(Created page with " Hawthorn Pipeline Hawthorn Oil Transportation New Completed 2010 Q1 18 12 CRD 90,000 Carries crude from a rail facility in Stroud to Cushing (both in Oklahoma).  Key...")
 
 
(32 intermediate revisions by the same user not shown)
Line 1: Line 1:
Hawthorn Pipeline Hawthorn Oil Transportation New Completed 2010 Q1 18 12 CRD 90,000 Carries crude from a rail facility in Stroud to Cushing (both in Oklahoma).
+
# Hawthorn Pipeline Hawthorn Oil Transportation New Completed 2010 Q1 18 12 CRD 90,000 Carries crude from a rail facility in Stroud to Cushing (both in Oklahoma).
Keystone Pipeline TC Energy New Completed 2010 Q2 1,853 30 CRD 435,000 Goes from Hardisty in Alberta, Canada, down through Steele City, Nebraska, and to Patoka, Illinois.
+
# '''[[Keystone Pipeline]]'''
Freedom Pipeline Energy Transfer Partners New Completed 2011 Q3 43 8 HGL Y-grade 40,000 Connects LaGrange/Chisholm plant complex to West Texas Gateway pipeline.
+
#* TC Energy
Liberty Pipeline (NGL) Energy Transfer Partners New Completed 2011 Q3 93 12 HGL Y-grade 90,000 Provides connectivity between Freedom/Liberty Pipelines and fractionators at Mont Belvieu, Texas, and Sweeny, Texas.
+
#* New - Completed- Q2 - 2010
Sterling I expansion OneOK Expansion Completed 2011 Q4 HGL Propane, butanes 15,000 Installation of seven additional pump stations along the existing Sterling I natural gas liquids product distribution pipeline.
+
#* 1,853 miles, 30 inch
Mesa Pipeline System expansion Plains All American Expansion Completed 2011 Q3 80 CRD 420,000 Feeder for West Texas Gulf System and Basin Pipeline.
+
#* Crude - 435,000 bpd
White Cliffs Pipeline line 1 expansion SemGroup; Plains All American; Anadarko; Samedan Pipe Line Expansion Completed 2011 Q3 527 12 CRD 40,300 Capacity increased from 29,700 b/d to about 70,000 b/d.
+
#* Goes from Hardisty in Alberta, Canada, down through Steele City, Nebraska, and to Patoka, Illinois.
Keystone Pipeline Cushing extension TC Energy Expansion Completed 2011 Q1 298 CRD 156,000 Extended existing pipeline from Steele City, Nebraska, to Cushing, Oklahoma, and brought capacity of the entire system up to 591,000 b/d.
+
# Freedom Pipeline Energy Transfer Partners New Completed 2011 Q3 43 8 HGL Y-grade 40,000 Connects LaGrange/Chisholm plant complex to West Texas Gateway pipeline.
Overland Pass Pipeline expansion 1 Williams; OneOK Expansion Completed 2011 Q2 1,035 16, 14 HGL Y-grade 35,200 Pump stations added Q1 2010 and Q2 2011. Capacity increased from 109,800 b/d to 145,000 b/d.
+
# Liberty Pipeline (NGL) Energy Transfer Partners New Completed 2011 Q3 93 12 HGL Y-grade 90,000 Provides connectivity between Freedom/Liberty Pipelines and fractionators at Mont Belvieu, Texas, and Sweeny, Texas.
Seaway Pipeline reversal Enbridge; Enterprise Products Partners Reversal Completed 2012 Q2 500 30 CRD 150,000 Reversal of the existing Seaway Pipeline so that it now flows north to south.
+
# '''[[Sterling NGL Pipeline]]''' Pipeline I expansion
Justice NGL Pipeline Energy Transfer Partners New Completed 2012 Q4 127 20 HGL Y-grade 375,000 Provides connectivity between Freedom/Liberty Pipelines and West Texas Gateway Pipeline and fractionators at Mont Belvieu, Texas, and Sweeny, Texas.
+
#* OneOK
Ohio River Valley Pipeline EnLink New Completed 2012 200 8, 6 CRD 10,000 About 120 miles of 8-inch pipeline in Ohio (capacity 10,000 b/d) and about 80 miles of 6-inch pipeline in West Virginia (capacity 7,000 b/d).
+
#* Expansion - Completed - Q4 - 2011
Eagle Ford Joint Venture (JV) Pipeline Enterprise Products Partners; Plains All American New Completed 2012 175 CRD 300,000 Began partial service in the second half of 2012, with full service by the end of 2013. 140-mile segment from Gardenadale to Three Rivers and then on to Corpus Christi (all in Texas). A 35-mile segment goes from Three Rivers to Enterprise's Lyssy Station in Wilson County, Texas.
+
#* HGL - Propane, butanes - 15,000 bpd
Kinder Morgan Crude and Condensate (KMCC) Pipeline Kinder Morgan Conversion, Expansion Completed 2012 Q2 264 24, 12 CRD 300,000 Converted 109 miles of natural gas pipeline to flow liquids, and the rest was new pipeline. Initially originated in Dewitt county and went to Houston (both in Texas). The 27-mile (12-inch diameter) Sweeney Lateral came online in January 2014 and created a new endpoint at the Sweeney Refinery in Old Ocean, Texas. The 15-mile (24-inch diameter) Gonzales Extension came online in March 2014 and created a new origin in Gonzales County, Texas. The 30-mile (24-inch diameter) Helena Extension came online in September 2014 and created a new origin in Karnes County, Texas (which was connected to the Double Eagle Pipeline in 2015). The 10-mile (10-inch diameter) Marshall Lateral came online in December 2015 and extended the Gonzales County origin northeast into Gonzales County.
+
#* Installation of seven additional pump stations along the existing Sterling I natural gas liquids product distribution pipeline.
Roxpat (Roxanna-to-Patoka) conversion Marathon Pipeline (MPLX) Conversion Completed 2012 Q1 57 12 CRD 84,000 Converted from a refined product pipeline. Leased from a third party by MPLX.
+
# Mesa Pipeline System expansion Plains All American Expansion Completed 2011 Q3 80 CRD 420,000 Feeder for West Texas Gulf System and Basin Pipeline.
Romulus-to-Detroit Pipeline Marathon Pipeline (MPLX) New Completed 2012 Q4 17 16 CRD 180,000 Samaria-to-Detroit pipeline and Romulus-to-Detroit pipeline together make up the Detroit Crude System.
+
# '''[[White Cliffs Pipeline]]'''
Patoka-to-Catlettsburg Pipeline expansion Marathon Pipeline (MPLX) Expansion Completed 2012 406 24, 22 CRD 14,000 Capacity increased from 256,000 b/d to 270,000 b/d. 20-inch diameter from Patoka to Owensboro, Kentucky (140 miles), 24-inch diameter from Owensboro to Catlettsburg, Ohio (266 miles).
+
#* SemGroup; Plains All American; Anadarko; Samedan Pipe Line
Arbuckle I Pipeline expansion OneOK Expansion Completed 2012 Q2 440 16 HGL Y-grade 60,000 Capacity increased from 180,000 b/d to 240,000 b/d of unfractionated natural gas liquids as a result of additional pump stations.
+
#* line 1 expansion - Completed - Q3 - 2011
Great Salt Plains Pipeline Parnon Gathering New Completed 2012 Q4 115 8 CRD 20,000 Goes from Cherokee to Cushing (both Oklahoma).
+
#* 527 miles, 12 inch
Bakken North Project Plains All American New Completed 2012 Q4 80 12 CRD 50,000 New construction from Trenton, North Dakota, to Sheridan County, Montana, near the Montana-Saskatchewan border. Volumes are delivered to the existing Poplar Pipeline, which connects to the Wascana Pipeline in Saskatchewan. The Canadian Wascana Pipeline was reversed as part of this project so that crude volumes from the Bakken play are ultimately delivered to Regina in Saskatchewan.
+
#* Crude - 40,300 bpd
Basin Pipeline expansion 1 Plains All American Expansion Completed 2012 520 24, 22, 20 CRD 50,000 Segment from Wink/Hendrick Texas, to Midland, Texas, had its capacity increased from 144,000 b/d to 240,000 b/d. Segment from Colorado City, Texas, to Cushing, Oklahoma, had its capacity increased from 400,000 b/d to 450,000 b/d.
+
#* Capacity increased from 29,700 b/d to about 70,000 b/d.
Overland Pass Pipeline expansion 2 Williams; OneOK Expansion Completed 2012 Q3 1,035 16, 14 HGL Y-grade 30,000 Pump stations added in Q1 2012 and Q3 2012; capacity increased to 160,000 b/d and 175,000 b/d, respectively, up from 145,000 b/d.
+
# '''[[Keystone Pipeline]]'''
Texas Express Pipeline Anadarko; ArcLight; DCP Midstream; Enterprise Products Partners New Completed 2013 Q4 580 20 HGL Y-grade 280,000 Includes gathering system into Anadarko and Barnett basins. Captures volumes from Front Range and Mid-American Pipeline.
