Difference between revisions of "Chestnut Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Centrica * Country: UK * Location: central North Sea * Production start: 2008 * Partners: * Type: Oil * Estimated Reserves: * Production Vo...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
* Operator: Centrica
+
* Operator: Spirit Energy
 
* Country: UK
 
* Country: UK
 
* Location: central North Sea
 
* Location: central North Sea
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
* The Chestnut field is operated utilising the [[[Hummingbird Spirit FPSO]]]
+
* The field is no longer in production
 +
* The Chestnut field was operated utilising the [[Hummingbird Spirit FPSO]]
 
* The field was developed using a subsea production well with pressure support provided by a subsea water injection well.  
 
* The field was developed using a subsea production well with pressure support provided by a subsea water injection well.  
 
* The field was discovered by Premier Oil which signed agreements with Brovig Production Services and then Hess, before disposing of their stake to Venture Petroleum, which was later acquire by Centrica
 
* The field was discovered by Premier Oil which signed agreements with Brovig Production Services and then Hess, before disposing of their stake to Venture Petroleum, which was later acquire by Centrica
 
* The field remained undeveloped for a long time, due to its small size and lack of nearby infrastructure
 
* The field remained undeveloped for a long time, due to its small size and lack of nearby infrastructure
  
+++ Contractors
+
=== Contractors ===
 
* **Sevan Marine:** Provision of FPSO
 
* **Sevan Marine:** Provision of FPSO
 
* **Yantai Raffles Shipyard:** FPSO construction 
 
* **Yantai Raffles Shipyard:** FPSO construction 
Line 23: Line 24:
  
  
+++ History
+
=== History ===
 
* 1986 - Chestnut Oil Field discovered by Premier Oil
 
* 1986 - Chestnut Oil Field discovered by Premier Oil
 
* 2000 - Premier Oil signs Agreement to Develop Chestnut Field
 
* 2000 - Premier Oil signs Agreement to Develop Chestnut Field
Line 33: Line 34:
 
* 2009 - Centrica becomes owner following acquisition of Venture Petroleum  
 
* 2009 - Centrica becomes owner following acquisition of Venture Petroleum  
 
* 2014 - Further extension on FPSO & life of field
 
* 2014 - Further extension on FPSO & life of field
 +
* 2017 - Spirit Energy became operator after Centrica / Bayerngas Norge
 +
* 2021 - Spirit Energy submitted decommissioning programme to the regulator
 +
* 2023 - Approval granted for phase 2 decommissioning
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [http://www.nktflexibles.com/NR/rdonlyres/0CFAAACF-73FE-4D14-91EA-3C248EA56CA1/0/Chestnut.pdf Chestnut Field Development, NKT Flexibles]
 
# [http://www.nktflexibles.com/NR/rdonlyres/0CFAAACF-73FE-4D14-91EA-3C248EA56CA1/0/Chestnut.pdf Chestnut Field Development, NKT Flexibles]
# [[[Jotun FPSO References]]]
+
# [[UK Oil and Gas Field Approved Decommissioning Programmes]]
 +
# [[Jotun FPSO References]]
 
# [http://killajoules.wikidot.com/archive:new-gas-discovered-in-indonesia-oil-development-in-u New Gas Discovered in Indonesia, Oil Development in UK]
 
# [http://killajoules.wikidot.com/archive:new-gas-discovered-in-indonesia-oil-development-in-u New Gas Discovered in Indonesia, Oil Development in UK]
 
# [http://killajoules.wikidot.com/archive:chestnut-farm-in-agreement Chestnut Farm - in Agreement]
 
# [http://killajoules.wikidot.com/archive:chestnut-farm-in-agreement Chestnut Farm - in Agreement]
Line 48: Line 53:
 
# [http://killajoules.wikidot.com/blog:4535 Centrica Energy extends production at its Chestnut field with the Hummingbird Spirit]
 
# [http://killajoules.wikidot.com/blog:4535 Centrica Energy extends production at its Chestnut field with the Hummingbird Spirit]
 
# [http://killajoules.wikidot.com/blog:5174 Chestnut FPSO contract and field life extended for another year]
 
# [http://killajoules.wikidot.com/blog:5174 Chestnut FPSO contract and field life extended for another year]
 +
# [https://abarrelfull.blogspot.com/2023/08/spirit-energy-launched-following.html Spirit Energy launched following completion of Centrica and Bayerngas Norge E&P joint venture]
 +
# [https://abarrelfull.blogspot.com/2023/11/decommissioning-programme-submitted-for.html Decommissioning Programme Submitted for North Sea Field]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:Spirit Energy]]
 +
[[category:Decommissioned]]

Latest revision as of 15:03, 30 May 2024

Summary Information

  • Operator: Spirit Energy
  • Country: UK
  • Location: central North Sea
  • Production start: 2008
  • Partners:
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • The field is no longer in production
  • The Chestnut field was operated utilising the Hummingbird Spirit FPSO
  • The field was developed using a subsea production well with pressure support provided by a subsea water injection well.
  • The field was discovered by Premier Oil which signed agreements with Brovig Production Services and then Hess, before disposing of their stake to Venture Petroleum, which was later acquire by Centrica
  • The field remained undeveloped for a long time, due to its small size and lack of nearby infrastructure

Contractors

  • **Sevan Marine:** Provision of FPSO
  • **Yantai Raffles Shipyard:** FPSO construction 
  • **NKT Flexibles:** Delivery of 3 flexible pipes
  • **Aker Kvaerner:** Pre-installation of the platform mooring system, as well as tow and hook up of the platform
  • **Wood Group:** FPSO operation


History

  • 1986 - Chestnut Oil Field discovered by Premier Oil
  • 2000 - Premier Oil signs Agreement to Develop Chestnut Field
  • 2001 - Hess signbed a farm in agreement with Premier
  • 2002 - ENI divests a small stake in the field
  • 2005 - Project development approved by UK Government
  • 2005 - Venture Production signs contract with Sevan Marine for the FPSO
  • 2008 - First oil produced
  • 2009 - Centrica becomes owner following acquisition of Venture Petroleum
  • 2014 - Further extension on FPSO & life of field
  • 2017 - Spirit Energy became operator after Centrica / Bayerngas Norge
  • 2021 - Spirit Energy submitted decommissioning programme to the regulator
  • 2023 - Approval granted for phase 2 decommissioning

Geology

Links

  1. Chestnut Field Development, NKT Flexibles
  2. UK Oil and Gas Field Approved Decommissioning Programmes
  3. Jotun FPSO References
  4. New Gas Discovered in Indonesia, Oil Development in UK
  5. Chestnut Farm - in Agreement
  6. Eni Divests another Portfolio of Non-Core Assets in the UK North Sea
  7. Sevan Marine ASA (SEVAN): Venture and Sevan sign agreement for Chestnut
  8. Aker Kvaerner secures floater installation contract in the North Sea
  9. First oil on FPSO Sevan Hummingbird
  10. Centrica Energy extends production at its Chestnut field with the Hummingbird Spirit
  11. Chestnut FPSO contract and field life extended for another year
  12. Spirit Energy launched following completion of Centrica and Bayerngas Norge E&P joint venture
  13. Decommissioning Programme Submitted for North Sea Field