Difference between revisions of "Armada Sterling V FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 4: | Line 4: | ||
* Field: [[Cluster 2 Oil and Gas Fields]] | * Field: [[Cluster 2 Oil and Gas Fields]] | ||
* Country: India | * Country: India | ||
| − | * Ownership: | + | * Ownership: SPBAG: a 30:70 joint venture between Bumi Armada and Shapoorji Pallonji Oil & Gas |
* Website: | * Website: | ||
* Field Operated By: ONGC | * Field Operated By: ONGC | ||
| − | * Capacity: | + | * Capacity: 90,000 bpd |
| − | * Year of Completion: | + | * Year of Completion: 2022 |
=== Brief Description === | === Brief Description === | ||
| + | * The vessel is a conversion of the Ariake, a very large crude carrier (VLCC) | ||
* The vessel will produce up to 90,000 barrels of oil per day (BOPD) and have a 1.3-million-barrel storage facility. | * The vessel will produce up to 90,000 barrels of oil per day (BOPD) and have a 1.3-million-barrel storage facility. | ||
=== Contractors === | === Contractors === | ||
| − | * | + | * Sembcorp Marine: Hull repairs and upgrading as well as fabrication of topside modules |
| + | * VME: 5 Topsides modules including: | ||
| + | ** M40 Produced Water Treatment Module, M51 Seawater treatment Modules, M53 Chemical Injection Module, M54 Hydrocarbon Dewpoint and Gas Dehydration Modules, M90 Metering Laydown Module | ||
=== Status === | === Status === | ||
| − | * | + | * In operation |
=== History === | === History === | ||
| − | * 2019 - SPBAG and ONGC sign 9 year contract for vessel | + | * 2019 - SPBAG and ONGC sign 9-year contract for vessel |
| + | * 2019 - Sembcorp Marine awarded conversion contract | ||
| + | * 2022 - Vessel set sail for India | ||
=== Other Information === | === Other Information === | ||
| Line 30: | Line 35: | ||
# [https://abarrelfull.blogspot.com/2023/11/notification-of-award-for-charter.html Notification Of Award For The Charter Hiring Of One (1) Floating Production, Storage And Offloading Vessel] | # [https://abarrelfull.blogspot.com/2023/11/notification-of-award-for-charter.html Notification Of Award For The Charter Hiring Of One (1) Floating Production, Storage And Offloading Vessel] | ||
| + | # [https://abarrelfull.blogspot.com/2023/11/sembcorp-marine-clinches-s400-million.html Sembcorp Marine Clinches S$400 Million New Contracts] | ||
| + | # [https://abarrelfull.blogspot.com/2023/11/completed-and-delivered-two-modules-to.html Completed and Delivered Two Modules to the 98/2 Project for Bumi Armada/SPOG] | ||
[[Category:FSPO]] | [[Category:FSPO]] | ||
[[Category:India]] | [[Category:India]] | ||
[[Category:Bumi Armada]] | [[Category:Bumi Armada]] | ||
Latest revision as of 07:56, 8 November 2023
Contents
Summary Information
- Name: Armada Sterling V FPSO
- Field: Cluster 2 Oil and Gas Fields
- Country: India
- Ownership: SPBAG: a 30:70 joint venture between Bumi Armada and Shapoorji Pallonji Oil & Gas
- Website:
- Field Operated By: ONGC
- Capacity: 90,000 bpd
- Year of Completion: 2022
Brief Description
- The vessel is a conversion of the Ariake, a very large crude carrier (VLCC)
- The vessel will produce up to 90,000 barrels of oil per day (BOPD) and have a 1.3-million-barrel storage facility.
Contractors
- Sembcorp Marine: Hull repairs and upgrading as well as fabrication of topside modules
- VME: 5 Topsides modules including:
- M40 Produced Water Treatment Module, M51 Seawater treatment Modules, M53 Chemical Injection Module, M54 Hydrocarbon Dewpoint and Gas Dehydration Modules, M90 Metering Laydown Module
Status
- In operation
History
- 2019 - SPBAG and ONGC sign 9-year contract for vessel
- 2019 - Sembcorp Marine awarded conversion contract
- 2022 - Vessel set sail for India
Other Information
- -