Difference between revisions of "Moscow Refinery Euro V+ Project"

From A Barrel Full
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
* Website: http://www.gazprom-neft.com/
 
* Website: http://www.gazprom-neft.com/
 
* Location: Moscow, Russia
 
* Location: Moscow, Russia
* Wiki Page: [[[Moscow Refinery]]]
+
* Wiki Page: [[Moscow Refinery]]
* Location: 
 
 
* Capacity:  million tons/annum & bbl/day  
 
* Capacity:  million tons/annum & bbl/day  
 
* Nelson Complexity:  
 
* Nelson Complexity:  
* Project Stage:
+
* Project Stage: Completed
* Expected Completion:  [[[Refinery Projects to be Completed in 2019 | 2019]]]
+
* Expected Completion:  [[Refinery Projects completed 2020 | 2020]]
 
 
 
* Budget:
 
* Budget:
  
+++ The Project
+
=== The Project ===
  
 
* Project Type: Upgrade
 
* Project Type: Upgrade
* Project Summary:
+
* Project Summary: The “Euro+” facility is the most important project under Phase II of the Moscow Refinery’s modernisation. This high-tech complex is the first in Russia’s refining industry to cover the full production cycle, from Stage 1 oil refining to the production of gasoline and diesel fuels (including winter diesels) and aviation kerosene. The Euro+ complex is replacing five obsolete previous-generation facilities, and will take refining depth to 85% while also allowing production volumes of highly marketable petroleum products to increase.
 
* Main Contractors
 
* Main Contractors
 +
* Licences: Axens for the FCC
  
+++ Refining Units
+
=== Refining Units ===
  
 
* Vacuum distillation unit
 
* Vacuum distillation unit
 
* Fluidised catalytic cracker
 
* Fluidised catalytic cracker
  
+++ Terminal Capacity
+
=== Terminal Capacity ===
  
 
* Crude Oil:  
 
* Crude Oil:  
 
* Refined Products:  
 
* Refined Products:  
  
+++ Crude Supply
+
=== Crude Supply ===
  
 
* -
 
* -
  
  
+++ Products Produced
+
=== Products Produced ===
  
 
* The project will result in more gasoline and less residual fuel oil
 
* The project will result in more gasoline and less residual fuel oil
  
+++ History
+
=== History ===
  
 +
* 2015 - The project was launched
 
* 2017 - The VDU was delivered to the site
 
* 2017 - The VDU was delivered to the site
 +
* 2020 - The project was completed
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
 
  
 
=== Links ===
 
=== Links ===
  
 +
# [https://abarrelfull.blogspot.com/2022/01/gazprom-neft-begins-reconstruction-of.html Gazprom Neft begins reconstruction of catalytic cracking facility at Moscow Refinery]
 
# [http://killajoules.wikidot.com/archive:russian-produced-equipment-for-construction-of-a-eur/ Russian-Produced Equipment For Construction Of A Euro+ Refining Facility At Gazprom Neft’s Moscow Refinery Is Delivered To Moscow]
 
# [http://killajoules.wikidot.com/archive:russian-produced-equipment-for-construction-of-a-eur/ Russian-Produced Equipment For Construction Of A Euro+ Refining Facility At Gazprom Neft’s Moscow Refinery Is Delivered To Moscow]
 +
# [https://abarrelfull.blogspot.com/2022/01/president-of-russia-vladimir-putin.html President of Russia Vladimir Putin launches the new high-tech “Euro+” complex at the Gazprom Neft Moscow Refinery]

Latest revision as of 12:02, 11 January 2022

Summary Information

The Project

  • Project Type: Upgrade
  • Project Summary: The “Euro+” facility is the most important project under Phase II of the Moscow Refinery’s modernisation. This high-tech complex is the first in Russia’s refining industry to cover the full production cycle, from Stage 1 oil refining to the production of gasoline and diesel fuels (including winter diesels) and aviation kerosene. The Euro+ complex is replacing five obsolete previous-generation facilities, and will take refining depth to 85% while also allowing production volumes of highly marketable petroleum products to increase.
  • Main Contractors
  • Licences: Axens for the FCC

Refining Units

  • Vacuum distillation unit
  • Fluidised catalytic cracker

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -


Products Produced

  • The project will result in more gasoline and less residual fuel oil

History

  • 2015 - The project was launched
  • 2017 - The VDU was delivered to the site
  • 2020 - The project was completed

Other Information

  • -

Links

  1. Gazprom Neft begins reconstruction of catalytic cracking facility at Moscow Refinery
  2. Russian-Produced Equipment For Construction Of A Euro+ Refining Facility At Gazprom Neft’s Moscow Refinery Is Delivered To Moscow
  3. President of Russia Vladimir Putin launches the new high-tech “Euro+” complex at the Gazprom Neft Moscow Refinery