+
#* TC Energy
Sand Hills NGL Pipeline DCP Midstream; Enbridge; Phillips 66 New Completed 2013 Q2 720 20 HGL Y-grade 200,000 Natural gas liquids pipeline providing takeaway service from DCP Midstream, LLC and third-party plants in the Permian and the Eagle Ford to fractionation facilities along the Texas Gulf Coast and the Mont Belvieu market hub .
+
#* Cushing extension - Completed - Q1 - 2011
Southern Hills Pipeline DCP Midstream; Enbridge; Phillips 66 New Completed 2013 Q2 800 20–8 HGL Y-grade 150,000 Was still ramping up to full capacity in April 2014, as pump stations were being completed.
+
#* 298 miles, 30 inch
Seaway Pipeline expansion Enbridge; Enterprise Products Partners Expansion Completed 2013 Q1 500 30 CRD 250,000 Capacity increased fromm 150,000 b/d to 400,000 b/d as a result of pump station additions and other modifications.
+
#* Crude - 156,000 bpd
West Texas Gateway Pipeline Energy Transfer Partners New Completed 2013 Q1 570 16 HGL Y-grade 220,000 Originating in Winkler County, Texas, and terminating in Jackson County, Texas.
+
#* Extended existing pipeline from Steele City, Nebraska, to Cushing, Oklahoma, and brought capacity of the entire system up to 591,000 b/d.
Permian Express 1 Pipeline Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) New Completed 2013 Q2 CRD 90,000
+
# '''[[Overland Pass NGL Pipeline]]'''
Cajun-Sibon Phase I EnLink Expansion Completed 2013 Q4 139 12 HGL Y-grade 70,000
+
#* Williams; OneOK
Double Eagle Pipeline Kinder Morgan; Magellan New Completed 2013 Q2 194 16, 14, 12 CRD 100,000 140 miles of new (12-inch diameter) pipeline connected to 50 miles of existing (16- and 14-inch diameter) pipeline. Expandable to 150,000 b/d. One segment goes from Gardendale, Texas, to Three Rivers, Texas. Another segment goes from Three Rivers to northern Karnes County, Texas. A third segment goes from Three Rivers to Corpus Christi, Texas. A 10-mile (12-inch diameter) lateral was completed in Q1 2015 that connects the Double Eagle Pipeline to the Kinder Morgan Crude and Condensate (KMCC) Pipeline in Kernes County.
+
#* Expansion - Completed - Q2 - 2011
Longhorn Pipeline reversal and conversion Magellan Conversion, Reversal Completed 2013 Q2 450 18 CRD 225,000 Converted to crude from carrying refined products, and also reversed. Goes from Crane to Houston (both in Texas).
+
#* 1035 miles, 16 & 24 inch
Bakken NGL Pipeline OneOK New Completed 2013 Q2 600 12 HGL Y-grade 60,000
+
#* NGLs - 35,200 bpd
Sterling I conversion OneOK Conversion Completed 2013 Q4 HGL Propane, butanes, Y-grade Reconfiguration of Sterling I pipeline such that it can carry both mixed and purity natural gas liquids (instead of just purity products).
+
#* Pump stations added Q1 2010 and Q2 2011. Capacity increased from 109,800 b/d to 145,000 b/d.
Mississippian Lime Crude Oil Pipeline Project Plains All American New Completed 2013 Q3 135 CRD 175,000 Goes from Byron to Cushing (both in Oklahoma).
+
# '''[[Seaway Crude Oil Pipeline]]'''
Zydeco Pipeline reversal Shell Midstream Partners Reversal Completed 2013 Q4 350 24, 22, 20 CRD 360,000 Reversal of the 250,000 b/d Houston, Texas, to Port Neches, Texas, segment (20-inch diameter, 87 miles) so it now flows east. Reversal of the 360,000 b/d Port Neches, Texas, to Houma, Louisiana, segment (22-inch diameter, 213 miles) so it now flows east. The 260,000 b/d Houma to Saint James, Louisiana, segment (18-inch diameter, 48 miles) remained flowing north. Reversal of the 400,000 b/d Houma to Clovelly segment (24-inch diameter, 34 miles) so it now flows east. The 125,000 b/d segment from the offshore Boxer pipeline system to Houma (16-inch diameter) remained flowing north.
+
#* Enbridge; Enterprise Products Partners
 Overland Pass Pipeline expansion 3 Williams; OneOK Expansion Completed 2013 Q2 1,035 16, 14 HGL Y-grade 70,000 Capacity increased from 175,000 b/d to 245,000 b/d to accommodate Bakken NGL pipeline deliveries. Five pump stations added, with some in service during Q1 2013.
+
#* Reversal - Completed - Q2 - 2012
Front Range Pipeline Anandarko, DCP Midstream, Enterprise Products Partners (Front Range Pipeline JV) New Completed 2014 Q1 435 16 HGL Y-grade 150,000 Pipeline originates in Weld County, Colorado, and terminates in Skellytown, Texas. There, it can connect with the Mid-America Pipeline or the Texas Express Pipeline, with Mont Belvieu in Texas as the final destination for the natural gas plant liquid mix.
+
#* 500 miles, 30 inch
Bakken Oil Express (BOE) II Pipeline BOE Midstream New Completed 2014 Q3 38 16 CRD 165,000 Flows from Kildeer to a rail terminal west of Dickinson (both in North Dakota).
+
#* Crude - 150,000 bpd
Cline Shale Pipeline Centurion Pipeline New Completed 2014 Q2 91 12 CRD 75,000 Goes from near Barnhart to near Colorado City (both in Texas), where it connects to the Centurion and BridgeTex pipelines.
+
#* Reversal of the existing Seaway Pipeline so that it now flows north to south.
Southern Hills Pipeline expansion 1 DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2014 Q1 140 20–8 HGL Y-grade 25,000 Capacity increased from 150,000 b/d to 175,000 b/d.
+
# '''[[Justice NGL Pipeline]]'''
Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—Canada Enbridge Expansion Completed 2014 Q3 786 36 CRD 120,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought Canadian capacity up from 450,000 b/d to 570,000 b/d (north of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline).
+
#* Energy Transfer Partners
Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—United States Enbridge Expansion Completed 2014 Q3 323 36 CRD 120,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought U.S. capacity up from 450,000 b/d to 570,000 b/d (south of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline).
+
#* New - Completed - Q4 - 2012
Southern Access (Line 61) Upgrade Project expansion 1 Enbridge Expansion Completed 2014 Q3 454 42 CRD 160,000 Capacity increased from 400,000 b/d to 560,000 b/d as a result of additional pumping horsepower.
+
#* 127 miles, 20 inch
Flanagan South Pipeline Enbridge New Completed 2014 Q4 593 36 CRD 585,000 Goes from Enbridge's Flanagan Terminal near Pontiac, Illinois, to Cushing, Oklahoma.
+
#* NGLs - 375,000 bpd
Seaway Pipeline twin/loop Enbridge; Enterprise Products Partners Expansion Completed 2014 Q4 512 30 CRD 450,000 Construction of a loop/twin pipeline, mostly along the same route as the existing Seaway Pipeline.
+
#* Provides connectivity between Freedom/Liberty Pipelines and West Texas Gateway Pipeline and fractionators at Mont Belvieu, Texas, and Sweeny, Texas.
Mariner West conversion Energy Transfer Partners Conversion Completed 2014 Q1 350 10, 8 HGL Ethane 50,000 Converted from product pipeline to carry only HGL.
+
# Ohio River Valley Pipeline EnLink New Completed 2012 200 8, 6 CRD 10,000 About 120 miles of 8-inch pipeline in Ohio (capacity 10,000 b/d) and about 80 miles of 6-inch pipeline in West Virginia (capacity 7,000 b/d).
Rio Bravo Pipeline Energy Transfer Partners Conversion Completed 2014 Q3 84 CRD 100,000 Converted from natural gas.
+
# '''[[Eagle Ford JV Pipeline System]]'''
Mariner East 1 conversion Energy Transfer Partners Conversion Completed 2014 Q4 300 12, 8 HGL Ethane, propane 70,000 Converted products pipeline to carry only HGL. Initially delivered propane; began shipping ethane in Q1 2016. 51 miles of 12-inch line to connect 8-inch repurposed products line to Houston, Pennsylvania.
+
#* Enterprise Products Partners; Plains All American
Permian Express 1 expansion Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) Expansion Completed 2014 Q1 CRD 60,000 Capacity increased from 90,000 b/d to 150,000 b/d.
+
#* New - Completed - 2012
Cajun-Sibon Phase II EnLink Expansion Completed 2014 Q4 306 12 HGL Y-grade, butanes 50,000 Capacity increased from 70,000 b/d to 120,000 b/d as a result of adding pumps.
+
#* 175 miles
Appalachia to Texas Express (ATEX) Pipeline Enterprise Products Partners New Completed 2014 Q1 1,205 20, 16, 14 HGL Ethane 125,000 Includes 369 miles of new 20-inch pipe, with remainder composed of 14-inch repurposed TE Products Pipeline pipe.
