* Ownership: Total
 
* Ownership: Total
Line 6: Line 6:
 
* Capacity:  
 
* Capacity:  
  
+++ Brief Description
+
=== Brief Description ===
 
* It is a 3-train process plant that is now known as the Frigg UK Terminal.  
 
* It is a 3-train process plant that is now known as the Frigg UK Terminal.  
 
* Gas is transported to the plant by the **[[Frigg UK Gas Pipeline System]]** and from the [[Vesterled Gas Pipeline]] which brings gas from the Norwegian sector
 
* Gas is transported to the plant by the **[[Frigg UK Gas Pipeline System]]** and from the [[Vesterled Gas Pipeline]] which brings gas from the Norwegian sector
Line 12: Line 12:
 
* The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves.
 
* The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves.
  
++++ Related Oil and Gas Fields
+
==== Related Oil and Gas Fields ====
* It processes gas from the [[Greater Alwyn Oil And Gas Fields | Alwyn Area]] (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), [[Bruce Oil And Gas Field | Bruce]], [[Rhum Gas Field | Rhum]], Keith, [[Buzzard Oil Field | Buzzard]], the Flotta Catchment Area, [[Ross And Blake Oil Fields | Ross]] and [[Captain Oil Field | Captain]].
+
* It processes gas from the [[Greater Alwyn Oil and Gas Fields | Alwyn Area]] (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), [[Bruce Oil and Gas Field | Bruce]], [[Rhum Gas Field | Rhum]], Keith, [[Buzzard Oil Field | Buzzard]], the Flotta Catchment Area (including [[Piper Oil Field]]), [[Ross and Blake Oil Fields | Ross]] and [[Captain Oil Field | Captain]].
  
+++ Ongoing Projects
+
=== Ongoing Projects ===
 
* -
 
* -
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ History
+
=== History ===
 
* 1977 - Phase I of the plant was commissioned
 
* 1977 - Phase I of the plant was commissioned
 
* 1978 - Phase II was completed
 
* 1978 - Phase II was completed
 +
* 2015 - NSMP acquired the terminal from Total
  
+++ Links
+
=== Links ===
 
# [http://www.total-icop.co.uk/fuka/ Total, FUKA]
 
# [http://www.total-icop.co.uk/fuka/ Total, FUKA]
 +
# [https://abarrelfull.blogspot.com/2024/05/nsmp-acquires-major-pipeline-and.html NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited]

Latest revision as of 15:55, 30 May 2024

Summary Information

Brief Description

Related Oil and Gas Fields

Ongoing Projects

  • -

Other Information

  • -

History

  • 1977 - Phase I of the plant was commissioned
  • 1978 - Phase II was completed
  • 2015 - NSMP acquired the terminal from Total

Links

  1. Total, FUKA
  2. NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited