Difference between revisions of "Cecilie Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Ineos * Country: Denmark * Location: North Sea * Production start: 2003 * Partners: Altinex - 61%, DONG - 22%, RWE Dea - 17% * Type: Oil & Gas...")
 
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Ineos
 
* Operator: Ineos
 
* Country: Denmark  
 
* Country: Denmark  
 
* Location: North Sea
 
* Location: North Sea
 
* Production start: 2003
 
* Production start: 2003
* Partners: Altinex - 61%, DONG - 22%, RWE Dea - 17%
+
* Partners: Altinex - 61%, Ineos - 22%, Harbour Energy - 17%
 
* Type: Oil & Gas
 
* Type: Oil & Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The Cecilie field is a satellite to the [[Siri Oil Field | Siri platform]], which provides injection water, lift gas, processing, storage, and export services for Cecilie.  
 
* The Cecilie field is a satellite to the [[Siri Oil Field | Siri platform]], which provides injection water, lift gas, processing, storage, and export services for Cecilie.  
 
* The development has one unmanned wellhead platform with a helideck.  
 
* The development has one unmanned wellhead platform with a helideck.  
Line 17: Line 17:
 
* The field consists of two reservoirs, Cecilie and Connie.
 
* The field consists of two reservoirs, Cecilie and Connie.
  
+++ Contractors
+
=== Contractors ===
 
* **Saipem:** Wellhead Platform and Sealines T&I
 
* **Saipem:** Wellhead Platform and Sealines T&I
  
+++ History
+
=== History ===
 
* 2000 - Cecilie Oil Field discovered
 
* 2000 - Cecilie Oil Field discovered
 
* 2002 - Government approval was received  
 
* 2002 - Government approval was received  
 
* 2003 - Production started
 
* 2003 - Production started
 
* 2017 - Ineos acquired a stake from DONG
 
* 2017 - Ineos acquired a stake from DONG
 +
* 2023 - Harbour Energy acquired Wintershall's stake
  
+++ Geology
+
=== Geology ===
 
* The Cecilie accumulation is a combined structural and stratigraphic trap. It is an anticlinal structure induced through salt tectonics, delimited by faults and redeposited sands.  
 
* The Cecilie accumulation is a combined structural and stratigraphic trap. It is an anticlinal structure induced through salt tectonics, delimited by faults and redeposited sands.  
  
+++ Links
+
=== Links ===
 
# [[Saipem Europe Fixed Offshore Production Facilities Project R]]
 
# [[Saipem Europe Fixed Offshore Production Facilities Project R]]
 
# [http://www.rwe.com/web/cms/en/54910/rwe-dea/operations-worldwide/operations/denmark/ RWE Dea, Denmark]
 
# [http://www.rwe.com/web/cms/en/54910/rwe-dea/operations-worldwide/operations/denmark/ RWE Dea, Denmark]
 +
# [https://abarrelfull.blogspot.com/2022/12/ineos-to-buy-entire-oil-gas-business.html INEOS to buy the entire Oil & Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent]
 +
# [https://a-barrel-full.blogspot.com/2023/12/transformational-acquisition-of.html Transformational acquisition of Wintershall Dea asset portfolio]
 +
 +
[[category:Field]]
 +
[[category:Denmark]]
 +
[[category:Ineos]]

Latest revision as of 17:59, 13 January 2024

Summary Information

  • Operator: Ineos
  • Country: Denmark
  • Location: North Sea
  • Production start: 2003
  • Partners: Altinex - 61%, Ineos - 22%, Harbour Energy - 17%
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Cecilie field is a satellite to the Siri platform, which provides injection water, lift gas, processing, storage, and export services for Cecilie.
  • The development has one unmanned wellhead platform with a helideck.
  • The unprocessed production is transported to the Siri platform through a 12” multiphase pipeline.
  • The oil is processed at the Siri platform and exported to shore via tanker.
  • The gas produced is injected into the Siri Field.
  • The field consists of two reservoirs, Cecilie and Connie.

Contractors

  • **Saipem:** Wellhead Platform and Sealines T&I

History

  • 2000 - Cecilie Oil Field discovered
  • 2002 - Government approval was received
  • 2003 - Production started
  • 2017 - Ineos acquired a stake from DONG
  • 2023 - Harbour Energy acquired Wintershall's stake

Geology

  • The Cecilie accumulation is a combined structural and stratigraphic trap. It is an anticlinal structure induced through salt tectonics, delimited by faults and redeposited sands.

Links

  1. Saipem Europe Fixed Offshore Production Facilities Project R
  2. RWE Dea, Denmark
  3. INEOS to buy the entire Oil & Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent
  4. Transformational acquisition of Wintershall Dea asset portfolio