Difference between revisions of "MacCulloch Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ConocoPhilips * Country: UK * Location: Blocks 15/24b in the Central North Sea * Production start: * Partners: * Type: Oil / Gas * Estimated...") |
Abarrelfull (talk | contribs) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Operator: ConocoPhilips | * Operator: ConocoPhilips | ||
* Country: UK | * Country: UK | ||
* Location: Blocks 15/24b in the Central North Sea | * Location: Blocks 15/24b in the Central North Sea | ||
| − | * Production start: | + | * Production start: 1997 |
* Partners: | * Partners: | ||
* Type: Oil / Gas | * Type: Oil / Gas | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
| − | * The field | + | *The MacCulloch field was developed using an FPSO vessel, the [[North Sea Producer FPSO]]. |
| + | * The MacCulloch reservoir produced light crude, 32-37o API. | ||
| + | * MacCulloch production was via two Drill Centres, West (WDC) and East (EDC), located 1.6 km and 2.9 km to the West and South East of the vessel location respectively. | ||
| + | * Eleven gas lifted production wells produced through two drill centres. Ten wells produced through three flexible flowlines from WDC and one well produced from EDC. Oil and gas were exported from the FPSO vessel to the [[Piper Oil Field | Piper Bravo platform]] through a 10” oil pipeline and 6” gas pipeline. | ||
| + | * Producing around 60,000bbl/day at its peak, production declined to around 7,200 bbl/day gross with five wells remaining online and an average water cut of ~88% prior to the MacCulloch Cessation of Production. | ||
| − | + | === Contractors === | |
| − | * | + | * '''A&P Tyne:''' Construction of Hull |
| − | * | + | * '''SLP:''' Topsides construction |
| − | * | + | * '''BiFab:''' Manifold |
| − | * | + | * '''Emtunga:''' Control Room |
| − | + | === History === | |
* 1995 - Government approval awarded | * 1995 - Government approval awarded | ||
| + | * 1997 - First oil produced | ||
* 2011 - Endeavour Announces Acquisition of 40% | * 2011 - Endeavour Announces Acquisition of 40% | ||
* 2012 - Ithaca acquires a 14% interest from Noble | * 2012 - Ithaca acquires a 14% interest from Noble | ||
| + | * 2015 - Production ceased | ||
| + | * 2019 - Chrysaor acquired Conocophillips's stake in the field | ||
| + | * 2019 - Approval granted for decommissioning | ||
| + | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy | ||
| − | + | === Geology === | |
* | * | ||
| − | + | === Links === | |
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
| + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
# [[List Of Oil Production Platforms In The UK]] | # [[List Of Oil Production Platforms In The UK]] | ||
# [[BiFab Subsea References]] | # [[BiFab Subsea References]] | ||
| Line 33: | Line 43: | ||
# [http://killajoules.wikidot.com/blog:1838 Endeavour Announces Acquisition of U.K. Producing Assets] | # [http://killajoules.wikidot.com/blog:1838 Endeavour Announces Acquisition of U.K. Producing Assets] | ||
# [http://killajoules.wikidot.com/blog:3246 Acquisition of Non-Operated Interests in Cook and MacCulloch UK North Sea Producing Fields] | # [http://killajoules.wikidot.com/blog:3246 Acquisition of Non-Operated Interests in Cook and MacCulloch UK North Sea Producing Fields] | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:UK]] | ||
| + | [[category:Harbour Energy]] | ||
Latest revision as of 13:56, 15 June 2024
Summary Information
- Operator: ConocoPhilips
- Country: UK
- Location: Blocks 15/24b in the Central North Sea
- Production start: 1997
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The MacCulloch field was developed using an FPSO vessel, the North Sea Producer FPSO.
- The MacCulloch reservoir produced light crude, 32-37o API.
- MacCulloch production was via two Drill Centres, West (WDC) and East (EDC), located 1.6 km and 2.9 km to the West and South East of the vessel location respectively.
- Eleven gas lifted production wells produced through two drill centres. Ten wells produced through three flexible flowlines from WDC and one well produced from EDC. Oil and gas were exported from the FPSO vessel to the Piper Bravo platform through a 10” oil pipeline and 6” gas pipeline.
- Producing around 60,000bbl/day at its peak, production declined to around 7,200 bbl/day gross with five wells remaining online and an average water cut of ~88% prior to the MacCulloch Cessation of Production.
Contractors
- A&P Tyne: Construction of Hull
- SLP: Topsides construction
- BiFab: Manifold
- Emtunga: Control Room
History
- 1995 - Government approval awarded
- 1997 - First oil produced
- 2011 - Endeavour Announces Acquisition of 40%
- 2012 - Ithaca acquires a 14% interest from Noble
- 2015 - Production ceased
- 2019 - Chrysaor acquired Conocophillips's stake in the field
- 2019 - Approval granted for decommissioning
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
Geology
Links
- UK Oil and Gas Fields by Approval Date
- UK Oil and Gas Field Approved Decommissioning Programmes
- List Of Oil Production Platforms In The UK
- BiFab Subsea References
- Emtunga Offshore Platform References
- Endeavour Announces Acquisition of U.K. Producing Assets
- Acquisition of Non-Operated Interests in Cook and MacCulloch UK North Sea Producing Fields
- ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries