Difference between revisions of "Kingfisher Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 17: | Line 17: | ||
=== Contractors === | === Contractors === | ||
| − | * | + | * BiFab: Fabrication of Manifold, SSIV, Topsides and Subsea Spools |
=== History === | === History === | ||
| Line 30: | Line 30: | ||
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [[UK Oil and Gas Field Approved Decommissioning Programmes]] | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
| + | # [[BiFab Subsea References]] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:UK]] | [[category:UK]] | ||
[[category:Shell]] | [[category:Shell]] | ||
Latest revision as of 15:32, 29 June 2024
Summary Information
- Operator: Shell
- Country: UK
- Location: North Sea
- Production start: 1997
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Kingfisher field lies in Block 16/8 of the UK Sector of the North Sea and comprises three reservoirs: Brae I (Gas/Condensate), Brae II (Volatile Oil) and Heather (Gas/Condensate).
- The Kingfisher field is located 280km Northeast of Aberdeen and was developed as a subsea tie-back to the Brae Bravo platform.
- The Kingfisher development comprises six subsea wells with rigid pipeline jumpers to a subsea manifold.
- Oil is exported via the Brae - Forties pipeline to the Forties Pipeline System
- Gas is transported to the SAGE St Fergus Gas Processing Terminal via the Scottish Area Gas Evacuation (SAGE) Pipeline
Contractors
- BiFab: Fabrication of Manifold, SSIV, Topsides and Subsea Spools
History
- 1996 - Approval granted for development
- 1997 - Production started
- 2021 - Approval granted for decommissioning