Difference between revisions of "Dvalin Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Operator: | + | * Operator: Harbour Energy |
* Country: Norway | * Country: Norway | ||
* Location: Norwegian Sea | * Location: Norwegian Sea | ||
| − | * Production start: | + | * Production start: 2023 |
| − | * Partners: | + | * Partners: Wintershall Dea has a 55% share. Petoro has 35% and Sval Energi has 10% |
* Type: Gas | * Type: Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
| Line 29: | Line 29: | ||
* 2019 - First production wells drilled | * 2019 - First production wells drilled | ||
* 2021 - Project delayed due to high levels of mercury | * 2021 - Project delayed due to high levels of mercury | ||
| + | * 2021 - Sval Enerji acquires Edison Norge and increases its stake | ||
* 2022 - PDO submitted for Dvalin North | * 2022 - PDO submitted for Dvalin North | ||
* 2023 - First gas from the Dvalin field | * 2023 - First gas from the Dvalin field | ||
| + | * 2023 - Harbour Energy acquired Wintershall's stake | ||
=== Geology === | === Geology === | ||
| Line 41: | Line 43: | ||
# [http://killajoules.wikidot.com/archive:technip-awarded-important-contract-for-dvalin-subsea Technip awarded important contract for Dvalin subsea development] | # [http://killajoules.wikidot.com/archive:technip-awarded-important-contract-for-dvalin-subsea Technip awarded important contract for Dvalin subsea development] | ||
# [https://abarrelfull.blogspot.com/2023/01/dvalin-commercial-production-delayed.html Dvalin commercial production delayed] | # [https://abarrelfull.blogspot.com/2023/01/dvalin-commercial-production-delayed.html Dvalin commercial production delayed] | ||
| + | # [https://abarrelfull.blogspot.com/2023/08/sval-energi-closes-acquisition-of.html Sval Energi closes acquisition of Edison Norge] | ||
# [https://abarrelfull.blogspot.com/2023/01/wintershall-dea-submits-plan-for.html Wintershall Dea submits plan for development of the Dvalin North gas field] | # [https://abarrelfull.blogspot.com/2023/01/wintershall-dea-submits-plan-for.html Wintershall Dea submits plan for development of the Dvalin North gas field] | ||
# [https://a-barrel-full.blogspot.com/2023/08/norwegian-gas-production-increases-on.html Norwegian gas production increases on start-up of Dvalin field] | # [https://a-barrel-full.blogspot.com/2023/08/norwegian-gas-production-increases-on.html Norwegian gas production increases on start-up of Dvalin field] | ||
| + | # [https://a-barrel-full.blogspot.com/2023/12/transformational-acquisition-of.html Transformational acquisition of Wintershall Dea asset portfolio] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:Norway]] | ||
| + | [[category:Harbour Energy]] | ||
Latest revision as of 18:08, 13 January 2024
Contents
Summary Information
- Operator: Harbour Energy
- Country: Norway
- Location: Norwegian Sea
- Production start: 2023
- Partners: Wintershall Dea has a 55% share. Petoro has 35% and Sval Energi has 10%
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Dvalin gas field was previously known as Zidane, consists of two separate structures: Dvalin East and Dvalin West. The water depth is 400 metres.
- The field is located in Production Licence (PL) 435, approximately 15 kilometres northwest of the Heidrun field and 35 kilometres south of the Skarv field in the Norwegian Sea.
- The development concept is a subsea template with four gas producers tied back to the Heidrun platform.
- Gas from the field will be transported via Heidrun through the Polarled Gas Pipeline to the Nyhamna Gas Plant
- Production was delayed when the level of mercury in the gas exceeded what was expected.
Dvalin North
- The Dvalin North gas field is located around 200 km off the coast of Northern Norway, west of Sandnessjøen at a water depth of 420 metres. It is estimated to contain around 84 million barrels of oil equivalent
- The development concept includes drilling three producing wells from a single subsea template, and pipeline connections to the existing Dvalin field located 10km to the south
Contractors
- **Technip**: EPCI contract for the subsea development
- **Aker Solutions:** A production system encompassing a manifold, four subsea trees and a 15-kilometer long umbilical
History
- 2010 - Dvalin Gas Field discovered
- 2012 - A second gas-bearing reservoir was discovered
- 2016 - Contracts awarded for the development
- 2019 - First production wells drilled
- 2021 - Project delayed due to high levels of mercury
- 2021 - Sval Enerji acquires Edison Norge and increases its stake
- 2022 - PDO submitted for Dvalin North
- 2023 - First gas from the Dvalin field
- 2023 - Harbour Energy acquired Wintershall's stake
Geology
- Dvalin consists of two separate structures, Dvalin East and Dvalin West. Both discoveries contain gas in Middle Jurassic sandstones of the Garn and Ile Formations.
Links
- 6507/7-14 S DVALIN, NPD
- Dvalin, Wintershall Dea
- Aker Solutions Wins Subsea Contracts for Dvalin Gas Field
- Technip awarded important contract for Dvalin subsea development
- Dvalin commercial production delayed
- Sval Energi closes acquisition of Edison Norge
- Wintershall Dea submits plan for development of the Dvalin North gas field
- Norwegian gas production increases on start-up of Dvalin field
- Transformational acquisition of Wintershall Dea asset portfolio