Difference between revisions of "Bleo Holm FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Name: Bleo Holm FPSO | * Name: Bleo Holm FPSO | ||
| Line 6: | Line 6: | ||
* Ownership: Bluewater | * Ownership: Bluewater | ||
* Website: http://www.bluewater.com/ | * Website: http://www.bluewater.com/ | ||
| − | * Field Operated By: | + | * Field Operated By: Repsol |
* Capacity: 100,000 bpd | * Capacity: 100,000 bpd | ||
* Year of Completion: | * Year of Completion: | ||
| − | + | === Brief Description === | |
* Gross liquids capacity is 126 MBPD and dry oil production capacity 100 MBPD. | * Gross liquids capacity is 126 MBPD and dry oil production capacity 100 MBPD. | ||
| Line 18: | Line 18: | ||
* The living quarters have capacity for 90 people | * The living quarters have capacity for 90 people | ||
| − | + | === Contractors === | |
* **Bluewater:** | * **Bluewater:** | ||
** Vessel Design | ** Vessel Design | ||
| Line 28: | Line 28: | ||
* **Nessco:** Communication systems | * **Nessco:** Communication systems | ||
| − | + | === Status === | |
* In operation | * In operation | ||
| − | + | === History === | |
* 2001 - Production started on the Blake field following modifications | * 2001 - Production started on the Blake field following modifications | ||
* 2007 - Fatal accident on the vessel | * 2007 - Fatal accident on the vessel | ||
| − | + | === Other Information === | |
* - | * - | ||
| − | + | === Links === | |
# [[Bluewater Mooring References]] | # [[Bluewater Mooring References]] | ||
Latest revision as of 08:59, 16 July 2024
Contents
Summary Information
- Name: Bleo Holm FPSO
- Field: Ross and Blake Oil Fields
- Country: UK
- Ownership: Bluewater
- Website: http://www.bluewater.com/
- Field Operated By: Repsol
- Capacity: 100,000 bpd
- Year of Completion:
Brief Description
- Gross liquids capacity is 126 MBPD and dry oil production capacity 100 MBPD.
- Water treatment capacity is 125 MBPD
- Gas compression capacity is 58 MMSCFD
- Water-injection capacity is 140 MBPD
- The living quarters have capacity for 90 people
Contractors
- **Bluewater:**
- Vessel Design
- Internal Turret
- **Hitachi:** Vessel construction
- **Fluor / United Industrial Enterprise:** Engineering, procurement, and construction (EPC) of the process facility storage and offloading unit. The process facilities include oil/water separation, gas compression, seawater treatment, and seawater injection into the reservoir.
- **Saipem:** FPSO topsides - EPIC
- **BiFab:** Design and Manufacture of a 90 Man Living Quarters
- **Nessco:** Communication systems
Status
- In operation
History
- 2001 - Production started on the Blake field following modifications
- 2007 - Fatal accident on the vessel
Other Information
- -
Links
- Bluewater Mooring References
- International Protective Coatings FPSO References
- Nessco FPSO References
- Saipem Fixed Offshore Production Facilities Project References
- Bluewater Engineering - Bleo Holm FPSO Process Facility - EPC
- FPSO technology benefits Ross and Blake oil fields
- Incident on FPSO Bleo Holm