Difference between revisions of "Uaru FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Name: | + | * Name: Uaru FPSO |
| − | * Field: | + | * Field: [[Uaru_Oil_Field]] |
| − | * Country: | + | * Country: Guyana |
* Ownership: | * Ownership: | ||
* Website: | * Website: | ||
| − | * Field Operated By: | + | * Field Operated By: Exxon |
| − | * Capacity: | + | * Capacity: 250,000 bpd |
| − | * Year of Completion: | + | * Year of Completion: 2026 |
=== Brief Description === | === Brief Description === | ||
| − | * The FPSO will | + | * The Uaru FPSO is named ‘Errea Wittu’, which means ‘abundance’ |
| + | * The FPSO will have a topside designed to produce approximately 250,000 barrels of oil per day and will have associated gas treatment capacity of 540 million cubic feet per day, water injection capacity of 350,000 barrels per day and produced water capacity of 300,000 barrels per day. | ||
| + | * It will be able to store around 2 million barrels of crude oil. | ||
| + | /* The FPSO will serve the Snoek, Mako and Uaru resources in the Stabroek block | ||
=== Contractors === | === Contractors === | ||
| − | * Modec: Front End Engineering and Design | + | * '''Modec:''' Front End Engineering and Design & EPCI |
| + | * '''SOFEC:''' Spread Mooring System | ||
| + | * '''Seatrium:''' Installation and integration of topside modules | ||
=== Status === | === Status === | ||
| − | * | + | * Installation |
=== History === | === History === | ||
* 2022 - Modec awarded Front End Engineering and Design | * 2022 - Modec awarded Front End Engineering and Design | ||
| + | * 2023 - EPCI phase launched following FID | ||
| + | * 2026 - FPSO arrives in Guyana | ||
=== Other Information === | === Other Information === | ||
| Line 30: | Line 37: | ||
# [https://abarrelfull.blogspot.com/2023/04/modec-awarded-feed-contract-for.html MODEC awarded FEED contract for ExxonMobil’s “Uaru” project in Guyana] | # [https://abarrelfull.blogspot.com/2023/04/modec-awarded-feed-contract-for.html MODEC awarded FEED contract for ExxonMobil’s “Uaru” project in Guyana] | ||
| + | # [https://a-barrel-full.blogspot.com/2023/05/modecs-uaru-fpso-project-for-offshore.html MODEC’s Uaru FPSO Project for offshore Guyana proceeds to EPCI Phase] | ||
| + | # [https://a-barrel-full.blogspot.com/2024/05/seatrium-secures-fpso-topsides.html Seatrium Secures FPSO Topsides Integration Contract with MODEC] | ||
| + | # [https://abarrelfull.blogspot.com/2026/10/modec-announces-arrival-of-fpso-errea.html MODEC Announces Arrival of FPSO Errea Wittu in Guyana] | ||
[[Category:FSPO]] | [[Category:FSPO]] | ||
[[Category:Guyana]] | [[Category:Guyana]] | ||
[[Category:Exxon]] | [[Category:Exxon]] | ||
Latest revision as of 10:43, 7 October 2026
Contents
Summary Information
- Name: Uaru FPSO
- Field: Uaru_Oil_Field
- Country: Guyana
- Ownership:
- Website:
- Field Operated By: Exxon
- Capacity: 250,000 bpd
- Year of Completion: 2026
Brief Description
- The Uaru FPSO is named ‘Errea Wittu’, which means ‘abundance’
- The FPSO will have a topside designed to produce approximately 250,000 barrels of oil per day and will have associated gas treatment capacity of 540 million cubic feet per day, water injection capacity of 350,000 barrels per day and produced water capacity of 300,000 barrels per day.
- It will be able to store around 2 million barrels of crude oil.
/* The FPSO will serve the Snoek, Mako and Uaru resources in the Stabroek block
Contractors
- Modec: Front End Engineering and Design & EPCI
- SOFEC: Spread Mooring System
- Seatrium: Installation and integration of topside modules
Status
- Installation
History
- 2022 - Modec awarded Front End Engineering and Design
- 2023 - EPCI phase launched following FID
- 2026 - FPSO arrives in Guyana
Other Information
- -