Difference between revisions of "Everest Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Habour Energy * Country: UK * Location: 240km north east of Aberdeen * Production start: 1993 * Partners: * Type: Gas & Condensate * Es...") |
Abarrelfull (talk | contribs) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
* The Everest gas/condensate field is located 240km north east of Aberdeen in Blocks 22/9, 22/10a and 22/14a (Licence Nos P.101, P.066 and P.110) in the UK sector of the Northern North Sea. It is a fixed steel platform with a bridge link to the Central Area Transmission System (CATS) riser platform. | * The Everest gas/condensate field is located 240km north east of Aberdeen in Blocks 22/9, 22/10a and 22/14a (Licence Nos P.101, P.066 and P.110) in the UK sector of the Northern North Sea. It is a fixed steel platform with a bridge link to the Central Area Transmission System (CATS) riser platform. | ||
* South Everest includes two wells and a 7.1 km tie back to the **North Everest platform** | * South Everest includes two wells and a 7.1 km tie back to the **North Everest platform** | ||
− | * Gas is transported by [[ | + | * Gas is transported by [[CATS Central Area Transmission System Gas Pipeline | CATS]] to Teesside. |
− | * Liquids are transported via the | + | * Liquids are transported via the [[Forties Pipeline System]] (FPS) to Cruden Bay and onwards to Kinneil for processing. |
* Everest which is operated by BG Group was discovered in 1982 and started production in May 1993. | * Everest which is operated by BG Group was discovered in 1982 and started production in May 1993. | ||
* The latest development is Everest East, which comprises two sub-sea wells tied back to the North Everest platform | * The latest development is Everest East, which comprises two sub-sea wells tied back to the North Everest platform | ||
Line 22: | Line 22: | ||
* **HSM Offshore:** Living Quarters | * **HSM Offshore:** Living Quarters | ||
* **South Everest** | * **South Everest** | ||
− | + | ** Subsea trees - ABB Vetco Gray | |
− | + | ** Well Placement - Baker Hughes Intec | |
− | + | ** Fluids - Baker Hughes Intec | |
− | + | ** Cementing - Halliburton | |
− | + | ** Subsea Controls and Umbilical - Kvaerner Oilfield products | |
− | + | ** Flexible Flowline - NKT Flexibles | |
− | + | ** Well Management - Schlumberger Dowell Camco | |
− | + | ** Subsea construction - Stolt Comex Seaway | |
− | + | ** Topsides design and Engineering - Wood Group Engineering | |
− | + | ** Control of pipe manufacture - J P Kenny | |
− | |||
=== History === | === History === | ||
Line 41: | Line 40: | ||
* 2009 - BG Group acquired BP's share in a swap deal, becoming the largest partner | * 2009 - BG Group acquired BP's share in a swap deal, becoming the largest partner | ||
* 2013 - Everest East starts production | * 2013 - Everest East starts production | ||
+ | * 2015 - Shell acquired BG Group and became the operator | ||
* 2017 - Chrysaor acquired Shell's stake in the field. | * 2017 - Chrysaor acquired Shell's stake in the field. | ||
+ | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy | ||
=== Geology === | === Geology === | ||
Line 48: | Line 49: | ||
=== Links === | === Links === | ||
# [http://www.uk.total.com/activities/non_operated.asp Total, NON OPERATED UK ASSETS] | # [http://www.uk.total.com/activities/non_operated.asp Total, NON OPERATED UK ASSETS] | ||
− | # | + | # [[UK Oil and Gas Fields by Approval Date]] |
− | # | + | # [[List Of Oil Production Platforms In The UK]] |
− | # | + | # [[HSM Offshore Platform References]] |
− | # | + | # [[J P Kenny Subsea References]] |
# [http://killajoules.wikidot.com/archive:bg-group-completes-uk-north-sea-asset-exchange-with BG Group completes UK North Sea asset exchange with BP] | # [http://killajoules.wikidot.com/archive:bg-group-completes-uk-north-sea-asset-exchange-with BG Group completes UK North Sea asset exchange with BP] | ||
# [http://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/U/uk_asset_everest.pdf Everest Field, BP] | # [http://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/U/uk_asset_everest.pdf Everest Field, BP] | ||
# [http://killajoules.wikidot.com/blog:3964 BG Group delivers key project milestone with Everest East expansion] | # [http://killajoules.wikidot.com/blog:3964 BG Group delivers key project milestone with Everest East expansion] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell] | ||
# [https://abarrelfull.blogspot.com/2021/11/shell-to-sell-package-of-uk-north-sea.html Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn] | # [https://abarrelfull.blogspot.com/2021/11/shell-to-sell-package-of-uk-north-sea.html Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:UK]] | [[category:UK]] | ||
+ | [[category:Harbour Energy]] |
Latest revision as of 07:48, 31 January 2024
Summary Information
- Operator: Habour Energy
- Country: UK
- Location: 240km north east of Aberdeen
- Production start: 1993
- Partners:
- Type: Gas & Condensate
- Estimated Reserves: – 770 bcf gas; 25 million barrels condensate; 1 million barrels natural gasified liquids (NGLs)
- Production Volume:
Description
- The Everest gas/condensate field is located 240km north east of Aberdeen in Blocks 22/9, 22/10a and 22/14a (Licence Nos P.101, P.066 and P.110) in the UK sector of the Northern North Sea. It is a fixed steel platform with a bridge link to the Central Area Transmission System (CATS) riser platform.
- South Everest includes two wells and a 7.1 km tie back to the **North Everest platform**
- Gas is transported by CATS to Teesside.
- Liquids are transported via the Forties Pipeline System (FPS) to Cruden Bay and onwards to Kinneil for processing.
- Everest which is operated by BG Group was discovered in 1982 and started production in May 1993.
- The latest development is Everest East, which comprises two sub-sea wells tied back to the North Everest platform
Contractors
- **Highlands Fabricators:** North Everest platform
- **HSM Offshore:** Living Quarters
- **South Everest**
- Subsea trees - ABB Vetco Gray
- Well Placement - Baker Hughes Intec
- Fluids - Baker Hughes Intec
- Cementing - Halliburton
- Subsea Controls and Umbilical - Kvaerner Oilfield products
- Flexible Flowline - NKT Flexibles
- Well Management - Schlumberger Dowell Camco
- Subsea construction - Stolt Comex Seaway
- Topsides design and Engineering - Wood Group Engineering
- Control of pipe manufacture - J P Kenny
History
- 1982 - Everest field discovered
- 1991 - Approval granted for development
- 1993 - Production starts
- 1999 - South Everest project launched
- 2009 - BG Group acquired BP's share in a swap deal, becoming the largest partner
- 2013 - Everest East starts production
- 2015 - Shell acquired BG Group and became the operator
- 2017 - Chrysaor acquired Shell's stake in the field.
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
Geology
Links
- Total, NON OPERATED UK ASSETS
- UK Oil and Gas Fields by Approval Date
- List Of Oil Production Platforms In The UK
- HSM Offshore Platform References
- J P Kenny Subsea References
- BG Group completes UK North Sea asset exchange with BP
- Everest Field, BP
- BG Group delivers key project milestone with Everest East expansion
- Recommended cash and share offer for BG Group by Royal Dutch Shell
- Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn
- Harbour Energy to be admitted to trading