+
#* Crude - 300,000 bpd
Mid-American Pipeline—Rocky Mountain expansion Enterprise Products Partners Expansion Completed 2014 Q2 264 16 HGL Y-grade 75,000 Capacity increased from 275,000 b/d to 350,000 b/d. Pipeline and pump modifications made to accommodate 10-year ship-or-pay commitments on Mid-American Pipeline to Hobbs, Texas.
+
#* Began partial service in the second half of 2012, with full service by the end of 2013. 140-mile segment from Gardendale to Three Rivers and then on to Corpus Christi (all in Texas). A 35-mile segment goes from Three Rivers to Enterprise's Lyssy Station in Wilson County, Texas.
Aegis Ethane Pipeline—Mont Belvieu to Beaumont Enterprise Products Partners New Completed 2014 Q3 60 20 HGL Ethane 360,000 Whole pipeline goes from Mont Belvieu, Texas, to Napoleonville, Louisiana. This is the first segment.
+
# Kinder Morgan Crude and Condensate (KMCC) Pipeline Kinder Morgan Conversion, Expansion Completed 2012 Q2 264 24, 12 CRD 300,000 Converted 109 miles of natural gas pipeline to flow liquids, and the rest was new pipeline. Initially originated in Dewitt county and went to Houston (both in Texas). The 27-mile (12-inch diameter) Sweeney Lateral came online in January 2014 and created a new endpoint at the Sweeney Refinery in Old Ocean, Texas. The 15-mile (24-inch diameter) Gonzales Extension came online in March 2014 and created a new origin in Gonzales County, Texas. The 30-mile (24-inch diameter) Helena Extension came online in September 2014 and created a new origin in Karnes County, Texas (which was connected to the Double Eagle Pipeline in 2015). The 10-mile (10-inch diameter) Marshall Lateral came online in December 2015 and extended the Gonzales County origin northeast into Gonzales County.
Cochin Reversal Project Kinder Morgan Expansion Completed 2014 Q3 1,900 12 HGL Natural gasoline 95,000 Reversed segment has capacity of 95,000 b/d. The full pipeline stretches from Alberta, Canada, through the United States, then back into Canada at the Michigan-Ontario border. The reversal was intially for only part of the pipeline, from Kankakee, Illinois to Fort Saskatchewan, Alberta, Canada. Later a short section to Saint Anne, Illinois was reactivated to allow for interconnect with MPLX, sourcing diluent from eastern Ohio through the Cornerstone project.
+
# Roxpat (Roxanna-to-Patoka) conversion Marathon Pipeline (MPLX) Conversion Completed 2012 Q1 57 12 CRD 84,000 Converted from a refined product pipeline. Leased from a third party by MPLX.
Longhorn Pipeline expansion Magellan Expansion Completed 2014 18 CRD 50,000 Capacity increased from 225,000 b/d to 275,000 b/d. New origin point added in Barnhart, Texas (in addition to the Crane, Texas, origin). Goes to Houston.
+
# Romulus-to-Detroit Pipeline Marathon Pipeline (MPLX) New Completed 2012 Q4 17 16 CRD 180,000 Samaria-to-Detroit pipeline and Romulus-to-Detroit pipeline together make up the Detroit Crude System.
BridgeTex Pipeline Magellan; Occidental Petroleum New Completed 2014 Q3 400 CRD 300,000 Goes from Colorado City to East Houston (both in Texas). Plains All American bought out Occidental's share of the project.
+
# Patoka-to-Catlettsburg Pipeline expansion Marathon Pipeline (MPLX) Expansion Completed 2012 406 24, 22 CRD 14,000 Capacity increased from 256,000 b/d to 270,000 b/d. 20-inch diameter from Patoka to Owensboro, Kentucky (140 miles), 24-inch diameter from Owensboro to Catlettsburg, Ohio (266 miles).
South Texas Crude Oil Pipeline System expansion phase 1 NuStar Expansion Completed 2014 Q2 CRD 35,000 Capacity increased from 240,000 b/d to 275,000 b/d between Gardendale and Corpus Christi (both in Texas).
+
# '''[[Arbuckle NGL Pipeline]]'''
OneOK ethane header interconnection OneOK New Completed 2014 Q2 285 12 HGL Ethane 40,000 A new interconnection point between OneOK's Mont Belvieu, Texas, natural gas liquid facilities and several customers in the region.
+
#* OneOK
Sterling III Pipeline OneOK New Completed 2014 Q2 550 16 HGL Y-grade 190,000
+
#* Expansion - Completed - Q2 - 2012 - Arbuckle I Pipeline expansion
Sterling II conversion OneOK Conversion Completed 2014 Q3 HGL Y-grade Reconfiguration of Sterling II pipeline such that it can carry both mixed and purity natural gas liquids (instead of just purity).
+
#* 440 miles, 16 inch
Bakken NGL Pipeline expansion OneOK Expansion Completed 2014 Q4 600 12 HGL Y-grade 75,000 Capacity increased from 60,000 b/d to 135,000 b/d through installation of additional pumping.
+
#* NGLs - 60,000 bpd
Mississippian Lime Crude Oil extension Plains All American Expansion Completed 2014 55 CRD 75,000 Extension of Mississippian Lime Pipeline, with capacity of 75,000 b/d, from Coldwater, Kansas, to Byron, Oklahoma.
+
#* Capacity increased from 180,000 b/d to 240,000 b/d of unfractionated natural gas liquids as a result of additional pump stations.
Wascana Pipeline reversal Plains Midstream Canada Reversal Completed 2014 Q2 107 12 CRD 40,000 Reversed the existing 40,000 b/d Wascana pipeline so that it flows north from the Saskatchewan-Montana border. Reversal done in coordination with the construction of the Bakken North Project, which connects to the Poplar Pipeline in Montana that in turn flows crude over the border onto the Wascana pipeline.
+
# '''[[Great Salt Plains Crude Oil Pipeline]]'''
White Cliffs Pipeline line 2 SemGroup Expansion Completed 2014 Q3 527 12 CRD 74,000 Addition of second, parallel pipeline brought toal capacity up to about 150,000 b/d from 76,000 b/d. SemGroup bought Rose Rock Midstream in 2016, and is now the project operator.
+
#* Parnon Gathering
Glass Mountain Pipeline SemGroup; Gavilon New Completed 2014 Q1 210 CRD 140,000 Flows from western Oklahoma to Cushing, Oklahoma.
+
#* New - Completed - Q4 -2012
Mars Pipeline expansion Shell Midstream Partners; BP Expansion Completed 2014 Q1 41 18, 16 CRD 100,000 New 100,000 b/d segment from Olympus platform to West Delta 143 platform (both in the Gulf of Mexico).
+
#* 115 miles, 8 inch
Granite Wash Extension Sunoco Logistics Partners New Completed 2014 Q4 200 12 CRD 70,000 Begins in Texas, goes through Oklahoma, then ends in Texas.
+
#* Crude - 20,000 bpd
Eaglebine Express Pipeline Sunoco Logistics Partners Conversion, Expansion, Reversal Completed 2014 12 CRD 60,000 Pipeline goes from Hearne to Aldine to Nederland (all in Texas). Pipeline is a conversion and reversal of the old MagTex (which carried refined petroleum products) product pipeline. The last five miles to Nederland are new construction.
+
#* Goes from Cherokee to Cushing (both Oklahoma) .
Pony Express Pipeline Tallgrass Energy Conversion, Expansion Completed 2014 760 CRD 320,000 Converted a natural gas pipeline and extended it. Capacity from Guernsey, Wyoming, to Sterling, Colorado, is 230,000 b/d. Capacity from Sterling, Colorado, to Cushing, Oklahoma is 320,000 b/d. Starting in 2015, the Colorado lateral (capacity 90,000 b/d)  interconnects with the main line at Sterling, Colorado.
+
# Bakken North Project Plains All American New Completed 2012 Q4 80 12 CRD 50,000 New construction from Trenton, North Dakota, to Sheridan County, Montana, near the Montana-Saskatchewan border. Volumes are delivered to the existing Poplar Pipeline, which connects to the Wascana Pipeline in Saskatchewan. The Canadian Wascana Pipeline was reversed as part of this project so that crude volumes from the Bakken play are ultimately delivered to Regina in Saskatchewan.
Keystone Gulf Coast Expansion TC Energy Expansion Completed 2014 Q2 485 36 CRD 700,000 Extension of Keystone Pipeline that goes from Cushing, Oklahoma, to refineries in Port Arthur, Texas. Expandable to 830,000 b/d.
+
# '''[[Basin Oil Pipeline]]'''
Vantage Pipeline Vantage Pipeline Canada New Completed 2014 Q2 435 10 HGL Ethane 40,000
+
#* Plains All American
 Sand Hills NGL Pipeline expansion 1 DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2015 Q2 180 20 HGL Y-grade 50,000 Capacity increased from 200,000 b/d to 250,000 b/d "by managing hydraulics and pressure flows in the pipeline". New laterals to Red Bluff Lake and Lea County (both in Texas).
