Abarrelfull (talk | contribs) (Created page with "Summary Information * Name: Sendje Ceiba FPSO * Field: Ceiba Oil Field * Country: Equatorial Guinea * Ownership: BW-Offshore * Website: http://www.bwoffshore.com/ * Field...") |
Abarrelfull (talk | contribs) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Name: Sendje Ceiba FPSO | * Name: Sendje Ceiba FPSO | ||
| Line 10: | Line 10: | ||
* Year of Completion: 2001 | * Year of Completion: 2001 | ||
| − | + | === Brief Description === | |
* The Sendje Ceiba FPSO is a 275,000 dwt (dead weight tonnes) turbine tanker. The vessel measures approximately 350 meters (1,150 feet) in length and 52 meters (170 feet) in width. | * The Sendje Ceiba FPSO is a 275,000 dwt (dead weight tonnes) turbine tanker. The vessel measures approximately 350 meters (1,150 feet) in length and 52 meters (170 feet) in width. | ||
* Sendje Ceiba has been outfitted with onboard liquids-processing capacity of 160,000 barrels per day (bpd) and water-injection capacity of 135,000 bpd | * Sendje Ceiba has been outfitted with onboard liquids-processing capacity of 160,000 barrels per day (bpd) and water-injection capacity of 135,000 bpd | ||
* The deck area is equivalent to nearly four football fields. The vessel's crude oil storage capacity is two million barrels | * The deck area is equivalent to nearly four football fields. The vessel's crude oil storage capacity is two million barrels | ||
| − | * The [[Okume Oil | + | * The [[Okume and Oveng Oil Fields]] have been developed as a tie back to the Sendje Ceiba FPSO |
| − | + | === Contractors === | |
| − | * | + | * '''SembCorp Marine:''' FPSO conversion |
| − | * | + | * '''Stolt Offshore:''' |
| − | + | ** Transport and installation of a 550T Utility Deck Module for the Ceiba FPSO, the installation of subsea pumps, rigid spools and umbilicals | |
| − | * | + | * '''Bluewater:''' Design, supply and installation of a turret CALM buoy, a 1 mile subsea pipeline linking the CALM buoy to the FPSO, and the subsea flexible hoses connecting the FPSO and buoy to each end of the pipeline |
| − | * | + | * '''ABB Offshore Systems:''' Fabrication of the oil and gas processing facilities |
| − | * | + | * '''Inocean:''' Design |
| − | * | + | * '''ABB:''' Electrical Systems |
| − | * | + | * '''Kavin Engineering:''' OKUME & OVENG Field’s – FPSO Topsides – Bid Support |
| − | + | === Status === | |
* In operation | * In operation | ||
| − | + | === History === | |
* 2001- The Sendje Ceiba FPSO is completed | * 2001- The Sendje Ceiba FPSO is completed | ||
| − | * 2006 - First oil flows from the | + | * 2006 - First oil flows from the Okume Oil Field |
| − | + | === Other Information === | |
* - | * - | ||
| − | + | === Links === | |
# [[ABB FPSO References]] | # [[ABB FPSO References]] | ||
# [[International Protective Coatings FPSO References]] | # [[International Protective Coatings FPSO References]] | ||
Latest revision as of 12:19, 18 July 2024
Contents
Summary Information
- Name: Sendje Ceiba FPSO
- Field: Ceiba Oil Field
- Country: Equatorial Guinea
- Ownership: BW-Offshore
- Website: http://www.bwoffshore.com/
- Field Operated By: Hess
- Capacity: 160,000 bpd
- Year of Completion: 2001
Brief Description
- The Sendje Ceiba FPSO is a 275,000 dwt (dead weight tonnes) turbine tanker. The vessel measures approximately 350 meters (1,150 feet) in length and 52 meters (170 feet) in width.
- Sendje Ceiba has been outfitted with onboard liquids-processing capacity of 160,000 barrels per day (bpd) and water-injection capacity of 135,000 bpd
- The deck area is equivalent to nearly four football fields. The vessel's crude oil storage capacity is two million barrels
- The Okume and Oveng Oil Fields have been developed as a tie back to the Sendje Ceiba FPSO
Contractors
- SembCorp Marine: FPSO conversion
- Stolt Offshore:
- Transport and installation of a 550T Utility Deck Module for the Ceiba FPSO, the installation of subsea pumps, rigid spools and umbilicals
- Bluewater: Design, supply and installation of a turret CALM buoy, a 1 mile subsea pipeline linking the CALM buoy to the FPSO, and the subsea flexible hoses connecting the FPSO and buoy to each end of the pipeline
- ABB Offshore Systems: Fabrication of the oil and gas processing facilities
- Inocean: Design
- ABB: Electrical Systems
- Kavin Engineering: OKUME & OVENG Field’s – FPSO Topsides – Bid Support
Status
- In operation
History
- 2001- The Sendje Ceiba FPSO is completed
- 2006 - First oil flows from the Okume Oil Field
Other Information
- -
Links
- ABB FPSO References
- International Protective Coatings FPSO References
- Kavin Engineering FPSO References
- Inocean FPSO References
- Triton Awards Ceiba Crude Offloading System Contract to Bluewater
- Amerada Hess Announces the Upgrading and Renaming of Vessel to Accommodate Increased Ceiba Field Production
- Hess Corporation Announces First Oil Production From Okume Complex Offshore Equatorial Guinea