Difference between revisions of "Los Ramones Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Source: * Destination: Mexico * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: Under Construction +++ Details...")
 
 
Line 1: Line 1:
 
Summary Information
 
Summary Information
  
* Source:  
+
* Source: Texas
 
* Destination: Mexico
 
* Destination: Mexico
 
* Ownership:  
 
* Ownership:  
 +
** Phase 1: PEMEX and Sempra
 +
** Phase 2: PEMEX and Engie
 
* Website:   
 
* Website:   
* Length: kilometres ( miles)  
+
* Length:  
 +
** Phase 1:
 +
** Phase 2: 294 kilometres ( miles)  
 
* Capacity: per day  
 
* Capacity: per day  
* Status: Under Construction
+
* Status: In operation
  
 
+++ Details
 
+++ Details
Line 14: Line 18:
 
** The project consists of a 48“ pipeline with a distance of approximately 114 km
 
** The project consists of a 48“ pipeline with a distance of approximately 114 km
 
** The investment will be 600 million,
 
** The investment will be 600 million,
** The pipeline will run between the towns of Camargo, Tamaulipas, and Los Ramones, Nuevo Leon, and provide a capacity of one billion cubic feet per day (MMcfd)
+
** The pipeline runs between the towns of Camargo, Tamaulipas, and Los Ramones, Nuevo Leon, and provides a capacity of one billion cubic feet per day (MMcfd)
 
*  
 
*  
 
* **Phase II:**  
 
* **Phase II:**  
 
** The project consists of a 42” pipeline with a distance of approximately 740km
 
** The project consists of a 42” pipeline with a distance of approximately 740km
** The project will include the following:
+
** The project includes the following:
 
** Interconnection station with the Transportation System “Los Ramones Phase I” (Receipt point)
 
** Interconnection station with the Transportation System “Los Ramones Phase I” (Receipt point)
 
** Three (3) Compression stations located in: Villagrán, Tamaulipas; Doctor Arroyo, Nuevo León; and Villa Hidalgo, San Luis Potosí.
 
** Three (3) Compression stations located in: Villagrán, Tamaulipas; Doctor Arroyo, Nuevo León; and Villa Hidalgo, San Luis Potosí.
Line 38: Line 42:
 
# [http://killajoules.wikidot.com/blog:4485 The proposed Phase I will Ramones border to Nuevo Leon Tamaulipas]
 
# [http://killajoules.wikidot.com/blog:4485 The proposed Phase I will Ramones border to Nuevo Leon Tamaulipas]
 
# [http://killajoules.wikidot.com/blog:5132 ICA Fluor to Build a $743 Million Gas Pipeline in Mexico]
 
# [http://killajoules.wikidot.com/blog:5132 ICA Fluor to Build a $743 Million Gas Pipeline in Mexico]
 +
# [https://abarrelfull.blogspot.com/2024/01/gdf-suez-starts-construction-of-ramones.html GDF SUEZ starts construction of Ramones II South pipeline, a project to reinforce energy security in Mexico]
 +
 +
[[category:Pipeline]]
 +
[[category:Mexico]]
 +
[[category:Pemex]]

Latest revision as of 16:39, 9 January 2024

Summary Information

  • Source: Texas
  • Destination: Mexico
  • Ownership:
    • Phase 1: PEMEX and Sempra
    • Phase 2: PEMEX and Engie
  • Website:
  • Length:
    • Phase 1:
    • Phase 2: 294 kilometres ( miles)
  • Capacity: per day
  • Status: In operation

+++ Details

  • The pipeline project is designed to supply US natural gas to Mexico. Gas is transported to the border by Agua Dulce‐Frontera gas pipeline
  • **Phase I:**
    • The project consists of a 48“ pipeline with a distance of approximately 114 km
    • The investment will be 600 million,
    • The pipeline runs between the towns of Camargo, Tamaulipas, and Los Ramones, Nuevo Leon, and provides a capacity of one billion cubic feet per day (MMcfd)
  • **Phase II:**
    • The project consists of a 42” pipeline with a distance of approximately 740km
    • The project includes the following:
    • Interconnection station with the Transportation System “Los Ramones Phase I” (Receipt point)
    • Three (3) Compression stations located in: Villagrán, Tamaulipas; Doctor Arroyo, Nuevo León; and Villa Hidalgo, San Luis Potosí.
    • Four (4) Metering & Regulation Stations at the Delivery Points of the INTS located in: San Luis Potosí, San Luis de la Paz, Parque Industrial Queretaro and Apaseo el Alto.
    • Twenty‐two (22) Main Line Valves.
    • One (1) Main Control Room and One (1) Back‐Up Control Room.

+++ Contractors

  • **ICA Fluor:** Engineering, procurement, construction, testing, commissioning and start-up services of a 291.7-kilometer-long, 42-inch diameter pipeline with one compression station (for a total capacity of 1,420 MMCFD), located in the southern portion of the Los Ramones Phase II gas transportation system

+++ History

  • 2014 - ICA Fluor awarded EPC contract for part of phase II

+++ Other Information

  • -

+++ Links

  1. “Los Ramones Phase II” Project Management Presentation Strategy For Natural Gas Supply
  2. The proposed Phase I will Ramones border to Nuevo Leon Tamaulipas
  3. ICA Fluor to Build a $743 Million Gas Pipeline in Mexico
  4. GDF SUEZ starts construction of Ramones II South pipeline, a project to reinforce energy security in Mexico