+
#* Expansion - Completed - 2012
 Southern Access (Line 61) Upgrade Project expansion 2 Enbridge Expansion Completed 2015 Q2 454 42 CRD 240,000 Capacity increased from 560,000 b/d to 800,000 b/d.
+
#* 520 miles, 24,22 & 20 inch
 Alberta Clipper Pipeline (Line 67) pump upgrade phase 2—Canada Enbridge Expansion Completed 2015 Q3 786 36 CRD 230,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought Canadian capacity up from 570,000 b/d to 800,000 b/d (north of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline). Capacity is bassed on heavy crude; the total capacity can be almost 890,000 b/d if the pipeline is carrying light crude.
+
#* Crude - 50,000 bpd
 Alberta Clipper Pipeline (Line 67) pump upgrade phase 2—United States Enbridge Expansion Completed 2015 Q3 323 36 CRD 230,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought U.S. capacity up from 570,000 b/d to 800,000 b/d (south of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline). Capacity is bassed on heavy crude; the total capacity can be almost 890,000 b/d if the pipeline is carrying light crude.
+
#* Segment from Wink/Hendrick Texas, to Midland, Texas, had its capacity increased from 144,000 b/d to 240,000 b/d. Segment from Colorado City, Texas, to Cushing, Oklahoma, had its capacity increased from 400,000 b/d to 450,000 b/d.
 Southern Access (Line 61) Upgrade Project expansion 3 Enbridge Expansion Completed 2015 Q3 454 42 CRD 150,000 Capacity increased from 800,000 b/d to 950,000 b/d. There are plans to expand further to 1,200,000 b/d.
+
# '''[[Overland Pass NGL Pipeline]]'''
 Line 78 Chicago Connectivity Enbridge Expansion Completed 2015 Q4 81 36 CRD 570,000 Connects Flanagan, Illinois, terminal to Griffith, Indiana, terminal (the latter was formerly the beginning of Line 78).
+
#* Williams; OneOK Expansion
 Southern Access Pipeline extension Enbridge Expansion Completed 2015 Q4 167 24 CRD 300,000 Goes from Flanagan to a petroleum terminal hub near Patoka (both in Illinois).
+
#* Pipeline expansion 2 - Completed - Q3 - 2012
 Mariner South Pipeline Energy Transfer Partners New Completed 2015 Q2 62 16 HGL Propane, n-butane 200,000 Originating at the Lone Star terminal at Mont Belvieu and terminating at the Sunoco Logistics Nederland liquefied petroleum gas export terminal.
+
#* 1035 miles, 16 & 24 inch
 Permian Express 2 Pipeline Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) New Completed 2015 Q3 334 24, 20 CRD 230,000 Garden City, Texas, to Colorado City, Texas, segment has 20-inch diameter pipeline, Colorado City to Corsicana, Texas, has 24-inch diameter pipeline.
+
#* NGLs - 30,000 bpd
 Aegis Ethane Pipeline—Beaumont to Lake Charles Enterprise Products Partners New Completed 2015 Q3 48 20 HGL Ethane 360,000 Whole pipeline goes from Mont Belvieu, Texas, to Napoleonville, Louisiana. This is the second segment.
+
#* Pump stations added in Q1 2012 and Q3 2012; capacity increased to 160,000 b/d and 175,000 b/d, respectively, up from 145,000 b/d.
 Rancho II Pipeline Enterprise Products Partners New Completed 2015 Q3 88 36 CRD 1,000,000 Currently connects Enterprise's Midland-to-Sealy Pipeline and the converted Red Seminole Pipeline to the Enterprise Crude Houston (ECHO) terminal in Houston, Texas. Part of the Midland-to-ECHO pipeline system.
+
# '''[[Texas Express NGL Oil Pipeline]]'''
 Aegis Ethane Pipeline—Lake Charles to Napoleonville Enterprise Products Partners New Completed 2015 Q4 162 20 HGL Ethane 360,000 Whole pipeline goes from Mont Belvieu, Texas, to Napoleonville, Louisiana. This is the third and final segment.
+
#* Anadarko; ArcLight; DCP Midstream; Enterprise Products Partners
 Eagle Ford Joint Venture (JV) Pipeline expansion 1 Enterprise Products Partners; Plains All American Expansion Completed 2015 175 CRD 300,000 Capacity increased from 300,000 b/d to 600,000 b/d. Expansion included a 20-inch loop of the entire system, more pumping capacity, and a connection to the Cactus Pipeline in Gardendale, Texas.
+
#* New - Completed - Q4 - 2013
 Double H Pipeline Kinder Morgan New Completed 2015 Q1 511 CRD 84,000 Origins in both North Dakota and Montana.
+
#* 580 miles, 20 inch
 Thunder Creek NGL Pipeline Meritage Midstream New Completed 2015 Q2 108 8, 6 HGL Y-grade 15,000 The pipeline has a preliminary design capacity of 15,000 b/d (expandable to 30,000 b/d). The first 108-mile leg of the pipeline came into service in April 2015. This pipeline originates at the 50 Buttes Natural Gas Processing Complex near Gillette, Wyoming, and terminates at an interconnect with Phillips 66’s Powder River Pipeline near Douglas, Wyoming. The Phillips 66 Powder River Pipeline delivers natural gas liquids to Phillips 66’s fractionation and refining complex near Borger, Texas. The 50 Buttes Plant is owned by Thunder Creek Gas Services, LLC, also a wholly owned subsidiary of Meritage.
+
#* NGLs - 280,000 bpd
 South Texas Crude Oil Pipeline System expansion phase 2 NuStar Expansion Completed 2015 Q1 CRD 65,000 Capacity increased from 275,000 b/d to 340,000 b/d between Gardendale and Corpus Christi (both in Texas).
+
#* Includes gathering system into Anadarko and Barnett basins. Captures volumes from Front Range and Mid-American Pipeline.
 Hutchinson-to-Medford NGL Pipeline OneOK New Completed 2015 Q2 95 16 HGL Y-grade 120,000 95-mile natural gas liquid (NGL) pipeline between existing NGL fractionation at Hutchinson, Kansas, and Medford, Oklahoma.
+
# '''[[Sand Hills NGL Pipeline]]'''
 Cactus I Pipeline Plains All American New Completed 2015 Q2 298 20 CRD 250,000 Goes from McCamey to Gardendale (both in Texas).
+
#* DCP Midstream; Enbridge; Phillips 66
 Basin Pipeline expansion 2 Plains All American Expansion Completed 2015 24, 20 CRD 360,000 Mainline loop from Wink to Midland (both in Texas) looped with 24-inch diameter pipeline to bring total capacity from 240,000 b/d to 600,000 b/d.
+
#* New Completed - Q2 - 2013
 Pony Express Northeast Colorado lateral Tallgrass Energy Expansion Completed 2015 Q2 66 CRD 90,000 Goes from Weld County, Colorado, to Sterling, Colorado. This 90,000 b/d lateral joins the 230,000 b/d Pony Express Pipeline segment from Guernsey, Wyoming, to Sterling, where they both feed into the 320,000 b/d segment from Sterling to Cushing, Oklahoma.
+
#* 720 miles, 20 inch
 +
#* NGLs - 200,000 bpd
 +
#* Natural gas liquids pipeline providing takeaway service from DCP Midstream, LLC and third-party plants in the Permian and the Eagle Ford to fractionation facilities along the Texas Gulf Coast and the Mont Belvieu market hub.
 +
# '''[[Southern Hills Pipeline]]'''
 +
#* DCP Midstream; Enbridge; Phillips 66
 +
#* New - Completed - Q2 - 2013
 +
#* 800 miles - 20–8 inches - HGL - Y-grade - 150,000 bpd
 +
#* Was still ramping up to full capacity in April 2014, as pump stations were being completed.
 +
# '''[[Seaway Crude Oil Pipeline]]'''
 +
#* Seaway Pipeline expansion
 +
#* Enbridge; Enterprise Products Partners
 +
#* Expansion - Completed - Q1 - 2013
 +
#* 500 miles - 30 inches - Crude - 250,000 bpd
 +
#* Capacity increased from 150,000 b/d to 400,000 b/d as a result of pump station additions and other modifications.
 +
# '''[[Lone Star West Texas Gateway NGL Pipeline]]'''
 +
#* Energy Transfer Partners
 +
#* New Completed - Q1 - 2013
 +
#* 570 miles, 16 inch
 +
#* NGLs - 220,000 bpd
 +
#* Originating in Winkler County, Texas, and terminating in Jackson County, Texas.
 +
# Permian Express 1 Pipeline Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) New Completed 2013 Q2 CRD 90,000
 +
# '''[[Cajun-Sibon NGL Pipeline System]]''' - Phase I Expansion
 +
#* EnLink
 +
#* Expansion - Completed - Q4 - 2013
 +
#* 139 miles - 12 inches - HGL - Y-grade - 70,000 bpd
 +
# Double Eagle Pipeline Kinder Morgan; Magellan New Completed 2013 Q2 194 16, 14, 12 CRD 100,000 140 miles of new (12-inch diameter) pipeline connected to 50 miles of existing (16- and 14-inch diameter) pipeline. Expandable to 150,000 b/d. One segment goes from Gardendale, Texas, to Three Rivers, Texas. Another segment goes from Three Rivers to northern Karnes County, Texas. A third segment goes from Three Rivers to Corpus Christi, Texas. A 10-mile (12-inch diameter) lateral was completed in Q1 2015 that connects the Double Eagle Pipeline to the Kinder Morgan Crude and Condensate (KMCC) Pipeline in Kernes County.
