Difference between revisions of "TransColorado Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: * Destination: * Ownership: Kinder Morgan * Website: http://www.kindermorgan.com/ * Length: kilometres (300 miles) * Capacity: per day *...") |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
+++ Details | +++ Details | ||
* TransColorado Gas Transmission is a 300 mile natural gas pipeline system that extends from the Greasewood area pipeline interconnects in Rio Blanco County, Colorado, to a point of interconnection with [[El Paso Natural Gas Pipeline]], Transwestern and Southern Trails interstate pipelines at the [[Blanco Natural Gas Hub]] located in San Juan County, New Mexico. | * TransColorado Gas Transmission is a 300 mile natural gas pipeline system that extends from the Greasewood area pipeline interconnects in Rio Blanco County, Colorado, to a point of interconnection with [[El Paso Natural Gas Pipeline]], Transwestern and Southern Trails interstate pipelines at the [[Blanco Natural Gas Hub]] located in San Juan County, New Mexico. | ||
− | * The pipeline is connected to the [[White River Natural Gas Hub]] and [[ | + | * The pipeline is connected to the [[White River Natural Gas Hub]] and [[Transwestern Gas Pipeline]] |
+++ Contractors | +++ Contractors |
Latest revision as of 13:44, 16 August 2024
Summary Information
- Source:
- Destination:
- Ownership: Kinder Morgan
- Website: http://www.kindermorgan.com/
- Length: kilometres (300 miles)
- Capacity: per day
- Status: Operating
+++ Details
- TransColorado Gas Transmission is a 300 mile natural gas pipeline system that extends from the Greasewood area pipeline interconnects in Rio Blanco County, Colorado, to a point of interconnection with El Paso Natural Gas Pipeline, Transwestern and Southern Trails interstate pipelines at the Blanco Natural Gas Hub located in San Juan County, New Mexico.
- The pipeline is connected to the White River Natural Gas Hub and Transwestern Gas Pipeline
+++ Contractors
- **UniversalPegasus:** Route selection, preliminary and as-‐built survey, engineering design, drafting, material procurement, project management, construction management, inspection, and start-‐up assistance services
+++ History
- 1996 - Pipeline Expansion completed
- 1999 - Dark Canyon & Northern Pipeline Expansion completed
- 2004 - System expansion completed
- 2006 - North Expansion Project completed
- 2007 - Blanco-to-Meeker Expansion completed
- 2008 - Connection opened to the White River Natural Gas Hub
+++ Other Information
- -
+++ Links