Difference between revisions of "Laurel Refinery"

From A Barrel Full
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
* Website: https://www.chsinc.com/
 
* Website: https://www.chsinc.com/
 
* Location: Laurel, Montana
 
* Location: Laurel, Montana
* Capacity: 3.0 million tons/annum & 60,000 bbl/day
+
* Capacity: 3.2 million tons/annum & 64,000 bbl/day
 
* Nelson Complexity:
 
* Nelson Complexity:
 
* Refining Depth:
 
* Refining Depth:
 +
 
=== Brief Description ===
 
=== Brief Description ===
-
+
 
 +
* A medium sized high complexity refinery that processes medium and high-sulfur crude oil
 +
 
 
=== Refining Units ===
 
=== Refining Units ===
 
* Atmospheric Distillation
 
* Atmospheric Distillation
 +
* Delayed coker - 15,000 bpd
 
* Diesel Hydrotreating
 
* Diesel Hydrotreating
 
* Steam methane reformer
 
* Steam methane reformer
 +
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
 
* Crude Oil:
 
* Crude Oil:
 
* Refined Products:
 
* Refined Products:
 
=== Crude Supply ===
 
=== Crude Supply ===
* Crude is supplied via the [[Front Range Crude Oil Pipeline]]
+
* Crude is supplied via the [[Express Oil Pipeline System]], [[Front Range Crude Oil Pipeline]] and the [[Silvertip Crude Oil Pipeline]]
 +
 
 
=== Products Produced ===
 
=== Products Produced ===
 
* Propane, gasoline, burner fuel, diesel fuel, asphalt, propane de-asphalted pitch
 
* Propane, gasoline, burner fuel, diesel fuel, asphalt, propane de-asphalted pitch
* Products are transported on the [[Cenex Oil Products Pipeline]]
+
* Products are transported on the [[Cenex Oil Products Pipeline]]  
 +
 
 
=== Projects ===
 
=== Projects ===
 
-
 
-
 +
 
=== Other Information ===
 
=== Other Information ===
 
-
 
-
Line 27: Line 35:
 
* 1943 - CHS acquires the refinery
 
* 1943 - CHS acquires the refinery
 
* 2005 - A new Ultra Low Sulfur Diesel (ULSD) clean fuels plant was completed
 
* 2005 - A new Ultra Low Sulfur Diesel (ULSD) clean fuels plant was completed
 +
* 2008 - Delayed coker constructed
 
* 2013 - Project launched to connect the refinery to the Express Oil Pipeline System
 
* 2013 - Project launched to connect the refinery to the Express Oil Pipeline System
 +
* 2014 - Expansion and upgrade project launched
 
* 2018 - New hydrogen unit commissioned
 
* 2018 - New hydrogen unit commissioned
 +
 
=== Links ===
 
=== Links ===
 
# [http://www.jhkelly.com/projects/chs-ulsd-project.html CHS ULSD Project Laurel, MT]
 
# [http://www.jhkelly.com/projects/chs-ulsd-project.html CHS ULSD Project Laurel, MT]
 +
# [[Foster Wheeler Delayed Cokers]]
 
# [http://killajoules.wikidot.com/blog:3824 CHS will boost crude oil access with Express Pipeline]  
 
# [http://killajoules.wikidot.com/blog:3824 CHS will boost crude oil access with Express Pipeline]  
 +
# [https://abarrelfull.blogspot.com/2024/06/chs-will-boost-diesel-production-with.html CHS will boost diesel production with $406 million Montana refinery investment]
 
# [http://killajoules.wikidot.com/archive:new-hydrogen-plant-utilizing-technipfmc-technology-i New hydrogen plant utilizing TechnipFMC technology in full operation, met performance targets, in Montana]
 
# [http://killajoules.wikidot.com/archive:new-hydrogen-plant-utilizing-technipfmc-technology-i New hydrogen plant utilizing TechnipFMC technology in full operation, met performance targets, in Montana]
 +
 +
[[category:Refinery]]
 +
[[category:USA]]
 +
[[category:CHS]]

Latest revision as of 10:23, 10 June 2024

Summary Information

  • Ownership: Cenex Harvest States Cooperatives CHS
  • Website: https://www.chsinc.com/
  • Location: Laurel, Montana
  • Capacity: 3.2 million tons/annum & 64,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A medium sized high complexity refinery that processes medium and high-sulfur crude oil

Refining Units

  • Atmospheric Distillation
  • Delayed coker - 15,000 bpd
  • Diesel Hydrotreating
  • Steam methane reformer

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

Products Produced

  • Propane, gasoline, burner fuel, diesel fuel, asphalt, propane de-asphalted pitch
  • Products are transported on the Cenex Oil Products Pipeline

Projects

-

Other Information

-

History

  • 1943 - CHS acquires the refinery
  • 2005 - A new Ultra Low Sulfur Diesel (ULSD) clean fuels plant was completed
  • 2008 - Delayed coker constructed
  • 2013 - Project launched to connect the refinery to the Express Oil Pipeline System
  • 2014 - Expansion and upgrade project launched
  • 2018 - New hydrogen unit commissioned

Links

  1. CHS ULSD Project Laurel, MT
  2. Foster Wheeler Delayed Cokers
  3. CHS will boost crude oil access with Express Pipeline
  4. CHS will boost diesel production with $406 million Montana refinery investment
  5. New hydrogen plant utilizing TechnipFMC technology in full operation, met performance targets, in Montana