 +
# Longhorn Pipeline reversal and conversion Magellan Conversion, Reversal Completed 2013 Q2 450 18 CRD 225,000 Converted to crude from carrying refined products, and also reversed. Goes from Crane to Houston (both in Texas).
 +
# [[Bakken NGL Pipeline]]
 +
#* OneOK
 +
#* New - Completed - Q2 - 2013
 +
#* 600 miles, 12 inch
 +
#* NGLs - 60,000 bpd
 +
# '''[[Sterling NGL Pipeline]]'''
 +
#* Sterling I conversion
 +
#* OneOK
 +
#* Conversion - Completed - Q4 - 2013
 +
#* HGL - Propane, butanes, Y-grade
 +
#* Reconfiguration of Sterling I pipeline such that it can carry both mixed and purity natural gas liquids (instead of just purity products).
 +
# Mississippian Lime Crude Oil Pipeline Project Plains All American New Completed 2013 Q3 135 CRD 175,000 Goes from Byron to Cushing (both in Oklahoma).
 +
# Zydeco Pipeline reversal Shell Midstream Partners Reversal Completed 2013 Q4 350 24, 22, 20 CRD 360,000 Reversal of the 250,000 b/d Houston, Texas, to Port Neches, Texas, segment (20-inch diameter, 87 miles) so it now flows east. Reversal of the 360,000 b/d Port Neches, Texas, to Houma, Louisiana, segment (22-inch diameter, 213 miles) so it now flows east. The 260,000 b/d Houma to Saint James, Louisiana, segment (18-inch diameter, 48 miles) remained flowing north. Reversal of the 400,000 b/d Houma to Clovelly segment (24-inch diameter, 34 miles) so it now flows east. The 125,000 b/d segment from the offshore Boxer pipeline system to Houma (16-inch diameter) remained flowing north.
 +
# '''[[Overland Pass NGL Pipeline]]'''
 +
#* Williams; OneOK
 +
#* Expansion - Completed - Q2 - 2013
 +
#* 1035 miles, 16 & 24 inch
 +
#* NGLs - 70,000 bpd
 +
#* Capacity increased from 175,000 b/d to 245,000 b/d to accommodate Bakken NGL pipeline deliveries. Five pump stations added, with some in service during Q1 2013.
 +
# '''[[Front Range NGL Pipeline]]'''
 +
#* Anadarko, DCP Midstream, Enterprise Products Partners (Front Range Pipeline JV)
 +
#* New - Completed - Q1 - 2014
 +
#* 435 miles, 16 inch
 +
#* NGLs - 150,000 bpd
 +
#* Pipeline originates in Weld County, Colorado, and terminates in Skellytown, Texas. There, it can connect with the Mid-America Pipeline or the Texas Express Pipeline, with Mont Belvieu in Texas as the final destination for the natural gas plant liquid mix.
 +
# Bakken Oil Express (BOE) II Pipeline BOE Midstream New Completed 2014 Q3 38 16 CRD 165,000 Flows from Kildeer to a rail terminal west of Dickinson (both in North Dakota).
 +
# '''[[Centurion Crude Oil Pipeline]]'''
 +
#* Cline Shale Pipeline - Centurion Pipeline
 +
#* New - Completed - 2014 - Q2
 +
#* 91 miles, 12 inches
 +
#* CRD - 75,000 bpd
 +
#* Goes from near Barnhart to near Colorado City (both in Texas), where it connects to the Centurion and BridgeTex pipelines.
 +
# '''[[Southern Hills Pipeline]]''' - expansion 1
 +
#* DCP Midstream; Enbridge; Phillips 66 Expansion
 +
#* Completed - Q4 - 2014
 +
#* 140 miles - 20–8 inches - HGL - Y-grade - 25,000 bpd
 +
#* Capacity increased from 150,000 b/d to 175,000 b/d.
 +
# Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—Canada Enbridge Expansion Completed 2014 Q3 786 36 CRD 120,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought Canadian capacity up from 450,000 b/d to 570,000 b/d (north of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline).
 +
# Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—United States Enbridge Expansion Completed 2014 Q3 323 36 CRD 120,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought U.S. capacity up from 450,000 b/d to 570,000 b/d (south of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline).
 +
# Southern Access (Line 61) Upgrade Project expansion 1 Enbridge Expansion Completed 2014 Q3 454 42 CRD 160,000 Capacity increased from 400,000 b/d to 560,000 b/d as a result of additional pumping horsepower.
 +
# Flanagan South Pipeline Enbridge New Completed 2014 Q4 593 36 CRD 585,000 Goes from Enbridge's Flanagan Terminal near Pontiac, Illinois, to Cushing, Oklahoma.
 +
# Seaway Pipeline twin/loop Enbridge; Enterprise Products Partners Expansion Completed 2014 Q4 512 30 CRD 450,000 Construction of a loop/twin pipeline, mostly along the same route as the existing Seaway Pipeline.
 +
# '''[[Mariner West NGL Pipeline]]'''
 +
#* Energy Transfer Partners
 +
#* Conversion - Completed - Q1 - 2014
 +
#* 350 miles 10, 8 inches - HGL - Ethane - 50,000 bpd
 +
#* Converted from product pipeline to carry only HGL.
 +
# Rio Bravo Pipeline Energy Transfer Partners Conversion Completed 2014 Q3 84 CRD 100,000 Converted from natural gas.
 +
# '''[[Mariner East NGL Pipeline]]'''
 +
#* Energy Transfer Partners
 +
#* Conversion Completed 2014 Q4
 +
#* 300 miles, 12, 8 inches, HGL- Ethane, propane - 70,000 bpd
 +
#* Converted products pipeline to carry only HGL. Initially delivered propane; began shipping ethane in Q1 2016. 51 miles of 12-inch line to connect 8-inch repurposed products line to Houston, Pennsylvania.
 +
# Permian Express 1 expansion Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) Expansion Completed 2014 Q1 CRD 60,000 Capacity increased from 90,000 b/d to 150,000 b/d.
 +
# '''[[Cajun-Sibon NGL Pipeline System]]''' - Phase II
 +
#* EnLink
 +
#* Expansion - Completed - Q4 - 2014
 +
#* 306 miles - 12 inches - HGL - Y-grade, butanes - 50,000 bpd
 +
#* Capacity increased from 70,000 b/d to 120,000 b/d as a result of adding pumps.
 +
# Appalachia to Texas Express (ATEX) Pipeline Enterprise Products Partners New Completed 2014 Q1 1,205 20, 16, 14 HGL Ethane 125,000 Includes 369 miles of new 20-inch pipe, with remainder composed of 14-inch repurposed TE Products Pipeline pipe.
 +
# Mid-American Pipeline—Rocky Mountain expansion Enterprise Products Partners Expansion Completed 2014 Q2 264 16 HGL Y-grade 75,000 Capacity increased from 275,000 b/d to 350,000 b/d. Pipeline and pump modifications made to accommodate 10-year ship-or-pay commitments on Mid-American Pipeline to Hobbs, Texas.
 +
# Aegis Ethane Pipeline—Mont Belvieu to Beaumont Enterprise Products Partners New Completed 2014 Q3 60 20 HGL Ethane 360,000 Whole pipeline goes from Mont Belvieu, Texas, to Napoleonville, Louisiana. This is the first segment.
 +
# '''[[Cochin Condensate Pipeline]]'''
 +
#* Cochin Reversal Project
 +
#* Kinder Morgan
 +
#* Expansion - Completed - Q3 - 2014
 +
#* 1,900 miles - 12 inches - HGL - Natural gasoline - 95,000 bpd
 +
#* Reversed segment has capacity of 95,000 b/d. The full pipeline stretches from Alberta, Canada, through the United States, then back into Canada at the Michigan-Ontario border. The reversal was intially for only part of the pipeline, from Kankakee, Illinois to Fort Saskatchewan, Alberta, Canada. Later a short section to Saint Anne, Illinois was reactivated to allow for interconnect with MPLX, sourcing diluent from eastern Ohio through the Cornerstone project.
 +
# Longhorn Pipeline expansion Magellan Expansion Completed 2014 18 CRD 50,000 Capacity increased from 225,000 b/d to 275,000 b/d. New origin point added in Barnhart, Texas (in addition to the Crane, Texas, origin). Goes to Houston.
 +
# '''[[BridgeTex Oil Pipeline]]'''
 +
#* Magellan; Occidental Petroleum
 +
#* New - Completed - Q3 - 2014
 +
#* 400 miles - Crude - 300,000 bpd
 +
#* Goes from Colorado City to East Houston (both in Texas). Plains All American bought out Occidental's share of the project.
