Difference between revisions of "B11 Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: Malaysia * Location: 170km to the north of Bintulu * Production start: 2003 * Partners: Petronas - 50% * Type: Oil / Gas * Es...") |
Abarrelfull (talk | contribs) |
||
Line 23: | Line 23: | ||
++++ PC4 Development | ++++ PC4 Development | ||
* **MMCOG:** | * **MMCOG:** | ||
− | + | ** Engineering, Procurement & Construction (EPC) of PC4 Drilling Platform | |
− | + | ** Front End Engineering Design Services For PC4 Wellhead Drilling Platform | |
+++ History | +++ History |
Latest revision as of 09:28, 9 January 2023
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: 170km to the north of Bintulu
- Production start: 2003
- Partners: Petronas - 50%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- B11 field is the 4th gas field to be developed by Sarawak Shell Berhad (SSB) in the Central Luconia geological province to supply gas for the MLNG-DUA project in Bintulu. It lies approximately 170km to the north of Bintulu.
- The surface facilities for the B11 complex comprise three n bridge-linked platforms a 9 slot combined drilling/riser platform B11DR-A, a production platform B11P-A and a future compression platform B11K-A, which will be bridge-linked to B11P-A.
- Platform capacity is currently designed for 600 MMscf/d measured at GMS.
- The B12 field is tied back to the B11 complex
- The PC-4 field was developed with unmanned platforms and a tie back to the B11 complex
+++ Contractors
- **MMC:** Detailed Design OF B11P-A Platform
- **MMHE:** B11K-A platform & Topsides
- **Emtunga:** Living Quarter Modules
++++ PC4 Development
- **MMCOG:**
- Engineering, Procurement & Construction (EPC) of PC4 Drilling Platform
- Front End Engineering Design Services For PC4 Wellhead Drilling Platform
+++ History
- 1980 - The B11 gas field was discovered
- 2003 - Shell announces first gas production
- 2006 - PC4 field comes onstream
- 2009 - B11K-A platform installed
+++ Geology
Links
- Detailed Design OF B11P-A Platform (Jan 2002 - July 2002)
- Emtunga Offshore Platform References
- MMCOG Platform References
- Anggerik Laksana Platform References
- Fiberbond Offshore Platform References
- International Protective Coatings Fixed Platform References
- Shell Announces B11 Field, Offshore Sarawak, Is On Stream And Delivering First Gas
- Petronas Makes New Gas Discovery Offshore Sarawak
- B11K-A Substructure Sailed Away