Difference between revisions of "Kumang Cluster Gas and Condensate Fields"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Petronas * Country: Malaysia * Location: Offshore Sarawak * Production start: * Partners: * Type: Gas & Condensate * Estimated Reserves: *...")
 
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Petronas  
 
* Operator: Petronas  
 
* Country: Malaysia
 
* Country: Malaysia
 
* Location: Offshore Sarawak
 
* Location: Offshore Sarawak
* Production start:  
+
* Production start: 2016
 
* Partners:  
 
* Partners:  
 
* Type: Gas & Condensate  
 
* Type: Gas & Condensate  
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The Kumang Cluster field located about 250km offshore Bintulu
 
* The Kumang Cluster field located about 250km offshore Bintulu
 
* Phase 1 consists of **F9**, **Kumang** and **Kanowit** fields.   
 
* Phase 1 consists of **F9**, **Kumang** and **Kanowit** fields.   
 
* It comprises a central processing platform (CPP) at Kanowit field (KAKG-A) and drilling platform for F9 (F9JT-A) and Kumang (KUJT-A).   
 
* It comprises a central processing platform (CPP) at Kanowit field (KAKG-A) and drilling platform for F9 (F9JT-A) and Kumang (KUJT-A).   
* Once installed, the Kumang Cluster facilities are able to supply gas to [[Malaysia FLNG Terminal]] in Bintulu.
+
* The Kumang Cluster facilities originally supplied gas to [[Malaysia Satu FLNG Terminal]] in Bintulu.
  
+++ Contractors
+
=== Contractors ===
 
* **Aker Solutions:**  
 
* **Aker Solutions:**  
* Supply subsea production system and services for the Kanowit field
+
** Supply subsea production system and services for the Kanowit field
* 5600 metres of subsea umbilicals that tie back the Kanowit subsea wells
+
** 5600 metres of subsea umbilicals that tie back the Kanowit subsea wells
 
* **Subsea 7:** Transportation and installation of subsea structures, 5km of umbilical cable, pipeline jumpers and electrical flying leads
 
* **Subsea 7:** Transportation and installation of subsea structures, 5km of umbilical cable, pipeline jumpers and electrical flying leads
 
* **MMCOG:** Provision of Conceptual Design and Engineering Services
 
* **MMCOG:** Provision of Conceptual Design and Engineering Services
 
* **Global Industries:** Pipeline installation
 
* **Global Industries:** Pipeline installation
 
* **Sime Darby Engineering:**  
 
* **Sime Darby Engineering:**  
* Fabrication, engineering, procurement, testing and pre-commissioning, load-out and sea fastening of the platform
+
** Fabrication, engineering, procurement, testing and pre-commissioning, load-out and sea fastening of the platform
* Procurement and construction of drilling platform topsides
+
** Procurement and construction of drilling platform topsides
 
* **Allied Marine & Equipment:** KAKG-A Jacket
 
* **Allied Marine & Equipment:** KAKG-A Jacket
* **Technip:** Procurement and installation of a 3.2 kilometers flexible flowline between the existing KAKG-A central processing platform in Kanowit field to the PFLNG1 riser. It also includes modification and tie-in works at KAKG-A
+
** **Technip:** Procurement and installation of a 3.2 kilometers flexible flowline between the existing KAKG-A central processing platform in Kanowit field to the PFLNG1 riser. It also includes modification and tie-in works at KAKG-A
  
+++ History
+
=== History ===
 
* 2005 - Kanowit field discovered
 
* 2005 - Kanowit field discovered
 
* 2008 - Sime Darby awarded platform contract
 
* 2008 - Sime Darby awarded platform contract
Line 34: Line 34:
 
* 2011 - Subsea 7 awarded subsea contract
 
* 2011 - Subsea 7 awarded subsea contract
 
* 2015 - Technip awarded contract to connect to FLNG
 
* 2015 - Technip awarded contract to connect to FLNG
 +
* 2016 - First gas produced
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[MMCOG Platform References]]
 
# [[MMCOG Platform References]]
 
# [[FoundOcean Subsea References]]
 
# [[FoundOcean Subsea References]]
Line 48: Line 49:
 
# [http://killajoules.wikidot.com/archive:subsea-7-wins-contract-for-petronas-carigali-in-mala Subsea 7 Wins Contract For Petronas Carigali In Malaysia]
 
# [http://killajoules.wikidot.com/archive:subsea-7-wins-contract-for-petronas-carigali-in-mala Subsea 7 Wins Contract For Petronas Carigali In Malaysia]
 
# [http://killajoules.wikidot.com/blog:5971 Technip awarded offshore brownfield and subsea tie-backs for PETRONAS FLNG1]
 
# [http://killajoules.wikidot.com/blog:5971 Technip awarded offshore brownfield and subsea tie-backs for PETRONAS FLNG1]
 +
# [https://abarrelfull.blogspot.com/2023/10/petronas-first-floating-lng-facility.html PETRONAS' First Floating LNG Facility, PFLNG Satu Sets Sail to Malaysia]
 +
 +
[[category:Field]]
 +
[[category:Malaysia]]
 +
[[category:Petronas]]

Latest revision as of 06:58, 26 October 2023

Summary Information

  • Operator: Petronas
  • Country: Malaysia
  • Location: Offshore Sarawak
  • Production start: 2016
  • Partners:
  • Type: Gas & Condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The Kumang Cluster field located about 250km offshore Bintulu
  • Phase 1 consists of **F9**, **Kumang** and **Kanowit** fields.
  • It comprises a central processing platform (CPP) at Kanowit field (KAKG-A) and drilling platform for F9 (F9JT-A) and Kumang (KUJT-A).
  • The Kumang Cluster facilities originally supplied gas to Malaysia Satu FLNG Terminal in Bintulu.

Contractors

  • **Aker Solutions:**
    • Supply subsea production system and services for the Kanowit field
    • 5600 metres of subsea umbilicals that tie back the Kanowit subsea wells
  • **Subsea 7:** Transportation and installation of subsea structures, 5km of umbilical cable, pipeline jumpers and electrical flying leads
  • **MMCOG:** Provision of Conceptual Design and Engineering Services
  • **Global Industries:** Pipeline installation
  • **Sime Darby Engineering:**
    • Fabrication, engineering, procurement, testing and pre-commissioning, load-out and sea fastening of the platform
    • Procurement and construction of drilling platform topsides
  • **Allied Marine & Equipment:** KAKG-A Jacket
    • **Technip:** Procurement and installation of a 3.2 kilometers flexible flowline between the existing KAKG-A central processing platform in Kanowit field to the PFLNG1 riser. It also includes modification and tie-in works at KAKG-A

History

  • 2005 - Kanowit field discovered
  • 2008 - Sime Darby awarded platform contract
  • 2010 - Aker awarded Kanowit contract
  • 2011 - Subsea 7 awarded subsea contract
  • 2015 - Technip awarded contract to connect to FLNG
  • 2016 - First gas produced

Geology

Links

  1. MMCOG Platform References
  2. FoundOcean Subsea References
  3. Serimax Asia Pipeline References
  4. Petronas Discovers Gas Offshore Sarawak
  5. Sime Darby Clinches Oil & Gas Contract Worth RM1 billion
  6. Petronas Carigali Awards RM2.8 Billion Worth Of Contracts To Local Fabricators
  7. Kanowit subsea project win
  8. Subsea 7 Wins Contract For Petronas Carigali In Malaysia
  9. Technip awarded offshore brownfield and subsea tie-backs for PETRONAS FLNG1
  10. PETRONAS' First Floating LNG Facility, PFLNG Satu Sets Sail to Malaysia