 +
# South Texas Crude Oil Pipeline System expansion phase 1 NuStar Expansion Completed 2014 Q2 CRD 35,000 Capacity increased from 240,000 b/d to 275,000 b/d between Gardendale and Corpus Christi (both in Texas).
 +
# OneOK ethane header interconnection OneOK New Completed 2014 Q2 285 12 HGL Ethane 40,000 A new interconnection point between OneOK's Mont Belvieu, Texas, natural gas liquid facilities and several customers in the region.
 +
# '''[[Sterling NGL Pipeline]]'''
 +
#* Sterling III Pipeline
 +
#* OneOK
 +
#* New - Completed - Q2 - 2014
 +
#* 550 miles - 16 inches - HGL - Y-grade - 190,000 bpd
 +
# '''[[Sterling NGL Pipeline]]'''
 +
# Sterling II conversion
 +
#* OneOK
 +
#* Conversion - Completed - Q3 - 2014
 +
#* HGL - Y-grade
 +
#* Reconfiguration of Sterling II pipeline such that it can carry both mixed and purity natural gas liquids (instead of just purity).
 +
# '''[[Bakken NGL Pipeline]]'''
 +
#* OneOK
 +
#* Expansion - Completed - Q4 - 2014
 +
#* 600 miles, 12 inch
 +
#* NGLs - 75,000 bpd
 +
#* Capacity increased from 60,000 b/d to 135,000 b/d through installation of additional pumping.
 +
# Mississippian Lime Crude Oil extension Plains All American Expansion Completed 2014 55 CRD 75,000 Extension of Mississippian Lime Pipeline, with capacity of 75,000 b/d, from Coldwater, Kansas, to Byron, Oklahoma.
 +
# Wascana Pipeline reversal Plains Midstream Canada Reversal Completed 2014 Q2 107 12 CRD 40,000 Reversed the existing 40,000 b/d Wascana pipeline so that it flows north from the Saskatchewan-Montana border. Reversal done in coordination with the construction of the Bakken North Project, which connects to the Poplar Pipeline in Montana that in turn flows crude over the border onto the Wascana pipeline.
 +
# '''[[White Cliffs Pipeline]]'''
 +
#* SemGroup
 +
#* Expansion
 +
#* Completed
 +
#* 2014 Q3
 +
#* 527 12
 +
#* CRD
 +
#* 74,000
 +
#* Addition of second, parallel pipeline brought total capacity up to about 150,000 b/d from 76,000 b/d. SemGroup bought Rose Rock Midstream in 2016, and is now the project operator.
 +
# Glass Mountain Pipeline SemGroup; Gavilon New Completed 2014 Q1 210 CRD 140,000 Flows from western Oklahoma to Cushing, Oklahoma.
 +
# Mars Pipeline expansion Shell Midstream Partners; BP Expansion Completed 2014 Q1 41 18, 16 CRD 100,000 New 100,000 b/d segment from Olympus platform to West Delta 143 platform (both in the Gulf of Mexico).
 +
# Granite Wash Extension Sunoco Logistics Partners New Completed 2014 Q4 200 12 CRD 70,000 Begins in Texas, goes through Oklahoma, then ends in Texas.
 +
# '''[[Eaglebine Express Crude Oil Pipeline]]'''
 +
#* Sunoco Logistics Partners
 +
#* Conversion, Expansion, Reversal - Completed - 2014
 +
#* 12 inches, CRD - 60,000 bpd
 +
#* Pipeline goes from Hearne to Aldine to Nederland (all in Texas). Pipeline is a conversion and reversal of the old MagTex (which carried refined petroleum products) product pipeline. The last five miles to Nederland are new construction.
 +
# Pony Express Pipeline Tallgrass Energy Conversion, Expansion Completed 2014 760 CRD 320,000 Converted a natural gas pipeline and extended it. Capacity from Guernsey, Wyoming, to Sterling, Colorado, is 230,000 b/d. Capacity from Sterling, Colorado, to Cushing, Oklahoma is 320,000 b/d. Starting in 2015, the Colorado lateral (capacity 90,000 b/d)  interconnects with the main line at Sterling, Colorado.
 +
# Keystone Gulf Coast Expansion TC Energy Expansion Completed 2014 Q2 485 36 CRD 700,000 Extension of Keystone Pipeline that goes from Cushing, Oklahoma, to refineries in Port Arthur, Texas. Expandable to 830,000 b/d.
 +
# Vantage Pipeline Vantage Pipeline Canada New Completed 2014 Q2 435 10 HGL Ethane 40,000

Latest revision as of 07:34, 28 May 2024

  1. Hawthorn Pipeline Hawthorn Oil Transportation New Completed 2010 Q1 18 12 CRD 90,000 Carries crude from a rail facility in Stroud to Cushing (both in Oklahoma).
  2. Keystone Pipeline
    • TC Energy
    • New - Completed- Q2 - 2010
    • 1,853 miles, 30 inch
    • Crude - 435,000 bpd
    • Goes from Hardisty in Alberta, Canada, down through Steele City, Nebraska, and to Patoka, Illinois.
  3. Freedom Pipeline Energy Transfer Partners New Completed 2011 Q3 43 8 HGL Y-grade 40,000 Connects LaGrange/Chisholm plant complex to West Texas Gateway pipeline.
  4. Liberty Pipeline (NGL) Energy Transfer Partners New Completed 2011 Q3 93 12 HGL Y-grade 90,000 Provides connectivity between Freedom/Liberty Pipelines and fractionators at Mont Belvieu, Texas, and Sweeny, Texas.
  5. Sterling NGL Pipeline Pipeline I expansion
    • OneOK
    • Expansion - Completed - Q4 - 2011
    • HGL - Propane, butanes - 15,000 bpd
    • Installation of seven additional pump stations along the existing Sterling I natural gas liquids product distribution pipeline.
  6. Mesa Pipeline System expansion Plains All American Expansion Completed 2011 Q3 80 CRD 420,000 Feeder for West Texas Gulf System and Basin Pipeline.
  7. White Cliffs Pipeline
    • SemGroup; Plains All American; Anadarko; Samedan Pipe Line
    • line 1 expansion - Completed - Q3 - 2011
    • 527 miles, 12 inch
    • Crude - 40,300 bpd
    • Capacity increased from 29,700 b/d to about 70,000 b/d.
  8. Keystone Pipeline
    • TC Energy
    • Cushing extension - Completed - Q1 - 2011
    • 298 miles, 30 inch
    • Crude - 156,000 bpd
    • Extended existing pipeline from Steele City, Nebraska, to Cushing, Oklahoma, and brought capacity of the entire system up to 591,000 b/d.
  9. Overland Pass NGL Pipeline
    • Williams; OneOK
    • Expansion - Completed - Q2 - 2011
    • 1035 miles, 16 & 24 inch
    • NGLs - 35,200 bpd
    • Pump stations added Q1 2010 and Q2 2011. Capacity increased from 109,800 b/d to 145,000 b/d.
  10. Seaway Crude Oil Pipeline
    • Enbridge; Enterprise Products Partners
    • Reversal - Completed - Q2 - 2012
    • 500 miles, 30 inch
    • Crude - 150,000 bpd
    • Reversal of the existing Seaway Pipeline so that it now flows north to south.
  11. Justice NGL Pipeline
    • Energy Transfer Partners
    • New - Completed - Q4 - 2012
    • 127 miles, 20 inch
    • NGLs - 375,000 bpd
    • Provides connectivity between Freedom/Liberty Pipelines and West Texas Gateway Pipeline and fractionators at Mont Belvieu, Texas, and Sweeny, Texas.
  12. Ohio River Valley Pipeline EnLink New Completed 2012 200 8, 6 CRD 10,000 About 120 miles of 8-inch pipeline in Ohio (capacity 10,000 b/d) and about 80 miles of 6-inch pipeline in West Virginia (capacity 7,000 b/d).
  13. Eagle Ford JV Pipeline System
    • Enterprise Products Partners; Plains All American
    • New - Completed - 2012
    • 175 miles
    • Crude - 300,000 bpd
    • Began partial service in the second half of 2012, with full service by the end of 2013. 140-mile segment from Gardendale to Three Rivers and then on to Corpus Christi (all in Texas). A 35-mile segment goes from Three Rivers to Enterprise's Lyssy Station in Wilson County, Texas.
  14. Kinder Morgan Crude and Condensate (KMCC) Pipeline Kinder Morgan Conversion, Expansion Completed 2012 Q2 264 24, 12 CRD 300,000 Converted 109 miles of natural gas pipeline to flow liquids, and the rest was new pipeline. Initially originated in Dewitt county and went to Houston (both in Texas). The 27-mile (12-inch diameter) Sweeney Lateral came online in January 2014 and created a new endpoint at the Sweeney Refinery in Old Ocean, Texas. The 15-mile (24-inch diameter) Gonzales Extension came online in March 2014 and created a new origin in Gonzales County, Texas. The 30-mile (24-inch diameter) Helena Extension came online in September 2014 and created a new origin in Karnes County, Texas (which was connected to the Double Eagle Pipeline in 2015). The 10-mile (10-inch diameter) Marshall Lateral came online in December 2015 and extended the Gonzales County origin northeast into Gonzales County.
