* Location:  Al Ruwais Industrial City, Al Dhafrah, Abu Dhabi
* Capacity: million tons/annum  
+
* Capacity: 9.6 million tons/annum  
* Status: Planned
+
* Status: Under construction
  
 
=== Brief Description ===
 
=== Brief Description ===
Line 32: Line 33:
 
* 2024 - Notice to proceeed for EPC contractors
 
* 2024 - Notice to proceeed for EPC contractors
 
* 2024 - HOA signed to supply SEFE
 
* 2024 - HOA signed to supply SEFE
 +
* 2024 - Shell and TotalEnergies became partners
  
 
=== Other Information ===
 
=== Other Information ===

Latest revision as of 17:17, 21 January 2026

Summary Information

  • Ownership: ADNOC
    • Partners: ADNOC (60%), Shell (10%), bp (10%) TotalEnergies (10%) and Mitsui (10%).
  • Website: https://www.adnoc.ae/
  • Wikipage: ADGAS Das Island LNG Terminal
  • Location: Al Ruwais Industrial City, Al Dhafrah, Abu Dhabi
  • Capacity: 9.6 million tons/annum
  • Status: Under construction

Brief Description

  • The Ruwais LNG project consists of two 4.8 million metric tons per annum (mtpa) natural gas liquefaction trains with a total capacity of 9.6 mtpa of LNG.
  • The plant will use electric-driven motors instead of conventional gas turbines and will be powered by clean energy

Technical Details

  • Storage capacity:
  • Constructor:
    • Baker Hughes: Provision two electric liquefaction systems
    • Technip Energies, JGC Corporation and National Petroleum Construction Company: EPC contract
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2028

Suppliers / Customers

  • Suppliers: Gas will be supplied from a number of projects including the Ghasha and Hail Sour Gas Fields
  • Customers:
    • ENN: 1 million tons per year
    • SEFE: 1 million tons per year
    • EnBW: 0.6 million tons per year

History

  • 2024 - Notice to proceeed for EPC contractors
  • 2024 - HOA signed to supply SEFE
  • 2024 - Shell and TotalEnergies became partners

Other Information

  • -

Links

  1. Baker Hughes Announces Milestone Electric-LNG Award for ADNOC Ruwais LNG Export Terminal
  2. ADNOC Issues Early EPC Award for Ruwais LNG Project
  3. ADNOC Signs Second Long-Term Heads of Agreement for Ruwais LNG Project
  4. ADNOC Signs Third Long-Term Heads of Agreement for Ruwais LNG Project
  5. Technip Energies, JGC and NMDC Energy awarded a major contract for ADNOC’s Ruwais LNG project in the UAE
  6. Shell to invest in Ruwais LNG project in Abu Dhabi
  7. United Arab Emirates: TotalEnergies Strengthens its Position in the Emirates through its Partnership in Ruwais LNG