Difference between revisions of "Galleon Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 22: Line 22:
 
* 1998 - Centrica acquires a stake from Powergen
 
* 1998 - Centrica acquires a stake from Powergen
 
* 2017 - Spirit Energy inherits stake from Centrica
 
* 2017 - Spirit Energy inherits stake from Centrica
 +
* 2024 - RockRose Energy acquired 100% of the field
  
 
=== Geology ===
 
=== Geology ===
Line 28: Line 29:
 
=== Links ===
 
=== Links ===
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[UK Oil and Gas Fields by Approval Date]]
 +
# [[FoundOcean Europe Subsea References]]
 
# [http://killajoules.wikidot.com/archive:exxon-shell-report-startup-of-north-sea-galleon-gas Exxon, Shell Report Startup Of North Sea Galleon Gas Field]
 
# [http://killajoules.wikidot.com/archive:exxon-shell-report-startup-of-north-sea-galleon-gas Exxon, Shell Report Startup Of North Sea Galleon Gas Field]
 
# [http://killajoules.wikidot.com/archive:centrica-strikes-offshore-deal Centrica strikes offshore deal]
 
# [http://killajoules.wikidot.com/archive:centrica-strikes-offshore-deal Centrica strikes offshore deal]
 
# [https://abarrelfull.blogspot.com/2022/09/neptune-energy-completes-acquisition-of.html Neptune Energy completes the acquisition of ENGIE E&P International SA]
 
# [https://abarrelfull.blogspot.com/2022/09/neptune-energy-completes-acquisition-of.html Neptune Energy completes the acquisition of ENGIE E&P International SA]
 +
# [https://a-barrel-full.blogspot.com/2024/08/viaro-energy-signs-agreement-to-take.html Viaro Energy signs agreement to take over Shell & ExxonMobil’s UK Southern North Sea assets]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:RockRose]]

Latest revision as of 12:18, 6 August 2024

Summary Information

  • Operator: Shell
  • Country: UK
  • Location: 048/20a, Southern North Sea
  • Production start: 1994
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Galleon development has a minimum facilities wellhead platform (Galleon PN) located on the southeast portion of the field.
  • The platform is remotely controlled from the Clipper Gas Field
  • Galleon gas flows to the Clipper complex, from where it is transported to the Bacton Gas Plant

Contractors

  • -

History

  • 1992 - Government approval granted for development
  • 1994 - First gas produced
  • 1998 - Centrica acquires a stake from Powergen
  • 2017 - Spirit Energy inherits stake from Centrica
  • 2024 - RockRose Energy acquired 100% of the field

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. FoundOcean Europe Subsea References
  3. Exxon, Shell Report Startup Of North Sea Galleon Gas Field
  4. Centrica strikes offshore deal
  5. Neptune Energy completes the acquisition of ENGIE E&P International SA
  6. Viaro Energy signs agreement to take over Shell & ExxonMobil’s UK Southern North Sea assets