  15. Roxpat (Roxanna-to-Patoka) conversion Marathon Pipeline (MPLX) Conversion Completed 2012 Q1 57 12 CRD 84,000 Converted from a refined product pipeline. Leased from a third party by MPLX.
  16. Romulus-to-Detroit Pipeline Marathon Pipeline (MPLX) New Completed 2012 Q4 17 16 CRD 180,000 Samaria-to-Detroit pipeline and Romulus-to-Detroit pipeline together make up the Detroit Crude System.
  17. Patoka-to-Catlettsburg Pipeline expansion Marathon Pipeline (MPLX) Expansion Completed 2012 406 24, 22 CRD 14,000 Capacity increased from 256,000 b/d to 270,000 b/d. 20-inch diameter from Patoka to Owensboro, Kentucky (140 miles), 24-inch diameter from Owensboro to Catlettsburg, Ohio (266 miles).
  18. Arbuckle NGL Pipeline
    • OneOK
    • Expansion - Completed - Q2 - 2012 - Arbuckle I Pipeline expansion
    • 440 miles, 16 inch
    • NGLs - 60,000 bpd
    • Capacity increased from 180,000 b/d to 240,000 b/d of unfractionated natural gas liquids as a result of additional pump stations.
  19. Great Salt Plains Crude Oil Pipeline
    • Parnon Gathering
    • New - Completed - Q4 -2012
    • 115 miles, 8 inch
    • Crude - 20,000 bpd
    • Goes from Cherokee to Cushing (both Oklahoma) .
  20. Bakken North Project Plains All American New Completed 2012 Q4 80 12 CRD 50,000 New construction from Trenton, North Dakota, to Sheridan County, Montana, near the Montana-Saskatchewan border. Volumes are delivered to the existing Poplar Pipeline, which connects to the Wascana Pipeline in Saskatchewan. The Canadian Wascana Pipeline was reversed as part of this project so that crude volumes from the Bakken play are ultimately delivered to Regina in Saskatchewan.
  21. Basin Oil Pipeline
    • Plains All American
    • Expansion - Completed - 2012
    • 520 miles, 24,22 & 20 inch
    • Crude - 50,000 bpd
    • Segment from Wink/Hendrick Texas, to Midland, Texas, had its capacity increased from 144,000 b/d to 240,000 b/d. Segment from Colorado City, Texas, to Cushing, Oklahoma, had its capacity increased from 400,000 b/d to 450,000 b/d.
  22. Overland Pass NGL Pipeline
    • Williams; OneOK Expansion
    • Pipeline expansion 2 - Completed - Q3 - 2012
    • 1035 miles, 16 & 24 inch
    • NGLs - 30,000 bpd
    • Pump stations added in Q1 2012 and Q3 2012; capacity increased to 160,000 b/d and 175,000 b/d, respectively, up from 145,000 b/d.
  23. Texas Express NGL Oil Pipeline
    • Anadarko; ArcLight; DCP Midstream; Enterprise Products Partners
    • New - Completed - Q4 - 2013
    • 580 miles, 20 inch
    • NGLs - 280,000 bpd
    • Includes gathering system into Anadarko and Barnett basins. Captures volumes from Front Range and Mid-American Pipeline.
  24. Sand Hills NGL Pipeline
    • DCP Midstream; Enbridge; Phillips 66
    • New Completed - Q2 - 2013
    • 720 miles, 20 inch
    • NGLs - 200,000 bpd
    • Natural gas liquids pipeline providing takeaway service from DCP Midstream, LLC and third-party plants in the Permian and the Eagle Ford to fractionation facilities along the Texas Gulf Coast and the Mont Belvieu market hub.
  25. Southern Hills Pipeline
    • DCP Midstream; Enbridge; Phillips 66
    • New - Completed - Q2 - 2013
    • 800 miles - 20–8 inches - HGL - Y-grade - 150,000 bpd
    • Was still ramping up to full capacity in April 2014, as pump stations were being completed.
  26. Seaway Crude Oil Pipeline
    • Seaway Pipeline expansion
    • Enbridge; Enterprise Products Partners
    • Expansion - Completed - Q1 - 2013
    • 500 miles - 30 inches - Crude - 250,000 bpd
    • Capacity increased from 150,000 b/d to 400,000 b/d as a result of pump station additions and other modifications.
  27. Lone Star West Texas Gateway NGL Pipeline
    • Energy Transfer Partners
    • New Completed - Q1 - 2013
    • 570 miles, 16 inch
    • NGLs - 220,000 bpd
    • Originating in Winkler County, Texas, and terminating in Jackson County, Texas.
  28. Permian Express 1 Pipeline Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) New Completed 2013 Q2 CRD 90,000
  29. Cajun-Sibon NGL Pipeline System - Phase I Expansion
    • EnLink
    • Expansion - Completed - Q4 - 2013
    • 139 miles - 12 inches - HGL - Y-grade - 70,000 bpd
  30. Double Eagle Pipeline Kinder Morgan; Magellan New Completed 2013 Q2 194 16, 14, 12 CRD 100,000 140 miles of new (12-inch diameter) pipeline connected to 50 miles of existing (16- and 14-inch diameter) pipeline. Expandable to 150,000 b/d. One segment goes from Gardendale, Texas, to Three Rivers, Texas. Another segment goes from Three Rivers to northern Karnes County, Texas. A third segment goes from Three Rivers to Corpus Christi, Texas. A 10-mile (12-inch diameter) lateral was completed in Q1 2015 that connects the Double Eagle Pipeline to the Kinder Morgan Crude and Condensate (KMCC) Pipeline in Kernes County.
  31. Longhorn Pipeline reversal and conversion Magellan Conversion, Reversal Completed 2013 Q2 450 18 CRD 225,000 Converted to crude from carrying refined products, and also reversed. Goes from Crane to Houston (both in Texas).
  32. Bakken NGL Pipeline
    • OneOK
    • New - Completed - Q2 - 2013
    • 600 miles, 12 inch
    • NGLs - 60,000 bpd
  33. Sterling NGL Pipeline
    • Sterling I conversion
    • OneOK
    • Conversion - Completed - Q4 - 2013
    • HGL - Propane, butanes, Y-grade
    • Reconfiguration of Sterling I pipeline such that it can carry both mixed and purity natural gas liquids (instead of just purity products).
  34. Mississippian Lime Crude Oil Pipeline Project Plains All American New Completed 2013 Q3 135 CRD 175,000 Goes from Byron to Cushing (both in Oklahoma).
  35. Zydeco Pipeline reversal Shell Midstream Partners Reversal Completed 2013 Q4 350 24, 22, 20 CRD 360,000 Reversal of the 250,000 b/d Houston, Texas, to Port Neches, Texas, segment (20-inch diameter, 87 miles) so it now flows east. Reversal of the 360,000 b/d Port Neches, Texas, to Houma, Louisiana, segment (22-inch diameter, 213 miles) so it now flows east. The 260,000 b/d Houma to Saint James, Louisiana, segment (18-inch diameter, 48 miles) remained flowing north. Reversal of the 400,000 b/d Houma to Clovelly segment (24-inch diameter, 34 miles) so it now flows east. The 125,000 b/d segment from the offshore Boxer pipeline system to Houma (16-inch diameter) remained flowing north.
  36. Overland Pass NGL Pipeline
    • Williams; OneOK
    • Expansion - Completed - Q2 - 2013
    • 1035 miles, 16 & 24 inch
    • NGLs - 70,000 bpd
    • Capacity increased from 175,000 b/d to 245,000 b/d to accommodate Bakken NGL pipeline deliveries. Five pump stations added, with some in service during Q1 2013.
  37. Front Range NGL Pipeline
    • Anadarko, DCP Midstream, Enterprise Products Partners (Front Range Pipeline JV)
    • New - Completed - Q1 - 2014
    • 435 miles, 16 inch
    • NGLs - 150,000 bpd
    • Pipeline originates in Weld County, Colorado, and terminates in Skellytown, Texas. There, it can connect with the Mid-America Pipeline or the Texas Express Pipeline, with Mont Belvieu in Texas as the final destination for the natural gas plant liquid mix.
  38. Bakken Oil Express (BOE) II Pipeline BOE Midstream New Completed 2014 Q3 38 16 CRD 165,000 Flows from Kildeer to a rail terminal west of Dickinson (both in North Dakota).
  39. Centurion Crude Oil Pipeline
    • Cline Shale Pipeline - Centurion Pipeline
    • New - Completed - 2014 - Q2
    • 91 miles, 12 inches
    • CRD - 75,000 bpd
    • Goes from near Barnhart to near Colorado City (both in Texas), where it connects to the Centurion and BridgeTex pipelines.
  40. Southern Hills Pipeline - expansion 1
    • DCP Midstream; Enbridge; Phillips 66 Expansion
    • Completed - Q4 - 2014
    • 140 miles - 20–8 inches - HGL - Y-grade - 25,000 bpd
    • Capacity increased from 150,000 b/d to 175,000 b/d.
  41. Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—Canada Enbridge Expansion Completed 2014 Q3 786 36 CRD 120,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought Canadian capacity up from 450,000 b/d to 570,000 b/d (north of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline).
  42. Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—United States Enbridge Expansion Completed 2014 Q3 323 36 CRD 120,000 Line 67 goes from Alberta, Canada to Wisconsin. Upgrading of pumps brought U.S. capacity up from 450,000 b/d to 570,000 b/d (south of the 3-mile segment in North Dakota that connects the U.S. and Canadian pipeline).
  43. Southern Access (Line 61) Upgrade Project expansion 1 Enbridge Expansion Completed 2014 Q3 454 42 CRD 160,000 Capacity increased from 400,000 b/d to 560,000 b/d as a result of additional pumping horsepower.
  44. Flanagan South Pipeline Enbridge New Completed 2014 Q4 593 36 CRD 585,000 Goes from Enbridge's Flanagan Terminal near Pontiac, Illinois, to Cushing, Oklahoma.
  45. Seaway Pipeline twin/loop Enbridge; Enterprise Products Partners Expansion Completed 2014 Q4 512 30 CRD 450,000 Construction of a loop/twin pipeline, mostly along the same route as the existing Seaway Pipeline.
  46. Mariner West NGL Pipeline
    • Energy Transfer Partners
    • Conversion - Completed - Q1 - 2014
    • 350 miles 10, 8 inches - HGL - Ethane - 50,000 bpd
    • Converted from product pipeline to carry only HGL.
  47. Rio Bravo Pipeline Energy Transfer Partners Conversion Completed 2014 Q3 84 CRD 100,000 Converted from natural gas.
  48. Mariner East NGL Pipeline
    • Energy Transfer Partners
    • Conversion Completed 2014 Q4
    • 300 miles, 12, 8 inches, HGL- Ethane, propane - 70,000 bpd
    • Converted products pipeline to carry only HGL. Initially delivered propane; began shipping ethane in Q1 2016. 51 miles of 12-inch line to connect 8-inch repurposed products line to Houston, Pennsylvania.
  49. Permian Express 1 expansion Energy Transfer Partners, ExxonMobil (Permian Express Partners JV) Expansion Completed 2014 Q1 CRD 60,000 Capacity increased from 90,000 b/d to 150,000 b/d.
  50. Cajun-Sibon NGL Pipeline System - Phase II
    • EnLink
    • Expansion - Completed - Q4 - 2014
    • 306 miles - 12 inches - HGL - Y-grade, butanes - 50,000 bpd
    • Capacity increased from 70,000 b/d to 120,000 b/d as a result of adding pumps.
  51. Appalachia to Texas Express (ATEX) Pipeline Enterprise Products Partners New Completed 2014 Q1 1,205 20, 16, 14 HGL Ethane 125,000 Includes 369 miles of new 20-inch pipe, with remainder composed of 14-inch repurposed TE Products Pipeline pipe.
  52. Mid-American Pipeline—Rocky Mountain expansion Enterprise Products Partners Expansion Completed 2014 Q2 264 16 HGL Y-grade 75,000 Capacity increased from 275,000 b/d to 350,000 b/d. Pipeline and pump modifications made to accommodate 10-year ship-or-pay commitments on Mid-American Pipeline to Hobbs, Texas.
  53. Aegis Ethane Pipeline—Mont Belvieu to Beaumont Enterprise Products Partners New Completed 2014 Q3 60 20 HGL Ethane 360,000 Whole pipeline goes from Mont Belvieu, Texas, to Napoleonville, Louisiana. This is the first segment.
  54. Cochin Condensate Pipeline
    • Cochin Reversal Project
    • Kinder Morgan
    • Expansion - Completed - Q3 - 2014
    • 1,900 miles - 12 inches - HGL - Natural gasoline - 95,000 bpd
    • Reversed segment has capacity of 95,000 b/d. The full pipeline stretches from Alberta, Canada, through the United States, then back into Canada at the Michigan-Ontario border. The reversal was intially for only part of the pipeline, from Kankakee, Illinois to Fort Saskatchewan, Alberta, Canada. Later a short section to Saint Anne, Illinois was reactivated to allow for interconnect with MPLX, sourcing diluent from eastern Ohio through the Cornerstone project.
  55. Longhorn Pipeline expansion Magellan Expansion Completed 2014 18 CRD 50,000 Capacity increased from 225,000 b/d to 275,000 b/d. New origin point added in Barnhart, Texas (in addition to the Crane, Texas, origin). Goes to Houston.
  56. BridgeTex Oil Pipeline
    • Magellan; Occidental Petroleum
    • New - Completed - Q3 - 2014
    • 400 miles - Crude - 300,000 bpd
    • Goes from Colorado City to East Houston (both in Texas). Plains All American bought out Occidental's share of the project.
  57. South Texas Crude Oil Pipeline System expansion phase 1 NuStar Expansion Completed 2014 Q2 CRD 35,000 Capacity increased from 240,000 b/d to 275,000 b/d between Gardendale and Corpus Christi (both in Texas).
  58. OneOK ethane header interconnection OneOK New Completed 2014 Q2 285 12 HGL Ethane 40,000 A new interconnection point between OneOK's Mont Belvieu, Texas, natural gas liquid facilities and several customers in the region.
  59. Sterling NGL Pipeline
    • Sterling III Pipeline
    • OneOK
    • New - Completed - Q2 - 2014
    • 550 miles - 16 inches - HGL - Y-grade - 190,000 bpd
  60. Sterling NGL Pipeline
  61. Sterling II conversion
    • OneOK
    • Conversion - Completed - Q3 - 2014
    • HGL - Y-grade
    • Reconfiguration of Sterling II pipeline such that it can carry both mixed and purity natural gas liquids (instead of just purity).
  62. Bakken NGL Pipeline
    • OneOK
    • Expansion - Completed - Q4 - 2014
    • 600 miles, 12 inch
    • NGLs - 75,000 bpd
    • Capacity increased from 60,000 b/d to 135,000 b/d through installation of additional pumping.
  63. Mississippian Lime Crude Oil extension Plains All American Expansion Completed 2014 55 CRD 75,000 Extension of Mississippian Lime Pipeline, with capacity of 75,000 b/d, from Coldwater, Kansas, to Byron, Oklahoma.
  64. Wascana Pipeline reversal Plains Midstream Canada Reversal Completed 2014 Q2 107 12 CRD 40,000 Reversed the existing 40,000 b/d Wascana pipeline so that it flows north from the Saskatchewan-Montana border. Reversal done in coordination with the construction of the Bakken North Project, which connects to the Poplar Pipeline in Montana that in turn flows crude over the border onto the Wascana pipeline.
  65. White Cliffs Pipeline
    • SemGroup
    • Expansion
    • Completed
    • 2014 Q3
    • 527 12
    • CRD
    • 74,000
    • Addition of second, parallel pipeline brought total capacity up to about 150,000 b/d from 76,000 b/d. SemGroup bought Rose Rock Midstream in 2016, and is now the project operator.
  66. Glass Mountain Pipeline SemGroup; Gavilon New Completed 2014 Q1 210 CRD 140,000 Flows from western Oklahoma to Cushing, Oklahoma.
  67. Mars Pipeline expansion Shell Midstream Partners; BP Expansion Completed 2014 Q1 41 18, 16 CRD 100,000 New 100,000 b/d segment from Olympus platform to West Delta 143 platform (both in the Gulf of Mexico).
  68. Granite Wash Extension Sunoco Logistics Partners New Completed 2014 Q4 200 12 CRD 70,000 Begins in Texas, goes through Oklahoma, then ends in Texas.
  69. Eaglebine Express Crude Oil Pipeline
    • Sunoco Logistics Partners
    • Conversion, Expansion, Reversal - Completed - 2014
    • 12 inches, CRD - 60,000 bpd
    • Pipeline goes from Hearne to Aldine to Nederland (all in Texas). Pipeline is a conversion and reversal of the old MagTex (which carried refined petroleum products) product pipeline. The last five miles to Nederland are new construction.
  70. Pony Express Pipeline Tallgrass Energy Conversion, Expansion Completed 2014 760 CRD 320,000 Converted a natural gas pipeline and extended it. Capacity from Guernsey, Wyoming, to Sterling, Colorado, is 230,000 b/d. Capacity from Sterling, Colorado, to Cushing, Oklahoma is 320,000 b/d. Starting in 2015, the Colorado lateral (capacity 90,000 b/d) interconnects with the main line at Sterling, Colorado.
  71. Keystone Gulf Coast Expansion TC Energy Expansion Completed 2014 Q2 485 36 CRD 700,000 Extension of Keystone Pipeline that goes from Cushing, Oklahoma, to refineries in Port Arthur, Texas. Expandable to 830,000 b/d.
  72. Vantage Pipeline Vantage Pipeline Canada New Completed 2014 Q2 435 10 HGL Ethane 40,000